load-on-top 中文意思是什麼

load-on-top 解釋
不清油腳
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • on : adv 1 〈接觸、覆蓋〉上去;開(opp off)。 turn on the light [radio water gas] 開電燈[收音機、自來...
  • top : n (opp bottom foot)1 頂,頂部,頂端。2 頭,頭頂;尖端;樹梢,樹頂;(事物的)上層部分。3 最高位...
  1. Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems

    文摘:討論了在多項高層建築結構分析中垂直荷載加載模式的選擇,框架邊梁和次梁端部的彎矩計算,連梁問題和平面框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平面外彎矩等問題,可供同類結構內力分析時參考
  2. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用橋式應變片傳感器,應用平穩安裝技術確保長期穩定運行稱重傳感器提供多種安裝方式,可以安裝于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上面等,與控制儀配合使用。
  3. At first, based on the results of in - situ load tests, the load - settle curves are acquired, and the effects of different reinforcement parameters are presented. these parameters include the linear density ratio ( ldr ) ; the location of the top layer of the geobelt measured from the bottom of the load plate ( u ) ; the different materials of geobelt ; the number of reinforcement layers ( n ) and the distance between the two layers of geobelt ( a h ). these results show that the bearing capacities of the reinforced composite foundation can be improved and the settlement can be reduced

    首先,通過現場載荷試驗,獲取了加筋墊層復合地基荷載-沉降曲線,從筋帶鋪設的密度、筋帶的首層間距、不同筋帶材料、加筋層數以及雙層筋帶的層間距等幾個方面分析了以上加筋參數對加筋復合地基承載力的影響,指出筋帶的存在提高了加筋復合地基的承載力,減小了沉降。
  4. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔頂的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋面和樓面徑向懸挑支承梁的錨固梁,確保了它和塔筒的整體性和荷載的傳遞。
  5. Based on biot ' s theory, the basic equations and solution conditions were established for the consolidation problem of the composite foundation with single column considering soil - column interactions when load was applied on the top of column only or applied on the top of both column and soil, and the solution for deformations of soil and column were obtained in the forms of laplace and hankel transformation

    基於biot理論,分別對在樁頂受外荷載作用和樁土共同受外荷載作用的情況下考慮樁土相互作用的單樁復合地基固結問題建立了基本方程和求解條件,並在laplace變換域和hankel變換域內得到了土體和樁體的變形解答。
  6. Meanwhile, arched roof is generally set on beam at the top of pillar. since column adaptor may has displacement ( specially horizontal displacement ), load - carrying capability of the structure will step down, and bending rigidity of the column also has emphatic influence on it

    同時,拱型屋蓋一般是通過邊梁支承在柱子上,由於柱頂產生位移(尤其是水平位移) ,支承在柱子上的拱型屋蓋的承載力較固定支座的拱型屋蓋有所降低。
  7. In order to predict high - strength bolts pretension and contact - friction in contact zone, status nonlinear in contact zone is adopted in fem model. the computation and analysis on the behavior of beam - to - column rigidity joints subjected to constant axial pressure on the top of column and cyclical load at tip of beam is carried out

    實體模型的建立,考慮了接觸區的狀態非線性,以模擬高強螺栓的預拉力、螺栓連接區的摩擦接觸,對承受軸力的樑柱剛性連接方式在循環荷載作用下的滯回性能進行了計算分析。
  8. Secondly, the paper analyzed the behavior of isotropic and orthogonal anisotropic materials " cws on the basis of above theory and software. regularities of cws " deformation inner force and shared load and earth pressure in excavating stage and driving stage were gained. regularities influenced by material features top beam excavating depth sidewall depth properties of soil layers rear backing and location of load were also obtained, especially rules of display degree exerted by circular and vertical loads were also obtained

    通過分析,得到了形成階段及頂進階段圓形工作井的變位、結構內力、分載及土壓的分佈規律及材料性質、頂冠梁及圍檁、開挖深度、井壁插深、土層性質、后靠背、頂載作用位置等因素對結構受力性狀的影響規律,特別是得到了工作井在受力時結構環向與豎向承載作用發揮程度的規律。
  9. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大橋為一凈跨達288米的上承式鋼管混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱肋採用8根920mm的鋼管,通過腹桿及平聯形成鋼管混凝土空間桁架,拱上立柱亦採用鋼管混凝土排架,造型新穎美觀。
  10. Based on structure calculation of the pool wall, the top - cover of thin brick shell, pull beam and base plate of underground round - arch single - well - head thin brick shell, the paper proves that such a structure can bear load well and safely

    摘要通過對地下圓拱式單井口磚薄殼的池壁、磚薄殼頂蓋及拉梁和底板進行受力分析和結構計算,闡明了該種結構是一種受力合理、安全可靠的結構。
  11. Furthermore, it was shown that load - displacement of pile groups and load distribution on pile top were affected by properties of soil and stiffness ratio of piles to soil, and by length, diameter, spacing, and number of piles

    在此基礎上,分析了剛性承臺條件下超大群樁基礎的荷載位移曲線變化規律以及樁頂荷載分佈規律受樁土剛度比、樁長、樁徑、樁距、樁數、土性等因素的影響規律。
  12. The measured results of settlement depth for foundations with different breadth, soil deformation area around pile and foundation, interaction coefficient of double pile and load distribution on pile top beneath cap illustrate that the effects of interaction of soil - soil, pile - soil and pile - pile are obviously lower than elastic theory values

    不同基寬壓縮層深度、基礎和樁側土變形范圍、雙樁相互影響系數以及樁頂荷載分佈的測試結果說明,土土、樁土、樁樁相互作用效應較連續介質彈性理論值明顯弱化。
  13. Based on the further study of dynamic characteristic of the tractor - implement combination, according to the integrated control model, which including the flowing three parameters : the engine load rate, drive wheel slip and work resistance, and the three control strategies, which are : highest production efficiency control strategy, oil consume economic control strategy and give attention to the above control strategy, we can adopt different control strategies according to different purpose of the task. applying the theory of the hybrid dynamic system to this case, the three control strategies can be abstracted to three discrete matters, and then the exchange model of the discrete matters of the top layer ( which called manage layer ) of the tractor - implement combination and the function decision model, which based on the nerve network, can be established. through this way, the best ad aptive controlling of the tractor came true

    本文研究了拖拉機機組的綜合控制問題及其最佳匹配方法,在深入研究機組動態特性的基礎上,根據發動機負荷率、驅動輪滑轉率和作業阻力三參數的綜合綜合控制模型以及三種綜合控制策略(最高生產效率的控制策略、燃油經濟性的控制策略和兼顧最高生產效率及燃油經濟性的控制策略) ,針對不同的作業目的,採用不同的控制策略,應用混雜動態系統理論,把三種控制策略抽象為三種離散事件,建立了拖拉機機組上層(管理層)離散事件切換模型,並建立了基於神經網路的功能決策層模型,從而實現了拖拉機機組的整機最優控制。
  14. It could be seen that the curve of settlement and load of pile, the distribution of axial force on the pile top, the curve of load on cap and axial force on the top pile obtained with numerical analysis were agreed with those measured in centrifugal model test

    分析結果表明,數值分析所得承臺沉降與承臺荷載的關系曲線、樁頂軸力分佈、樁頂軸力隨承臺荷載變化的關系曲線,與其離心模型試驗實測成果較一致。
  15. It is on condition of the retaining and protecting piles imitated by nylon sticks, the top ring beam imitated by steel board, the foundation wadded by sandy soil, and the sectional size and extra load changed

    本文試驗是以尼龍棒模擬支護樁,以扁鋼模擬樁項圈樑,採用砂土填築地基,通過變換圈樑的截面尺寸及堆載進行了八組試驗。
  16. It is assumed that the effect on top of every piles are same when vertically axial load is acting on pile foundation in current design methods

    在樁基礎現行設計方法中,當樁基礎受軸心豎向力作用時,假定各樁的樁頂作用效應相同。
  17. The chongqing electric power load system was set up in 1992, and by 1996, a control center composed by novell network, six bi - directional relay transmit stations, 2 unilateral transmit stations and 1260 diversified terminals have been established, which covered areas managed by the former electric power bureau of chongqing. the system scope of the established electric power system was on the top place among the large and middle cities over the country

    重慶電力負荷控制系統始建於1992年,到1996年時,已建成了一個由novell網路構成的控制中心、 6個雙向中繼轉發站、 2個單向轉發站、各類型終端1260多臺,覆蓋原重慶電業局所轄供電區域。系統規模在當時全國各大中城市建立的電力負荷系統中居首位。
  18. Single stiffness is presented through q - s curve, and the load of the top of pile is computed by circulating many times, so it can avoid man - made rectification. at the end of the paper, the application of the method is introduced on a project

    通過單樁的荷載沉降曲線確定群樁中單樁的剛度,並可用逐次逼近的方法求解樁頂反力和基礎沉降,避免了對剛度的非理性調整。
  19. Similar materials experiment of the influence laws of load coefficient on the surrounding rock of large - section starting cut in top - coal caving face

    載荷系數影響綜放大斷面開切眼圍巖變形相似模擬研究
  20. Based on above three methods of transferring self - balanced test data into top load data have been provided and relative computer program has been edited

    結合本文的研究成果,在實際工程中進行了自平衡試樁法與靜載試驗的對比試驗。
分享友人