landslide dam 中文意思是什麼

landslide dam 解釋
崩坍形成的壩
  • landslide : 1. = landslip. 2. 〈美國〉(選舉的)大勝利;壓倒的優勝 (the momentum of a landslide 排山倒海之勢)。
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石方檢測路基不同回填物界面檢測填海回填物巖溶檢測樁基無損檢測地下管道探測地下隱蔽物探測考古斜坡滑體探測地質結構探測湖底探測高速公路路面及路基檢測。
  2. This article deals with the analysis carried out in association with measured creep process before and after initial dam impoundment when landslide occurs, which suggests that the landslide undergoes both acceleration and deceleration procedures as the water level increases and ends up with retarded creep state after the water level is in stabilized status

    本課題對滑坡初期蓄水前後實測蠕滑過程進行了分析,證明滑坡在水位上升過程中經歷了加速和減速過程,水位穩定后進入減速蠕變狀態。
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  5. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  6. The dam protected height is determined as 15m higher above reservoir water level during initial reservoir impounding period in order to preventing surge damage caused by landslide

    李家峽水電站壩前號滑坡屬有蠕滑活動的老滑坡,體積為1845 104m ~ ,為預防滑坡涌浪危害,初期蓄水期間壩前設防高度15m 。
  7. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    堵江潰壩及涌浪研究結果表明,局部的邊坡失穩在壩址處引起的涌浪高達6m ,並可能形成高約33m的滑坡堵江壩,潰決洪水將在金江至溪洛渡河段形成15841 7613m ~ 3 / s的洪峰流量,使得此段江水位上漲11 4m 。
  8. Landslide hazard mitigation works including earthworks, installation of soil nail, concrete check dam and flexible boulder fence, drainage works and maintenance access road works

    山坡災害防護工程,包括土木工事、裝設泥釘、擋土堤和柔性防石欄、排水工程和維修通道工程。
  9. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  10. Because the location of landside is too close to the dam which presents risks to some extent, the treatment methodology involved in local excavation and local slide promotion for no. 2 landslide has been proposed

    鑒于滑坡距壩太近,有一定風險,據此提出對號滑坡分別作局部開挖和局部促滑的處理方案。
  11. Because of those, the paper systems analysis the complicated geological environment, the character of rock mass ' s stress field and the stability of landslide on the right bank, in addition, the paper also deeply studied the geological engineering problem after the dam was builded in order to provide science datum for engineering decision, and elicited several conclusion : ( 1 ) the character of rock mass ' s stress - strain and new structure stress fieldrfrom the middle of q3 to today, the direction of the maximal principal stress has already changed to the sn, the stress - strain action and three direction of stress have been changed from " potential positive break " to " potential slide "

    同時通過以上的分析研究本文得出了以下主要的結論與認識: ( 1 )最新構造應力場與地殼巖體應力?形變作用的現今特徵:自晚更新世( q _ 3 )中期以來,區域應力場的最大主應力( _ 1 )作用方向轉為近南北向( n10 w )作用並一直持續至今,地殼巖體的三向應力狀態及應力?形變作用經歷了由早期的「潛在正斷型」轉變到近期的「潛在走滑型」兩個不同的發展階段。
分享友人