leading-out end 中文意思是什麼

leading-out end 解釋
引出端
  • leading : n 1 鉛制覆蓋物。2 空鉛,鉛條,鉛皮。n 1 領導,指導。2 引導。adj 1 指導的,領導的。 a leading cadr...
  • out : adv 1 〈位置及運動的方向〉向外,向外部;在外,在外部;出去,出外,離開;離岸,向海面;(船等)開...
  • end : n 1 端,尖,末端,終點。2 邊緣;極點,極限。3 結局,結果。4 目的。5 最後,死。6 【紡織;印染】經...
  1. The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too

    第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。
分享友人