ma on shan line 中文意思是什麼

ma on shan line 解釋
九廣馬鐵
  • ma : 1. Minnesota. 2. 【化學】元素 masurium 的符號。n. 〈兒口〉媽〈mamma 之略〉。 ma and pa 〈美國〉夫妻店,家庭經營的小店鋪。
  • on : adv 1 〈接觸、覆蓋〉上去;開(opp off)。 turn on the light [radio water gas] 開電燈[收音機、自來...
  • shan : n. 1. (pl. Shan(s)) (居住在東南亞的)撣人。2. 撣語。
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. The force carried out a simulated " sarin " attack at the tsuen wan west rail station, and assisted both the kcrc and the railway district in running a series of mini exercises on the ma on shan extension prior to the line s opening to the public

    其中包括在荃灣西鐵站進行模擬沙林毒氣襲擊,及協助九廣鐵路公司和鐵路警區在馬鞍山支線通車前進行一連串小型演習。
  2. New projects to be examined in the rds - 2 include the west rail ( phase ii ), the east kowloon line, a fourth cross - harbour rail link, the north hong kong island line, a second connection from the ma on shan railway to the urban areas and the west hong kong island line

    現正審議的計劃,包括西鐵(第二期) 、東九龍線、第四條過海鐵路線、北港島線、連接馬鞍山鐵路與市區的第二條鐵路線,以及西港島線。
  3. West rail, tsim sha tsui line, ma on shan rail

    (車站)將軍澳線、西鐵、尖沙咀支線、馬鐵啟用
  4. Through close cooperation with the kcrc, railway district has been closely monitoring the new ma on shan line to ensure no adverse impact on the crime situation

    透過和九廣鐵路公司的緊密合作,鐵路警區密切監察新啟用鐵路,繼續維持治安。
  5. The further expansion of rail networks, as seen in the opening of the kcr east rail ma on shan line in december, added to the region s railway policing commitments

    隨著鐵路網路不斷擴展,包括在十二月啟用的九廣東鐵馬鞍山支線,使總區在鐵路方面的警政工作大幅增加。
  6. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line

    兩間鐵路公司正在落實六項鐵路工程,即西鐵地鐵將軍澳支線馬鞍山鐵路九尖沙咀支線竹篙灣鐵路線和上水至落馬洲支。
  7. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line. these projects are due to be completed in stages between 2002 and 2007 at a total cost of about $ 100 billion

    兩間鐵路公司正在落實六項鐵路工程,即西鐵、地鐵將軍澳支線、馬鞍山鐵路、九龍尖沙咀支線、竹篙灣鐵路線和上水至落馬洲支? 。各項工程預計在二零零二至二零零七年間分階段完成,總投資約一千億元。
  8. The west rail phase i, mtr tseung kwan o extension, ma on shan railway, tsim sha tsui extension and sheung shui to lok ma chau spur line have been designated as priority rail projects

    西鐵(第一期) 、地鐵將軍澳支線、馬鞍山鐵路、尖沙咀支線以及上水至落馬州延線均被列為優先發展的鐵路項目。
  9. The west rail ( phase i ), mtr tseung kwan o extension, ma on shan railway, tsim sha tsui extension and sheung shui to lok ma chau spur line have been designated as priority rail projects

    西鐵(第一期) 、地鐵將軍澳支線、馬鞍山鐵路、尖沙咀支線以及上水至落馬州延線均被列為優先發展的鐵路項目。
分享友人