local water level 中文意思是什麼

local water level 解釋
當地水位
  • local : adj 1 地方的,當地的,本地的。2 局部的。3 鄉土的,狹隘的,片面的。4 【郵政】本市的,本地的;【鐵...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  1. Flood control planning for other rivers, river courses and lakes or regional flood control planning shall, separately in accordance with comprehensive river bas in planning and comprehensive regional planning, be formulated by water conservancy administrative department s under local people ' s governments at or above the county level in conjunction with other relevant departments or regions, submitted to the people ' s governments at the same level for approval and then submitted to the water conservancy administrative departments under the people ' s governments at the next higher level for the record

    跨省、自治區、直轄市的江河、河段、湖泊的防洪規劃由有關流域管理機構會同江河、河段、湖泊所在地的省、自治區、直轄市人民政府水行政主管部門、有關主管部門擬定,分別經有關省、自治區、直轄市人民政府審查提出意見后,報國務院水行政主管部門批準。
  2. Soil embankment is widely used in water conservancy and flood prevention projects because of its being able to drawing on local resources and other advantages. how to analyze and calculate the seepage and stabilities of levees under high level flood reasonably, and supply reliable technological support for dangers removing and strengthening are of great engineering significances

    土質堤防因具有能就地取材等優點而為水利及防洪工程廣泛採用,合理分析與計算高洪水位作用下堤防的滲流及穩定性、為除險加固提供技術支撐具有重要的工程實際意義。
  3. Planned realigning and leading lines for other rivers or river courses shall be worked out by water conservancy administrative departments under local people ' s governments at or above the county level and submitted to the people ' s governments at the same level for approval

    跨省、自治區、直轄市的江河、河段和省、自治區、直轄市之間的省界河道的規劃治導線由有關流域管理機構組織江河、河段所在地的省、自治區、直轄市人民政府水行政主管部門擬定,經有關省、自治區、直轄市人民政府審查提出意見后,報國務院水行政主管部門批準。
  4. Comparison of water level between measured and computation shows that the local head loss coefficient cannot give head loss by spur dike completely, and the effective area of passage is difficult to be ascertain. for this reason the two methods for water surface profile computation cannot predict the raise of water level upstream the spur dike accurately

    計算結果表明,局部水頭損失系數並不能完全反映出由於丁壩阻擋所帶來的水頭損失,而丁壩附近的有效過水面積難以準確地確定,這些導致前兩種方法均不能很好地計算出丁壩上游水位的壅高值。
  5. Plan ( china ) is designed to develop a model that integrates the safe water supplies, sanitary living conditions and poverty reduction at the community level in rural areas of west china by cooperating with provincial green projcet and local women ' s federation, focusing on institutional capacity building and partnership between rural communities, government, and ngos for sustainable environment and resource management and livelihood improvement

    國際計劃(中國)與環保局(綠色文明辦公室)及陜西省當地婦聯合作,致力於在中國西部農村社區建立一個集安全飲用水供應、村民居住生活條件改善和扶貧為一體的項目模式,著眼于對相關機構進行能力建設並促進與農村社區與政府及非政府組織之間的合作以實現對環境與資源的可持續性管理以及生計水平的改善。
  6. Article 34 in the case of earth - fetching, sand - digging or quarrying in areas in danger of land - collapsing or land - sliding or where mud - rock flow is liable to occur, as designated by the local people ' s government at or above the county level, the department of water administration under the people ' s government at or above the county level shall order the cessation of the above law - breaking acts and the adoption of remedial measures, and shall also impose a fine

    第三十四條在縣級以上地方人民政府劃定的崩塌滑坡危險區、泥石流易發區范圍內取土、挖砂或者採石的,由縣級以上地方人民政府水行政主管部門責令停止上述違法行為、採取補救措施,處以罰款。
  7. Article 7 the department of water administration under the state council and those under the local people ' s governments at or above the county level shall, on the basis of investigation and assessment of water and soil resources, draw up water and soil conservation plans in conjunction with other departments concerned

    第七條國務院和縣級以上地方人民政府的水行政主管部門,應當在調查評價水土資源的基礎上,會同有關部門編制水土保持規劃。
  8. The water level in the 632 - square - kilometer reservoir3 is scheduled to reach 135 meters by june 2003, creating the potential for landslides4 and placing local residents at risk

    這座面積632平方公里的水壩,水位預計在2003年6月將上升到135米,那時將有土石崩塌的可能,當地居民將面臨危險。
  9. The rigid limit equilibrium computation and finite element computation have been performed which concluded that the integral stability coefficient of no. 2 landslide shall be the minimum value when water level is 2145m a. s. l., then the coefficient increases slightly as the reservoir water level rises up, there exists, however, a fact that the stability coefficient of local section may tend to decrease continuously along with the rise of reservoir water level

    進行了剛體極限平衡計算和有限元計算,證明號滑坡的整體穩定系數在2145m水位時最低,在此水位以上,將隨庫水位升高而略增;但局部斷面穩定系數有隨庫水位升高而不斷下降的情況。
  10. Other river courses and lakes shall, according to the designation of the water conservancy administrative department under the state council or its authorized agencies, be under the control of water conservancy administrative departments under local people ' s governments at or above the county level

    其他河道、湖泊,由縣級以上地方人民政府水行政主管部門按照國務院水行政主管部門或者國務院水行政主管部門授權的機構的劃定依法實施管理。
  11. The aim of the research is to show a relationship between water quality in lake tai and local agricultural production according to the current soil phosphorus status, and to recommend a maximum accumulative application level of phosphorus fertilizers based on phosphorus adsorption experiments

    根據現在土壤中磷的狀況所進行的研究目的是為了表明太湖水質與當地農業生產的關系,並且在土壤對磷吸收實驗中找到磷肥的用於土壤的最大使用水平。
分享友人