mechanics of landslide 中文意思是什麼

mechanics of landslide 解釋
滑坡力學
  • mechanics : n. pl. 1. 〈作單數用〉力學 〈cf. statics; kinetics; kinematics〉; 機械學。2. 〈作復數用〉結構;構成法;技巧。
  • of : OF =Old French 古法語。
  • landslide : 1. = landslip. 2. 〈美國〉(選舉的)大勝利;壓倒的優勝 (the momentum of a landslide 排山倒海之勢)。
  1. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  2. When the three - gorge reservoir is sluiced, the underground water level will ascend obviously and mechanics parameters of the slip strip below the reservoir water level can drop further, sidaogou landslide can lose stability wholly in controlled condition influenced by buoyancy of underground water and saturation stress at water level dropping

    三峽水庫蓄水后,滑體內的地下水位將明顯抬高,庫水以下的滑帶力學參數會進一步降低,受滑體內地下水揚壓力及水庫水位降落時滲透壓力的影響,四道溝滑坡在控制工況下可能整體失穩。
  3. ( 5 ) conclusion was obtained by the analyzing and studying the mechanics environment of the rock mass and the landslide on right bank : according to the analysis, the present direction of the maximal principle stress was consistent with the present tectonic stress field, the value of the principle stress increased or reduced in special place, and there was tensile stress region at the 2000m or above it on the left bank, the accumulate and adjustment was very limited in 200 years, the calculated result of the landslide indicated that the landslide on the right bank was stable under the various conditions

    ( 5 )壩址區河谷巖體力學環境及右岸古滑坡體的穩定問題分析得出:河谷巖體應力場的分析顯示,河谷巖體中主應力的方向基本上與現今區域構造應力場的方向一致,在一些特殊地帶巖體的主應力值有所降低或增高,特別是在左岸的2000m高程附近及以上,存在有明顯張應力區。在未來200年流變計算時步范圍內,河谷巖體應力的積累與調整較為有限。同時對滑坡體各種工況條件下的穩定性計算結果表明,右岸古滑坡體在各種工況條件下是處于穩定狀態的。
  4. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  5. The forming condition , forming mechanics and the engineering geological characteristics of the landslide in yanshanmozhan is studied

    論述了楊山末站滑坡的形成條件、形成機理和滑體的工程地質特徵。
  6. Research on geo - mechanics parameters of dayantang landslide in shuibuya

    水布埡大巖淌滑坡巖土力學參數試驗研究
  7. Based on the above purpose, in this paper, aiming at the questions in the past landslide prediction, such as sole research technique, backward method and theory achievement with weak practical, application and so on, time prediction and evaluation of landslides is emphatically researched from quantitative, qualitative and numerical modeling three aspects on the basis of widely consulting the domestic and foreign documentation and material related to landslides forecast. according to landslide monitor material, landslide quantitative prediction is realized by using landslide prediction and evaluation models ; on the basis of experts " experience knowledge, landslide qualitative prediction is realized by using the method and way of expert system ; landslide numerical prediction is realized by using simulation method to establish geology - mechanics - distortion model ( gmd )

    基於上述目的,本論文針對過去滑坡預報的研究方法單一、手段落後,理論成果的實際應用性不強等問題,在廣泛查閱國內外有關滑坡預測預報文獻資料的基礎上,著重從定量、定性和數值模擬三個方面對滑坡的時間預測預報開展研究:依據滑坡的監測資料,運用滑坡預測預報模型實現了滑坡的定量預報;以專家的經驗知識為依據,運用專家系統的方法和手段實現了滑坡的定性預報;利用數值模擬手段,通過建立滑坡的地質?力學?變形模型( gmd模型)實現了滑坡的數值預報。
  8. On account of natural identity complexity of rocks and soils, density, cohesion, friction angle, slope angle, hole pressure ratio in describing physics and mechanics property of rocks and soils are singly uncertain, so the fuzzy optimization neural networks theory is applied to analyzing the landslide stability in order to probe into a new method of slope stability analysis

    由於巖土體自然特性的復雜性,用以描述巖土物理力學性質的容重、內聚力、內摩擦角,坡角,孔隙壓力比等指標本身就不是唯一確定的,因此,本文將模糊優選神經網路理論引入到滑坡穩定性評價中來,以求探討一種邊坡穩定分析的新方法。
分享友人