machine time scheduling 中文意思是什麼

machine time scheduling 解釋
機票間日程計劃
  • machine : n 1 機(器),機械;機關,機構。2 印刷機器;縫紉機;打字機;汽車;自行車;三輪車;飛機;〈美俚〉...
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • scheduling : 編排;調度
  1. The requirement analysis and system design are carried out according to the situation of nanjing sky electron co. ltd. at the same time, the key technology to solve the capability balance of the machine tool and scheduling system of the workshop production are studied, and a management model of the workshop production solved the corresponsive problem to finish the production task in time according to the current need in the enterprises

    然後結合一個典型的製造業企業? ?南京四開電子企業有限公司進行了系統的需求分析和設計。接著研究了企業車間級生產計劃管理模型,提出了一種以按時交付為目標的機床生產能力平衡與車間級生產計劃的控制方法,並對其中需要解決的關鍵技術進行了研究和討論。
  2. However, to minimize the maximum completion time for the wafer probing scheduling problem ( wpsp ) is very important for equally utilizing the capacity of parallel - machine, while satisfying the requirements of product types, product family, sequence dependent setup time, product - type dependent processing time, due dates of jobs, and capacities of machines

    然而求解晶圓針測排程問題最大完工時間的最小化以均勻的利用平行機臺的產能是非常重要的,該問題尚考慮以下的問題特性:產品別與產品族、順序相依設置時間、決定於產品別的工作處理時間、工作交期與機臺產能限制等。
  3. This course deals with the following topics : models of manufacturing systems, including transfer lines and flexible manufacturing systems ; calculation of performance measures, including throughput, in - process inventory, and meeting production commitments ; real - time control of scheduling ; effects of machine failure, set - ups, and other disruptions on system performance

    本課程主要涉及下列主題:製造系統模型,包括生產線和柔性製造系統;工作指標的計算,包括生產能力、在制品庫存以及完成計劃的能力;實時時序控制;機器失效、安裝和其他中斷對系統性能的影響。
  4. Semi on - line scheduling problem for maximizing the minimum machine completion time on m identical machines

    臺同型機極大化最小機器負載的半在線問題
  5. According to the number of processors, scheduling problem can be grouped as single - machine scheduling problem and multi - machine scheduling problem. according to whether the job ' s processing time, released time and the surroundings of the processors are deterministic or stochastic, scheduling problem can be grouped as deterministic scheduling problem and stochastic scheduling problem. according to whether the parameters of the jobs are given before - hand, scheduling problem can be grouped as static scheduling problem and dynamic scheduling problem

    按處理機個數將排序問題分為:單機排序問題和多處理機排序問題;根據任務加工時間和到達時間以及處理機的工作環境等數據是確定的或服從某種隨機分佈可分為:確定性排序問題和隨機排序問題;根據所有任務的參數是否是預先給定的可分為:靜態排序問題和動態排序問題。
  6. Ga has been successfully used in a lot of fields such as the travelling salesman problem, scheduling, function optimization, machine learning etc. at the same time dsp also has been successfully used in many fields because of its flexibility, programmable

    同時數字信號處理器所具有的系統構成靈活、可編程、適用面廣的特點,使其在眾多領域成為不可或缺的數字處理的計算引擎。
  7. By choosing flood control system of downstream basin of the yellow river as the background, six relatively independent subsystem is established, which includes basic information management, real - time flood forecast, multi - reservoir flood control scheduling, consultation and analysis, scheduling scheme management, frequency analysis, and assist with friendly man - machine conversation to constitutes the yellow river downstream flood control scheduling decision support system, which can satisfy the practicability requirements of decision - making

    論文以黃河下游防洪系統為背景,建立包括基本信息管理、短期洪水預報、水庫(群)防洪調度、會商與靈敏度分析、方案管理、水雨情頻率分析等6個相對獨立的子系統,並輔以友好的人機交互界面集成為黃河下游防洪調度決策支持系統,滿足了群決策會商的實用性要求。
  8. Single machine scheduling with precedence constraints and processing time dependent on starting time

    具有優先約束和加工時間依賴開工時間的單機排序問題
  9. The less than ideal news is that ssh - add must be invoked each time we sign on to the offsite machine and ssh - agent isn t immediately compatible with the cron scheduling process which we ll need to automate our backups

    不太理想的消息是,我們每次登錄到離線的機器上時,都必須調用ssh - add ,而且, ssh - agent與我們將要用來自動化備份工作的cron調度進程並不直接兼容。
  10. Single - machine scheduling with maintenance to minimize the total weighted completion time

    目標函數為加權完成時間和的單機維護調度問題研究
  11. Abstract : a scheduling problem on the single machine with fuzzy processing time is studied

    文摘:研究單機模糊加工時間下確定最遲開工時間的調度問題。
  12. For this reason, this paper considers grid workflow as its research subject, and introduces survivability conception into schedule algorithms based on performance and qos. firstly, this paper proposes a schedule algorithm which considers both performance and survivability by modifying min - min, max - min and sufferage. it pursues the shortest finish time as well as survivability to avoid scheduling a task to an unreliable machine and to reduce the influence of machine malfunction on task

    為此,本文把網格工作流作為研究對象,從基於性能和基於qos兩個方面將生存性引入網格調度演算法:第一,通過改造min - min 、 max - min 、 sufferage三種演算法,給出了三個同時考慮性能和生存性的調度演算法,避免將任務分配到可靠性比較低的節點上執行,從而有效地降低了節點失效對任務的影響。
  13. The solving method for the model based on the network float programming is discussed. at the same time a software package to draw daily generating scheduling is developed, based on windows operating system. the soft package provided with a friend man - machine interface and is excellent at both calculating capacity and processing speed

    本文著重探討了考慮旋轉備用輔助服務后的電能競價,提出一種綜合考慮電能和旋轉備用服務競價的日交易計劃模型,並以網路流法為基礎對該模型進行求解;同時開發了基於windows環境的日交易計劃軟體包,該軟體包界面友好,有較強的計算功能和較快的運行速度。
  14. Inverse scheduling problem on a single machine stochastic scheduling to minimize the total completion time

    單臺機器總完工時間隨機排序問題的反問題
  15. It is shown that these four types of single machine scheduling problems can be modeled as an assignment problem by mathematical programming method, thus these four types of problems can be solved in polynomial time

    用數學規劃的方法證明了四類多準則下的單機排序問題可以轉化為指派問題,從而這四類問題都多項式時間可解。
分享友人