manpower scheduling 中文意思是什麼

manpower scheduling 解釋
人力調配
  • manpower : 人力;【機械工程】人力〈功率單位,=1/10馬力〉;有效人員總數。
  • scheduling : 編排;調度
  1. Develop a supportable piping project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning

    制定管道項目計劃,包括在工程設計,估算,設備和人力的規劃,以及質量保障,啟動和安裝的委託方面的戰略和實施的細節。
  2. Develop a supportable process project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning

    制定工藝項目進程計劃,包括在工程設計,估算,設備和人力的規劃,以及質量保障,啟動和安裝的委託方面的戰略和實施的細節。
  3. You will need to manage production and production scheduling, inventory control, manpower and shipment scheduling, administration and general affairs

    負責生產計劃安排和車間管理、庫存控制、人力資源、出貨計劃、行政和總務工作。
  4. The fundamentals and basic flow of genetic algorithm are discussed in detail. associated with the production mode and characteristics of wall - paper industry, its production scheduling belongs to the hybrid flow shop ' s problem. applied based - on permutation coding genetic algorithm and used minimal production time as target function, it is solved the problem of low efficiency of wall - paper production equipments " utility that is caused by manpower scheduling and improved the production efficiency

    2 )對生產調度問題的研究現狀和研究方法做了綜述和整理,深入探討了遺傳演算法的基本原理和基本流程,並結合墻紙行業的生產模式和生產特點,指出其屬于混合flowshop問題,採用基於置換編碼的遺傳演算法,並以最小生產時間作為目標函數,較好的解決了由人工調度帶來的墻紙生產設備使用效率偏低的問題,提高了生產效率。
  5. This article proposes a new system model for pdm project management system. the model is based on workflow and process management, depending on project planning, emphasizing task scheduling and manpower management, and covering technology management

    本文的面向設計院的pdm項目管理系統的模型是「以工作流和過程管理為基礎,依據項目計劃,以進度管理和人力資源管理為主線,進度管理和技術管理縱橫交叉的管理模型」 。
分享友人