load block 中文意思是什麼

load block 解釋
負載劃區
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • block : n 1 片,塊,大塊;粗料,毛料;木料;石料;金屬塊;【建築】塊料,砌塊;【地質學;地理學】地塊。2 ...
  1. Besides establishing the calculation formulas of the support force of the swash plate, the contact load and the friction force between piston and cylinder block, the interaction force between piston and slipper, and the heel over moment of slipper, the relation between each machinery parameter and all these forces were discussed. 3

    分析了柱塞和滑靴的受力情況,並推導出斜盤支承反力,柱塞與缸孔間的正壓力和摩擦力、以及柱塞與滑靴間的作用力和滑靴傾側力矩的計算公式; 3
  2. The products can fall into two kinds of bi ? directional and four ? directions by fork directions, three forms of tri ? leg, nine ? block and plastic ? leg by base legs, five grades of w400 ? 、 w900 ? 、 w1200 ? 、 w1500 ? by load bearing capacities and three types of ordinary, buffer and protective types by cardboard laying arrangements, each of which has very high anti ? moist performance

    產品的分類按叉位方向分類分雙向、四向進叉兩種,接底腿形成式分類可分為三條腿型、九墩型、塑料腿型,按承載登記可分w400 ? 、 w900 ? 、 w1200 ? 、 w1500 ?等五中,鋪板形式有普通型、緩沖型、防護型等三種,各種產品都有很高的防潮性能。
  3. Abstract : in this study distributions of block compression force on the driving and driven pulleys were measured using a ting load - cell inserted between two blocks and a telementer system, under several constant speed ratios

    文摘:本研究採用超小型測力儀插入兩推塊和遙測裝置之間在幾種固定速比下測量主動和從動帶輪上推塊壓縮力分佈。
  4. Based on the theoretical analysis and design practice in successful development of allway desiel engine in china, the design concepts of key parts and components of engine, in particular the cylinder block and cylinder head, are analyzed for meeting the requirements for high performance and low emission as well as normal and reliable operation of diesel engine for medium and heavy commercial vehicle under high combustion pressure and high thermal load

    摘要結合我國自主開發的「奧威」發動機在設計工作中的理論分析與實踐,就低排放中重型商用車柴油機在開發工作中為滿足高性能、低排放的要求及在高燃燒爆發壓力和高熱負荷下正常可靠地工作,對發動機的關鍵零部件,尤其是缸蓋與缸體的設計概念進行了分析。
  5. Because of block in head of line ( hol ), input buffer strategy make the whole switch system performances declining drastically at heavy oflbred load, and some improvements of input buffer strategy are put forward to overcoming tlle head of line block. virtual output queues ( voq ) is chosen as input buffer strategy. dpa and ilqf ce1l scheduling algorithms for voq are silllulated

    由於輸入緩存的隊頭阻塞使得高負載條件下輸入緩存策略的交換系統各方面性能急劇下降,由此提出了克服輸入緩存隊頭阻塞的改進方法,最後本文決定選用虛擬輸出隊列( voq )的輸入緩存策略,並且研究了與虛擬輸出隊列相對應的ilqf (最長隊列優先)和dpa (對角線優先)信元調度演算法,為交換系統的asic設計提供依據。
  6. The system exhibits fast response for the load current disturbance and the system always operates at discontinuous conduction current mode so that no slope compensation is required and high efficiency will be achieved when driving 4 leds. the design and analysis of sub - block circuits are provide in the thesis where band gap reference, oscillator, current sensing and over current protection, led load current

    本文完成了各個單元電路的分析與設計,著重分析了帶隙基準源、振蕩器、采樣和過流保護、負載led電流控制和開負載保護五個子電路,對其餘子電路也作了簡要分析。
  7. The base is divided into finite block element. so, the stress and load that this system divided can be calculated. combining analyzing morrow point dam on colorado river with this method, the rationality of it is validated

    應用上述方法,結合morrowpoint雙曲拱壩,計算了該壩的分載與徑向位移,其成果合理,驗證了本文建立的壩體虛擬彈性地基梁與壩基塊體有限元組合的拱壩分載法的合理性,且滿足工程精度的要求,有一定的實用價值。
  8. Allow enough excess wire inside the enclosure to make up connections to the appropriate line, load and control terminal block points

    在外殼內要保留足夠的電纜長度,使其能夠滿足連接到負載和控制接頭的所需適當長度的要求。
  9. Because of the shape of the block, the red eye focuses the heat to the load

    因為爐頭磚的形狀,紅眼把熱量聚焦在加熱體上。
  10. The topic has analysis the body in the static, dynamic and the thermal - stress using the finite element method. in the analysis, adopting entity model building to build the fea model, predigesting the bonded block, using entity equivalence the bearing effect, adopting indirect method to couple the mechanism load and thermal load

    分析中,採用實體建模方法建立了機體的有限元模型;對結合部進行了簡化處理;用實體等效軸承的作用;採用間接法耦合了熱載荷和機械載荷的作用;應用錘擊法對機體和軸系進行了動態性能實驗。
  11. Which threads resume and which threads block depends on random factors like the load on the system, the number of threads waiting for the scheduler, and so on

    哪些線程阻止?這取決於一些隨機因素,例如系統上的負載、等待計劃程序的線程數等等。
  12. A study on the structural deformation of a special dam body with a comprehensive analysis method is presented, by taking section 33 of the qingtongxia dam as an example. the dam block is located at the abutment on the right bank, like an “ earth - retaining wall ”, whose cross section is “ high - heeled shoe ” sheped. because of the special structure and load condition, its deformation toward the downstream is large. deep research of its deformation law is conducted, and analysis of the special structure, the boundary condition of this dam block is performed, and the physical genesis of the large deformation of the dam block is revealed

    以青銅峽大壩33壩段為例,提出應用綜合分析法研究特殊壩體結構的變形規律.該壩段位於右岸壩頭,類似一「擋土墻」 ,斷面形狀如「高跟鞋」 .由於結構及受力條件特殊,產生了向下游的較大變形.本文應用綜合分析法(多種模型分析、結構計算等)對其變形規律進行了全面的分析研究,並重點對該壩段的特殊結構和邊界條件進行深入分析研究,弄清了該壩段向下游有較大變形的物理成因
  13. As a straightforward method, the full search algorithm ( fs ) is widely used because of its high performance. usually, fs is computationally expensive in a video encoder. as a result, in order to reduce the heavy computational load of fs, active research has focused on fast bmas for a long time and several sub - optimal search algorithms for block - based motion estimation have been developed. these include : three step search ( tss ), four step search ( fss ), two - d logarithmic search, orthogonal search, cross search, etc

    目前塊匹配運動估計演算法有很多,如全搜索法、三步法、共軛方向搜索法、二維對數搜索法、交叉搜索法、鉆石搜索法以及四步搜索法等,它們各有優缺點,全搜索法精度高,但計算量大,三步搜索法和交叉搜索法搜索速度較快,但搜索誤差較大,容易陷入局部最小值。
  14. Experimental study and theory analysis on crack - resisting load of concrete small hollow block wall

    混凝土小型空心砌塊墻體初裂荷載試驗研究及理論分析
  15. Block wall is supposed as a uniform material and having same properties in every direction, and its relation of stress - strain adopts the model of zhejiang university structure lab. aided by ansys, eight types of walls under level load have been nonlinear analyzed and achieved the cracking, extreme load, cracks location and form respectively. the simulation results show great agreement with experiment results

    將砌塊砌體材料做勻質、各向同性處理,採用浙江大學結構工程研究所推薦的砌塊砌體非線性本構關系,利用ansys中的混凝土單元solid65模擬砌塊砌體和鋼筋混凝材料,共對八種類型墻體進行了非線性有限元模擬分析,分別得出了各種墻體的初裂、破壞荷載、裂縫開展情況、應力、位移等結果,初裂、破壞荷載和實測值相差不大,模擬的初始裂縫位置、形式以及裂縫開展情況與實驗結果比較吻合。
  16. Standard test methods for breaking load and flexural properties of block - type thermal insulation

    塊形絕熱材料的破裂負荷能力和彎曲性的標準試驗方法
  17. The problem of noise is a chief block to restrict the popularity and developement of the plc because of the irregularity of power line network, the randomness of transmission distrance and load facility diversities

    由於低壓范圍內電力線網路的非規則性、傳輸距離的隨意性、以及電力線上負載變化的多樣性,使得干擾問題成為制約低壓電力線載波通信發展和普及的主要障礙。
  18. Model hsh lever block is nover lever block. and adopted advanced construction, easy to operate and it can quickly spot bottom hook when there is no load, so that it can shortten the time of operation

    Hsh型手扳葫蘆是一種較新穎的手扳葫蘆,採用先進結構,操作方便,空載時迅速調整下吊鉤的位置,縮短操作時間。
  19. Some conclusions are revealed from these results : the bearing press capacity of concave concrete block wall is a little smaller compare to normal block wall, but the shear bearing capacity, the crack load and ultimate load are distinct lager than the later, and the amount of cracks are more than normal block masonry

    分析結果表明,凹形砌塊墻體受壓承載力比普通砌塊墻體的受壓承載力略低,而受剪承載力明顯高於普通砌塊墻體。凹形砌塊砌體與普通砌體相比,凹形砌塊墻體的開裂荷載、極限荷載明顯要高,砌體內的裂縫數量要多。
  20. Plain bearing block housings are made up of cap, base, aluminum bronze bushing and installing bolts, which mainly bear radial load

    滑動軸承座由上蓋、底座、剖分軸瓦(鋁青銅) ,安裝螺栓組成,主要承受徑向載荷。
分享友人