main bottom 中文意思是什麼

main bottom 解釋
基底;基座
  • main : adj 1 主要的,主,全,總。2 充分的,盡量的;全力的,有力的。n 1 體力,氣力;力〈僅用於 with might...
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  1. The manual colored drawing was the main decorating pattern of ancient lacquerware, which taking the black as bottom color, drawing with colored paints such as vermeil, red, brown, claybank, emerald green, white and so on in the methods of graphic drawing and line drawing

    古代漆器的紋樣圖案主要是手工彩繪,以黑色為底,運用平繪、線描的方法,用朱紅、紅、熟褐、棕黃、翠綠、白色等色漆進行繪畫,漆畫也是中國最早的繪畫,是中國繪畫的源頭。
  2. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游梁式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液壓起立,減少了輔助作業時間。
  3. Combining with practice of china ' s uranium ore heap leac hi ng, this paper proposes main ways and suitable technologies in the fields of emp hasizing feasib ility research, adop - ting strengthened technologies, improving equipment le vel, op timizing control technological factors and developing application range and so o n, which include adopting acid - curring and ferric sulphate - tric kle leaching process, bacteria heap leaching, countercurrent heap leaching, sele cting advanced material of heap bottom, developing large mechanized heap constru ction equipments and methods, popularizing drip i rrigation distributing solution, optimizing heap leaching process parameters, as we ll as developing recovery equipments suited to heap leaching, etc, in order to i n crease leaching rate, reduce heap leaching period and achieve more economic bene fits

    結合我國鈾礦堆浸實際,在重視堆浸可行性研究、採用強化堆浸技術、改進堆浸裝備水平、嚴格工藝條件及拓寬堆浸的應用范圍等方面提出一些有效途徑及適用技術,包括採用拌酸熟化-高鐵淋濾浸出、細菌堆浸、制粒堆浸、逆流堆浸,選用優質底墊層材料,研製大型機械化築堆方法和設備,推廣滴灌式布液,優化堆浸工藝參數,以及開發堆浸相配套的回收設備等,以提高浸出率、縮短堆浸周期,獲得更大的經濟效益。
  4. Definition of the multivariable control strategy has been provided in sufficient detail with emphasis on the regenerator control, cracking conversion control, pressure balance control, main fractionator bottom control and cracking yields control

    從燒焦控制、裂化苛刻度控制、壓力平衡控制、分餾塔底控制和裂化產率優化控制等五方面詳細論述了反應-再生系統的控制策略。
  5. The bottom edges of the endplates are mated to another winglike device, the lower main plane, which in turn is attached to the rear crash structure ? a carbon fibre cone bolted onto the gearbox

    終板末端邊緣被設計成與另一個翼狀地設備相配合,這個翼狀設備是一個較低的平面,附著在尾部碰撞結構上? ?變速箱上面的碳纖維錐形螺釘。
  6. Afterwards, we comment on the history, present situation, and development of the multi - component seismics being a main technique from the view point of oil and gas exploration, and put forward further schemes for the multi - component sea - bottom seismics in accordance with our national high tech development project

    然後從油氣勘探角度對技術進步中的一項主要技術? ?多分量地震的歷史、現狀和發展作了評述,並結合國家863項目關于海上多波地震技術研究的狀況提出了進一步實施的設想。
  7. On top of one of the fast - opening ends that closed to the pig receiver & launcher shall assemble vent valve, safety valve and pressure gauge, and at the bottom shall assemble drain valve, sideway inlet and vent valve to take out medium from the main pipe as the power of forcing pig and conveyance medium

    靠近收發球筒快開盲板一端上部應設防空閥、安全閥及壓力表、下部設排污閥、側面設進、出油(氣、水)閥,以便從干管中取介質作為驅動清管器的動力及輸出介質。
  8. After demonstration we can get the main conclusions : there are notable positive relativity between audit fee and audtee ' s total assetses or subsidiaries, and auditor ' s scale ; while the audit opnion is not clean, audit fees are higher, but audit quality are n ' t increased that suggestes that independentance in chinese public audit market is negative. ; when auditors give special audit or consultations, they may demand more audit fees and their auditees may buy audit opinions ; there is pricing - cutting when cpa audit listed companies that need middle audit or special audit or consultations for the first time ; there is also a unprompted price bottom line in chinese public audit market, but audit quality is n ' t improved for it

    通過實證,得出的結論主要有:我國證券市場的審計費用和客戶資產、經營規模、事務所規模顯著正相關;出具非標準無保留意見的審計報告,審計費用較高,但審計質量並沒有提高;提供專項審計或管理咨詢服務的事務所收取的審計費用顯著偏高,上市公司有利用這些服務收買審計意見的行為;在有中期審計和專項審計或管理咨詢的公司,注冊會計師初次審計存在一定的「削價」行為;上市公司獨立審計市場自發形成審計價格下限,但沒因此促成審計質量自發的提高。
  9. What ' s more, we put forward some experienced formulas on the basis of the cortical analysis. the result of the research show that by installing diffluent piers with low ridge, we can eliminate the root of oscillatiny water jump, perfect the energy dissipation effect of water jump, also, we can improve the flow condition of down - stream. the fact that the main flow of down - stream is in the middle, not only effectively lower the speed of the bottom flow in the ridge rear, alleviate the erosion to the river bed, but also avoid the heavy wave resulted from the main flow in the surface, thus improve the surface wave of down - stream obviously. we can work out the body style parameters of diffluent piers with low ridge according to the project flow condition and experience formulas, and then reckon the down - stream surface wave condition for the protected building of the down - stream bank

    研究結果表明:設置低坎分流墩后,消除了擺動水躍水舌擺動的根源,提高了水躍的消能效果,改善了下游水流流態。下游水體的主流在中部,既有效的降低了坎后水流底流速,減輕水流對河床的沖刷,又避免了主流位於表面導致波浪過大的結果,下游的水面波浪明顯得到削減。依據經驗公式,可根據工程水流條件設計出低坎分流墩的體型參數,進而估算出下游沿程的水面波浪,為下游岸邊的砌護提供依據。
  10. Compared with measured data, this equation can describe the sediment concentration distribution better both in main flow region and near - bottom region

    與實測資料對比表明,該公式能更好地描述包含主流區與近底流區在內的泥沙含量分佈規律。
  11. The proportion that the sediment yield of the main gully accounts for the total sediment yield of the experimental watershed model is from48. 7 % to 66. 6 %, and the proportion that deposition sediment yield of main gully accounts for the total deposition sediment yield of the experimental watershed model is from64. 9 % to 99. 4 %. the developing process of topographic feature of the experimental watershed model. expanding the gully width and cutting down the gully bottom are the two chief forms of the topographic feature development

    流域模型地貌形態發育過程溝谷擴展和下切是流域模型地貌形態發育的主要形式,溝谷擴展發育主要發生在發育活躍時段,主溝所佔溝谷總面積比例在流域模型溝谷擴展發育過程中保持在60以上:主支溝下切發育在發育初期和發育活躍時段前期表現最為劇烈,其橫剖面為v字形,在發育初期和穩定時期時段呈現淺u字形和底部較為平坦的梯形,主溝的橫剖面發育明顯優先於各支溝。
  12. The main original work is as the followings : 1. longitudinal vibration of an integral pile in an uniform soil with end bearing boundary or elastic bottom boundary undergoing vertical harmonic load is theoretically investigated

    主要工作如下: 1 、分別對均質土中完整端承樁和彈性支承樁在垂直諧和激振力作用下的縱向振動特性進行了研究。
  13. Main machinery equipment are arranged at the bottom

    輪機的主要機器設備均布置在艙底。
  14. This son conceive outline novel, the topic has the mental strategy only, the paragraph is clear, the details difference, fall the delay to rise and fall, the main line is clear, fascinating, mild win to display the extraordinary knowledge work bottom, is witty it may be said, a classic, is the model that my generation should study

    這篇帖子構思新穎,題材獨具匠心,段落清晰,情節詭異,跌宕起伏,主線分明,引人入勝,平淡中顯示出不凡的知識功底,可謂是字字珠璣,句句經典,是我輩應當學習之典範。
  15. In addition, the main stress at the interface of the bottom flange and inclined web, which located at the interface with the diaphragm, is the largest. so, it should be taken more attention to them in design

    另外,橫隔梁與斜腹板及底板交界處的底板及斜腹板區域,其主應力數值最大,設計中應給予重視。
  16. Further more, with the reference of testing information, the paper analyzed the traveler construction technique, obtained the guy rope stress and the front - end bottom mark of traveler for each step. using fem theory and large general - purpose program ansys, the paper discussed the cable - stayed bridge space stress characteristic and the relationship between several main design parameters

    以此為基礎,參照試驗資料,詳細分析了斜拉橋施工中掛籃的施工工藝,及其各個狀態下的受力情況,得出在各個階段掛籃牽索的索力值及掛籃前端各個工況的主梁底立模標高。
  17. In this paper, we prepared 110x80mm ti : al2o3 crystal ( 11 stone ) by directional temperature gradient technique ( dtgt ), choosed its top, middle part and bottom, and fabricated powder samples with carnelian mortar. then we observed and analyzed the surface of ti stone by using sem, and found it is ti that is the main component of the black thing on the surface of ti stone

    本文採用導向溫度梯度法制備了110 80mmti : al _ 2o _ 3晶體(鈦寶石) ,並取其上部、中部、下部用瑪瑙研缽製成粉末樣品,用掃描電子顯微鏡對鈦寶石表面進行了觀察分析,結果表明鈦寶石表面上的黑色物質的主要成分為鈦。
  18. The main buildings on a central axis from top to bottom : hall of prayer for good harvest, imperial vault of heaven and circular mound altar

    天壇主要建築物集中在內壇中軸線,由上至下分別為祈年殿皇穹宇和圜丘壇。
  19. This vessel is a steel shallow draft flushing dredger of all - welded construction, with single deck, single bottom, transverse framing, transom stern and continuous superstructure, and sledge - shape bow. it is operating on the huanghe river for flushing and suctioning silt and sand with the purpose of controlling the huanghe river tongguan section, dredging the waterway and reducing the flooding. main engine : nt855 - m270

    本船為鋼質全焊接結構淺吃水內河自航沖砂清淤工作船,具單甲板其中艉舵機艙首甲板為升高甲板,單底,橫骨架式結構,方艉及連續上層建築首部採用雪橇式線型。
  20. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
分享友人