load water 中文意思是什麼

load water 解釋
壓裂工作水;積水
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. The dump vehicle is suit to load and disoharge the piled material, such as the loose soil, finc sand, fertilizsr, waste. so it can be wildly used in many fields, such as construction site, iuad maintenance, municipsl works, railroad consiruction, dock transport, brickfield, and carry in warehouse, it can be used in many cngineering construction, stch as water conservancy project, onvirenment engineering and gardens. it is the ideal shourt haul means within 1 km

    該產品適用於裝卸鬆土、細砂、肥料、垃圾、水泥等成堆堆放的物料,因此是廣泛用於建築施工、公路養護、市政工程、鐵路建設、碼頭運輸、窖廠作業、倉庫搬運以及水利、環衛、園林等工程建設,是運輸半徑為1km以內理想的短途運輸工具。
  2. This system contains : parts load, pre - degrease, degrease, spray cleaning, spray surface adjustment, spraying phosphating, rinse with d - ionized water, electro - deposition, ultra - filter for post rinse, oven curing, cooling and unload

    由上件,預脫脂,脫脂,噴洗,噴淋表面調解,噴淋磷化,去離子水噴洗,電泳塗裝,超濾液噴洗,漆膜固化,自然冷卻,下件工序組成。
  3. It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly

    即以水阻作為負載,模擬機車運行,對機車的主發電動機的電流、電壓和柴油機的轉速等參數進行檢測,並對檢測結果進行處理,計算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過水阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。
  4. Due to slope cable bears barely alternative load longtime in nature environment, it is easy to corrosion and wreck. seriously, the bridge is possibility to collapse in strictness air empoison, water pollution, seashore and ocean surroundings. therefore, to study cable ’ s corrosion widely and to inhibit corrosion process are very important for increase endurance and safety of bridge construction

    由於斜拉索長期承受交變載荷並暴露于自然環境中,特別是大氣污染嚴重地區、水污染嚴重地區、海濱及海洋環境,極易發生腐蝕破壞,嚴重者還會因坍塌而造成生命及財產的巨大損失,因此,全面研究橋梁拉索的腐蝕,阻斷腐蝕的成因,對提高橋梁結構的耐久性與安全性具有重要意義。
  5. About the load, consider the vertical load, when under the action of water, consider the horizontal still water press, the press which erects to the surface of slide, and consider the effect of hydrodynamic load and earthquake. ( 3 ) the software about the frame design, apply the stiffening bar method and elastic foundation method to account the endogen

    對于荷載(或工況) ,考慮了外加垂直荷載;在有水作用的情況下,考慮了水平靜水壓力,垂直滑面的靜水壓力(也叫浮托力) ;考慮動水壓力的影響;同時也考慮了地震的影響。
  6. From analyzing the change of effective stress in the process of one - direction to two - direction load, it is founded that the evanescing process of pore water pressure proposed in the paper shows a better agreement to fact

    從對單向荷載作用時地基的有效應力變化過程分析入手,引伸到對雙向荷載作用時地基的有效應力變化過程分析,提出與實際情況更為符合的孔隙水壓力消散過程。
  7. Assemblage ) represented the coastal shallow - water environment ; factor 2 ( protelphidium tuberculatum assemblage ) represented the alongshore cold - water current area or cold shallow sea environment ; factor 3 ( elphidium magellanicum assemblage ) represented the sh allow sea ( < 20 - 30m depth ) deposit ; factor 4 ( ammonia ketienziensis assemblage ) represented the shallow - sea water more than 50m depth ; and factor 5 ( buccella frigida assemblage ) represented the colder - water sea environment ; and the distribution of factor load accorded with the character of benthic foraminifer community

    Q型因子分析揭示ey02 - 2孔5種有孔蟲組合,分別對應濱岸鹽沼環境、黃海沿岸流冷水分佈區、高潮坪淺海沉積環境、水深大於50m的現代淺海環境及較冷的沉積環境。因子載荷的分佈與有孔蟲群落特徵吻合較好。南黃海有孔蟲含量? ?水深轉換函數關系式有一定的局限性,並不能在南黃海陸架地區推廣使用。
  8. The products is of high water hydrophobe device usedin suitable and has the characteristics of aging resistance, resistance, tracking resistance, and corrosive resistance. it can withstand high bent load, strong impact force fn12 - 12 series indoor use high voltage load switch fn12 - 12 and fn12 - 12r is of three phases indoor use ac high voltage load switch for breaking and making the circuit of 50hz, 12kv system under rated loading

    Fn12 - 12和fn12 - 12r組合電器是額定電壓12kv額定頻率50hz的三相高壓開關設備用於分合負荷電流閉環電流空載變壓器和電纜充電電流關合短路電流配裝接地開關的負荷開關,可以承受短路電流
  9. Fresh water tropical load line

    淡水熱帶載線
  10. Fresh water load line

    淡水載重線
  11. The characteristics of high pressure gyratory sprayed pumping discusses is presented, which is applicable in wide range of scope and ground layers, convenient for construction, long durability, wide source of materials. mechanism for subgrade strengthening : complex foundation of cement solid and earth between piles was formed by pulsant load of flowing pressure and spraying flow, water wallop, cavitation phenomenon, water wedge effect, extrusion force and air flow agitation etc so as to enhance foundation bearing force and reduce settlement and deformation

    高壓旋噴注漿技術具有適用范圍、適用地層較廣,施工方便,耐久性好,材料廣闊等特點;其加固地基機理主要是通過流動壓、噴射流的脈動負荷、水塊的沖擊力、空穴現象、水楔效應、擠壓力、氣流攪動等效應形成水泥固結體與樁間土的復合地基,從而提高地基承載力,減少沉降變形。
  12. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、電氣強度、絕緣電阻、接地連續性、泄漏電流、微波泄漏、功率、溫升、濕熱試驗、灼熱絲、水平燃燒、垂直燃燒、漏電起痕、球壓試驗、防雨淋、防濺水、粉塵、鹽霧、耐久性(壽命)試驗、電機負載試驗、電源線彎折、電源線提拉、拉扭力測試、燈頭互換性、安全結構檢查等。
  13. ( 8 ) as for the runnel which is located at a karst zone with a high water level, external water load is the main one, and rock pressure is secondary

    門)在巖溶富水區隧道地下水水頭較大時,外水荷載是襯砌結構的主要荷載,圍巖壓力相對來說是次要荷載。
  14. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據隧道模型試驗理論,通過室內模型試驗得出了有注漿堵水圈的隧道襯砌結構外水荷載的作用規律。
  15. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  16. Using the opened thermosiphon of 38x3 as experimental element and water as working fluid, the characteristics of dynamic low load boiling, stable severe boiling heat transfer coefficient and critical heat flux are gotten for the opened thermosiphon at the pressure of 0. 02 - 0. 1mpa and 0. 1 - 0. 8mpa respectively, which makes up the drawback that the opened thermisiphon has not yet accurate boiling heat transfer relationship formulas. by means of experimental results, an opened thermisiphon waste heat recovery boiler is designed for the high temperature gases that the positi e electrode copper refining furnace exhaust, which overcomes effectively the drawback of short life, little capacity and unable to inspect that the closed steel - water thermosion has

    本文以工程上常用的38 3的開口封底為實驗元件,以水為工質,對開啟式熱管內的動態低負荷沸騰、穩態旺盛沸騰及臨界沸騰特性進行系統的可視化實驗研究,實驗壓力為0 . 02 0 . 8mpa ,實驗得出了38 3的開口封底管在工作壓力為0 . 02 0 . 8mpa和0 . 1 0 . 8mpa下的管內沸騰傳熱系數及臨界熱負荷計算關聯式,彌補了開口封底管? ?這一新型傳熱元件尚無準確的沸騰換熱關聯式的缺陷。
  17. A river quality management model is proposed for the optimal waste load allocation in a tidal river basin, taking into account the impacts of stochastic pollutant discharge and dynamic hydrological conditions on water quality during a tidal cycle

    摘要考慮污染源強隨機變化和感潮河流潮周期內動態水文條件對水質的影響,建立了優化污染負荷分配的流域水質管理模型。
  18. Experimental research on uplift force acted on a piece of floor of arch invert water cushion pool and estimation to limit thrust load at skewbacks

    反拱水墊塘底板塊上舉力變化規律的試驗研究
  19. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪抽水蓄能電站基於實時信息系統sis平臺的負荷、水庫調度、電量系統模型的設計、建立、開發和調試工作進行了說明和介紹。
  20. Timber load water - line

    木材載重水線
分享友人