junction rail 中文意思是什麼

junction rail 解釋
接合軌
  • junction : n. 1. 接合,連接,連絡。2. 接合點,交叉點,(河流的)匯合處,(鐵道的)聯軌點。3. 【電學】中繼線。4. 【物理學】接頭,結。
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  1. The jdf - 2 type case hanging basket guards against automatically falls mainly uses in the direct motor drive hoisting mechanical well type case hanging basket, as the type case hanging basket using of safekeeping of security, it installs in the hanging basket crossbeam both sides, along including guide rail is rising and falling, when the motor drive type case hanging basket in the fluctuation process, meets overweight, overspeed, steel wire attrition and other reasons creates the hoisting cable or the junction device snaps suddenly, when under hanging basket weightlessness falls, guards against falls can automatic brake, thus achieved avoids falling the basket to offend somebody

    Jdf - 2型井字架吊籃自動防墜器主要用於由電動機驅動的卷揚機井字架吊籃,作為井字架吊籃的安全保護之用,它安裝在吊籃橫梁的兩側,沿含著導軌升降,當由電動機驅動的井字架吊籃在升降過程中,遇超重超速鋼絲繩磨損等原因而造成提升鋼絲繩或連接裝置突然破斷,吊籃失重下墜時,防墜器能自動剎車,從而達到避免墜籃傷人重大事故發生的目的。
  2. Where a road junction is crossed by tram tracks or light rail tracks and is marked with crossing box markings, you must not enter the box from any approach lane including a right turn lane unless the exit is clear

    如路口有電車或輕鐵路軌,並劃上黃色方格,則除非出口暢通無阻,否則切勿從任何行車包括右轉駛入方格內。
  3. Alternatively, take the kcr east rail to tai wai station. follow the sign for the che kung temple, proceed to che kung miu road, walk northward and look for the sign " jat min chuen ". at the junction with sha kok road, turn right and proceed to the slip road leading to tsang tai uk

    另外,亦可乘九廣東鐵抵達大圍站,依照往車公廟的指示牌到達車公廟路后,繼續向北走,並留意往乙明村的指示牌,走至與沙角街的交界處時轉右,沿小路直上,便可到達曾大屋。
  4. Construction works for the 4. 4km tin shui wai light rail extensions are now taking place at the junction of tin wah road and tin shui road. the contractor is carrying out piling works for the light rail viaducts and building an elevated light rail stop that will link the stop with nearby housing estates and shopping malls. at other sections of the extensions, the contractor is working on the surcharge

    4公里的天水圍新支線工程,現時工程主要集中在天華路天瑞路交匯處,承建商正興建架空橋的樁柱,該處將設置一個架空車站,連接鄰近的屋?及商場,至於其他路段,現時主要是進行壓土工程。
  5. The aim of the project is to enhance the operational efficiency and safety of the light rail system as well as road traffic at the junction

    工程旨在提升輕鐵及路面交匯處的運作效率及安全水平。
  6. An elevated light rail stop will be built above the junction of tin wah road and tin shui road of the tin shui wai reserve zone extensions

    九鐵將會在天水圍預留區支線的天華路及天瑞路交?處興建架空輕鐵車站。
  7. The light rail grade separation works at tsing lun road involve the elevation of a 300 - metre long10. 5 - metre wide section of track across the light railroad junction at tsing lun road. a footbridge with lifts will also be built to the west of the elevated viaduct

    屯門青麟路架空輕鐵路軌工程涉及的架空路軌長三百米、闊十米半,橫跨現時的青麟路輕鐵路面交匯處,以及在輕鐵高架橋西面興建一條附有升降機的行人天橋。
分享友人