lock out operation 中文意思是什麼

lock out operation 解釋
分離運轉,分離操作
  • lock : n 1 鎖,閂,栓。2 (運河等的)船閘。3 制輪楔。4 【機械工程】氣閘,氣塞,鎖氣室。5 【軍事】槍機。6...
  • out : adv 1 〈位置及運動的方向〉向外,向外部;在外,在外部;出去,出外,離開;離岸,向海面;(船等)開...
  • operation : n 1 動作,行動,活動;業務,工作;作用。2 效果,效力;有效范圍,有效期間。4 【數學】運算;【醫學...
  1. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理位置和營運現狀,說明了船閘在航道建設和水資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運量發展的預測,並確定東溝船閘的設計代表船型及營運組織;第三章東溝船閘改造工程設計本章通過船閘改造工程主要技術參數:船閘規模、尺度、設計水位和高程等的確定,設計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的設計,並選定了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船閘改造工程二個設計方案進行全面綜合比較后,確定了推薦方案。
  2. Regardless of which of the conflicting operation began first, the second operation waits for the lock set by the first operation to time out the time - out period is controlled by a session timeout setting

    無論哪個沖突操作先行開始,第二個操作總會等待第一個操作設置的鎖超時(超時期限由會話超時設置控制) 。
  3. If the lock times out, the second operation fails

    如果鎖超時,則第二個操作失敗。
  4. If the lock is released during the time - out period, the second operation continues

    如果鎖在超時期限內釋放,則第二個操作繼續執行。
分享友人