line building 中文意思是什麼

line building 解釋
行列式建築
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. By building the data ware house and using on line analysis process, engineer can analysis the cathode and anticathode from different view

    並利用回歸分析分析組內各點存在的關系和變化趨勢,利用多維分析的手段展示挖掘結果。
  3. Question 4 : would you provide us with the design area scope, esp. the right - of - way and the building line

    能否明確本次設計可規劃范圍,特別是站房用地紅線及建築控制線范圍?
  4. The old city is a maze : three - and four - story building line the narrow streets, which seldom run straight for more than a few hundred yards

    舊城宛如迷宮:三、四層樓的建築在狹窄街道的兩旁林立,很少街道在幾百碼之後還維持筆直。
  5. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受應自建築線或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計施工編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  6. Demarcation of red line centrality zone of building at both sides of highway

    公路兩側建築紅線控制區的界定
  7. The current travel the main contents of culture stanzas to include the building mountain district exquisite article the resources to display, the literature performance wait the activity. the building mountain that rites part is solemn is cultured, and perform the part of and happiness and crazy, outstanding suburb color, mold the clear suburb topic of to emerge with the consciousness with the the new atmosphere to travel the area of big area, culture. the current travels the culture stanza with the happy suburb, sahuan building mountain " for the topic, travel the culture stanza the opening ceremony and saint mountain the scenery to spend a holiday the area to start practice the celebration ceremony the rites, building mountain the economic trade to talk over the meeting with the tenth building mountain, continuously the fire of the human civilization the motherland is good, the capital city is beautiful " three corpus activities of activities of publicity educations are with the stanza of white grass cookhouse ground sahuan son ", ten cross river the light stanza, celebrate the 7 1 " hall the whole image for ascending folk king of country whip performing, cloud residing the the series the activity, the spending the hole, silver the fox the hole, fairy the the hole, cloud the water hole " fourth holes look foring the competing and go to the countrying is a farmering, cut in lining " experience personallying a day swiming sixth items prop upping the activity to main contents, molding the root in peking the, hole the kingdom " ; release the north line of building mountain to travel the hallway, and adjust the mountain area the environment of economic construction, ecosystem, and promote the farmer to increase to accept, quickly the building mountain travel a developments step, and go on a tour for whole municipal and periphery visitor, recreational, the amusement invest with chinese and foreign businessman to start a business the offering is more, more ideal choice. attraction the more people travel the building the mountain, investment into the building mountain, and further push that area to completely develop

    儀式部分莊重典雅,表演部分歡樂狂野,突出郊野色彩,塑造鮮明的郊野主題和親和意識,展現房山旅遊大區文化名區的新氣象。本屆旅遊文化節以「 happy郊野撒歡房山」為主題,以第十屆房山旅遊文化節開幕式暨聖蓮山風景度假區開業慶典儀式房山經貿洽談會續燃人類文明之火「祖國好京城美」宣傳教育活動三項主體活動和白草畔野營地「撒歡兒節」十渡河燈節慶「七一」堂上鄉村民俗霸王鞭表演雲居寺祈福迎祥系列活動「石花洞銀狐洞仙棲洞雲水洞」四洞尋寶比賽及下鄉務農「插隊」體驗一日游六項支撐活動為主要內容,塑造「北京根祖,溶洞王國」的整體形象推出房山北線旅遊走廊,調整山區經濟結構,優化生態環境,促進農民增收,加快房山旅遊黃金圈建設步伐,為全市及周邊遊客出遊休閑娛樂和中外客商投資創業提供更多更理想的選擇。吸引更多的人旅遊到房山投資進房山,進一步推動該區全面發展。
  8. Firstly, to accelerate the building and perfection of key networks ; for the network construction in 10 provinces in the north of china, the principles of competition first and benefit first will be applied and more emphasis will be placed on key regions and key businesses ; to speed up the construction and perfection of the emulative business network, make up for the deficiency, make the network complete and build telephone line network moderately ; according to market demand, to build and perfect broadband city network and residence access into the network

    第一,加快重點網路的建設和完善。北方10省網路建設總體上將本著競爭優先、效益優先的原則,向重點地區、重點業務傾斜。進一步加快建設和完善競爭性業務網路;搞好補缺配套,適度建設電話網;根據市場需求,建設和完善寬帶城域網和駐地接入網。
  9. Article 24 the local people ' s governments at various levels sha1l organize agricultura1 collective economic organizations and farmers to manage in a planned way the cultivated land with a slope of above 5 degrees but under the reclamation - forbidden degrees, by taking in line with different conditions such water and soil conservation measures as regulating drainage systems, building terraced fields, and practicing a method of cultivation conducive to water and soi1 conservation

    第二十四條各級地方人民政府應當組織農業集體經濟組織和農民,有計劃地對禁止開墾坡度以下、五度以上的耕地進行治理,根據不同情況,採取整治排水系統、修建梯田、蓄水保土耕作等水土保持措施。
  10. The bank of shanghai of university of shanghai, the park of zhabei of construction bank railway hospital, the green sea new station on the ground of daning, the subway extends line ( in building ), inner loop, zhonghuan ( while planning ), overhead on the 1st, form the three - dimensional network of communication lines

    上海大學上海銀行,建行鐵道醫院閘北公園,大寧綠地上海新客站,地鐵1號延伸線(在建中) 、內環、中環(規劃中) 、高架,形成立體交通網。
  11. Company has possessed 600 employess, over 68manag. ement personnel and 22 technicians since is was founded. inwhich junior college graduatre account for 90 %, average ages of employees is 28 years, area of factory building is 20000sq. meter annusi value of production is 80 milions yuan and have three modemization production line and advanced equipment and perfct monitor and measunng device as puncher, driller, lathe, measurig truck, cutter, shielded welder and pipe bendin machine. main production of company are all kinds of generators, both petrol and dlesel series, water umps, luggage rack of vehicle, bumper, fuel tankall kinds of motorcycle rack, auto majhong machine and whd series of dlecmolishde vehide, wide varieties, a complete range of specification. the products have stable qusity and advanced

    具備廠房面積20000平方米,年產值8000多萬元的生產能力及三條現代化流水線。擁有各種大型沖壓設備各類油箱鉆床車床儀表車切割機保護焊機彎管機等先進設備和完善的測量裝置。公司主要品種有:各種發電機組汽油機系列柴油機系列水泵汽車行李架保險杠各種摩托車架全自動麻將桌whd系列電動滑板車,防墜器等系列產品。
  12. The “ genabon ” series product has : the environmental protection foam rubber paint, water wooden vessel paint, polyester repairs the paint, flexibility texture suffers the coating and have no the benzene poison nitric paint, furniture industry uses the paint and have no the benzene all - powerful gum, refractory coating, arrest burnt two use to repair the paint and have no the not poisonous condensate in benzene turn, have no the benzene dilution a printing ink, oil building coating, ground ping paint, street nark line the paint, industry antisepsis coating etc

    「金耐寶」系列產品有:環保乳膠漆、水性木器漆、聚酯裝修漆、彈性質感受塗料、無苯毒硝基漆、傢具工業用漆、無苯萬能膠、防火塗料、阻燃兩用裝修漆、無苯無毒固化劑、無苯稀釋劑、特種油墨、油性建築塗料、地坪漆、馬路標線漆、工業防腐塗料等。
  13. Metallurgical near national famous scenic spot of the southeast of building and repair plant of a subsidiary a steel - making of enterprise - like corporation of steel of saddle - a thousand mountains, adjoin the expressway of shenyang and dalian in the northwest, there is a special - purpose line of railway that connects the railway of shenyang and dalian in the factory directly

    鞍鋼附屬企業公司一煉鋼冶金修造廠東南面比鄰國家著名風景區-千山,西北面毗鄰沈大高速公路,廠區內有鐵路專用線直接連接沈大鐵路。廠區面積8萬多平方米,工業建築面積近2萬平方米,擁有所有者權益5000多萬元。
  14. Webbing sling, round sling, lifting sling, nylon rope, rope ladder, cargo net lifting sling belt group have a long history for more than 46 years of specializing in different types of slings, mainly products including polyester webbing sling, polyester round sling, polyester cargo lashing, super sing, flat sling, flat webbing sling, flat web sling, polester web sling, tree strap, webbing strap, doublebraid, recovery strap, recovery tow strap, lashing systems, polyester sling, polyester belt sling, hollow braid, synthetic webbing, endless sling, nylon sling, synthetic web sling, synthetic sling, webbing sling, round sling, cargo lashing, ratchet tie down, ratchet lashing, ratchet strap, ratchet tie down strap, nylon webbing, nylon strap, tubular round ropes, braided rope, diamond braid rope, starter rope, safety net, safety belt, cargo net, safety rope, climbing rope, rope ladder, building net, nylon net, polyester webbing sling, polyester round sling, tie down, cargo restraint, webbing strap, duplex eye - eye webbing sling, eye - eye webbing sling endless webbing sling, widely and heavy duty webbing sling, multi - sling, ratchet lashing, tow strap, web belt sling, flat webbing sling, nylon rope ladder, industrial safety nets, nylon cargo net, dock net, synthetic webbing sling, lifting clamp, braided rope, 3 strand rope, 12 strand rope, 8 strand rope, cargo net, shipmast net, tube net, solid braided rope, braided rope net, sports net, pe net, safety net, scaffold net, synthetic slings, wide lift sling, round webbing sling, flat webbing sling with eyes, flat webbing endless sling, wire rope sling, multi - set sling, pipe lifting sling, pipeline sling, lowering belt, heavy duty anti cutting sleeves, fiberglass rope, fiberglass wick, braided fiberglass rope, fiberglass rope lamp, fiberglass oil lamp wick, fiberglass strap, solid braided fiberglass rope - round, fiberglass tapes, ceramic fiber rope, fiberglass braided rope, pipe handling sling, lowering in belts, stone handling sling, flat lifting sling pipe lifting belt synthetic fiber round sling synthetic lifting sling, synthetic fiber sling, nylon webbing strap, pipe sling, bandsling, pipe sling with reinforced eyes, lifting sling with reinforced eyes, pipeline pipe industrial farm lifting sling, endless sling, eye eye sling, oil field sling, truck strap, winch strap, cargo tie down, track ratchet strap, tow strap winch flat rope tow line, heavy duty webbing towing lifting sling, cargo sling, pp cargo sling, polyester cargo sling, flat pack sling, ceramic fiber rope twisted rope braided round rope braided square rope

    2圓形尼吊裝繩系列:無接頭尼吊裝繩兩頭扣尼吊裝繩多叉尼吊裝繩船用錨繩纜繩引紙繩變壓器吊裝繩各種規格編織吊繩,尼繩,啟動拉繩,啟動繩,引擎拉繩,引擎繩,起動拉繩,起動繩,動力繩,安全清洗繩,安全繩,保險繩,耐火救生繩,維綸繩,丙綸繩,滌綸繩,錦綸繩,尼吊繩,尼吊裝繩,錨繩,靠岸繩,旗繩,晾衣繩,復合吊繩,掛衣繩,宿營繩,保護繩,防火繩,尼網,休閑吊網,跳繩,蠶絲繩,全棉繩,塑膠繩,布繩,拔河繩,攀巖繩,遊艇繩,綿綸絞制繩,織制繩,登山繩,拔河繩,立桿繩,水平繩,工藝繩,吊繩,船用纜繩,絞制纜繩,綿綸絕緣繩,三股繩,八股繩,軍用繩,線路牽引繩,吊棕繩,割刀繩,引紙繩,包裝袋繩,禮品盒繩,酒盒繩,食品盒繩,手提袋用繩,禮品盒用繩,工藝品用繩,服裝用繩,聚乙烯繩,聚丙烯繩,混紡繩,纖維綸繩,復絲繩,撕裂膜繩,編織繩,加鉛繩,功能繩,軟梯繩,尼軟梯,軟梯,尼繩梯,尼梯繩,安全網,棉繩,彈力橡筋繩,嵌邊繩,封蠟繩等,啟動繩啟動拉繩引擎繩引擎拉繩起動拉繩,雙編織繩,金剛打編織繩,股編織繩,股編織繩,多股編織繩。
  15. Since china ' s reform and its opening to the outside world, langxiang forestry bureau has insisted on carrying out “ putting forestry in the first place, comprehensive development with five industries and make enterprise and people strong ” economic development strategies, it has constantly adjusted industrial structure, strengthened the development of new products, which are as follows : log, saw materials, shaving board, decorating board, glued wood, wood floor, wooden furniture, solid wood door, building materials, farming and side - line products ten series and more than 200 products

    改革開放以來,朗鄉林業局堅持實施了「以林為主,綜合開發,五業並舉,興企富民」的經濟發展戰略,不斷調整產業結構,加大了新產品開發力度,產品有原木、鋸材、刨花板、裝飾板、膠合板、地板塊、木製傢具、實木門、建材、林副產品等10多個系列200多個品種。
  16. The working place is located in zhang jiang tower, a modern office building located near metro line 2 in zhangjiang high tech zoon. with very convenient traffic, csc welcome you

    工作地點位於張江大廈,位於張江高科技園區地鐵二號線終點站步行五分鐘。公交便捷,辦公環時尚優雅,億貝網路支持歡迎您!
  17. Honglou hotel hangzhou is a five - star foreign hotel, located in the westside lake road, adjoining railway station and the building subway line - 1, east to entrance of city of hangzhou, and south to binjiang road. with the distance about 10 mins by car to qianjiang new city, west to yongjin park, north to qianjiang bridge s entrance, at the crossing of stop of civil aviation and shuttle bus

    它地處西湖大道,毗鄰火車站和建設中的地鐵一號線,東向杭州入城口,南接濱江大道,與步入「錢江時代」的錢江新城僅十分鐘車程,西臨西湖涌金公園,北面錢江三橋入口,是民航公交巴士交匯中心。
  18. The article has collected data / information concerning total crude and products trade, tanker fleet productivity, tanker fleet deliveries and deletions, developing of new building market, etc. on the basis of this, the article has taken middle east ? apan trading line as an example, had a deep study of the method of technology and economy demonstration of large oil carrier and had an analysis and comparison of different ship type plan, by means of computer calculation

    本文在收集、分析世界石油海運量、世界油輪船隊的發展和現狀、航線狀況以及新造船市場的發展與現狀的基礎上,以中東?日本航線為例,深入研究油輪論證的方法,通過計算機輔助計算,選擇出了適合該航線的最船型。
  19. The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager

    本文作者應用廣義網路計劃技術和關鍵線路法對鍋爐安裝項目進行作業劃分和建立結構模型,並通過p3軟體在平涼電廠在建工程中的應用,實現了安裝工程計劃的動態管理,並通過計算機網路向電廠發布電建工程的施工進度、計劃、材料等方面的信息,為管理層提供了詳實的管理數據。
  20. Command - line building

    >命令行生成
分享友人