new water 中文意思是什麼

new water 解釋
初生水
  • new : NEW =net economic welfare 〈美國〉純經濟福利。adj 1 新的,嶄新的;新發現的,新發明的;新開發的。...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. You're glad to be a member of this new water fraternity.

    你也會為自己能成為這個新興的水上運動俱樂部的一名成員而感到高興的。
  2. Such methods as compounding retardants, compounding water - reducing agents ( which has various the extent of condensation ), changing the ways of addition and retardarce method, are used to impolder new water - reducing agent and construction method to salve slump loss, but it can not work drastically

    通過復合緩凝組分、不同縮合度減水劑的復合、改變摻加方式、緩釋法等技術路線開發新型減水劑和施工方法來解決坍落度損失問題,但是這一問題並沒有得到根本解決。
  3. Of the expected lifespan of the new water mains

    新水管的預期壽命?
  4. On the study and application of the new water supply pattern of ring nets on the demand sides

    需求側新型環網供水模式的研究及其應用
  5. Workmen digging a new water pipe in the centre of shiah holy city of karbala discovered the remains of dozens of people

    工人們在什葉派聖城卡巴拉是中心挖掘新的輸水管道時發現了很多人的屍骨。
  6. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  7. To solve this problem water supply authorities concerned are to start a new water supply project as soon as possible and calls the citizens to save water

    為此供水部門表示將盡快啟動新的供水工程項目,同時也希望市民節約用水。
  8. Cosmos bank office building s new water electricity construction

    萬泰商業銀行辦公大樓新建水電工程
  9. All costs necessary or incidental for removing the defective water heater or component part ( s ) and installing a new water heater or component part ( s )

    拆卸有缺陷的熱水器或部件,並安裝新的熱水器或部件所產生的所有必需的或偶然的費用。
  10. Establishment of experiment and demonstration area for new water - saving technologies and benefits analysis

    田間節水灌溉新技術試驗示範區的建議及節水增產效益
  11. The system follows carnot cycle principle. driven by electricity, its working substance absorbs the latent heat in the air or other low - temperature heat source, and waste heat let out of living or industry, compresses it to heat by compressor, exchange, exchange heat with water to higher the water temperature ( 55 warm ). it a new water heating apparatus, used in home heating, and influenced by environment runoff and the heat exchang of working substance. this system is more used in southem china

    根據逆卡諾循環原理,採用電能驅動,通過工質吸收空氣中或其他低溫熱源中無法被利用的太陽能潛熱、生活及工業排放的廢熱,通過壓縮機壓縮升溫,再與水換熱,使水溫升高,獲得( 55 )熱水,是一種新型的熱水製造設備,應用於家庭和熱水系統,受到環境溫差和工質換熱的影響,熱泵熱水器/熱水系統更多適合南方地區應用。
  12. The new water hammer mathematic model ( 3 ) fully meets the conditions of steady flow

    新的水擊數學模型( 3 )完全滿足恆定流條件。
  13. Setting up a scientific development view, furthering up implementation of the new water management thought

    樹立科學發展觀進一步貫徹治水新思路
  14. In the natural state, the confined water is mainly the palaeowater which was recharged in the past, and its circulation is slow ; but in the urban area where groundwater is exploited persistently, large volume of new water entered into the confined aquifer, and the rate of recharge from the upper aquifer accounts for 50 %

    天然狀態下,承壓水為古地質時期補給形成的「古水」 ,地下水交替緩慢;開采狀況下,平原東部承壓水受到了現代補給水的影響,潛水越流量占補給量的50 %左右。
  15. Then. you pour new water and put the white daisy in

    然後你換上清水.插上白色雛菊
  16. Xh rubber slowly - closing cut - off vavle is a new water supply and drainage vavle with full rubber structure, duck - mouthed appearance and functions or positive flow - in and reserve cut - off. according to thrust analysis and calculation as well as different operation mechanism and different rubber products by special processing. all will be open at weak hydraulic pressure is higher, the vavle gate will open more greatly and the water flow is greater. at reserve operation, the vavle gate closes naturally and seals tightly cut - off vavle ; the back pressure is higher, the vavle gate closes more tightly and the seal effect is better. it is used widely in various drainage exit to prevent from pouring backwards and flowing backwards in city planning, water conservancy and sewage disposal etc. it is the ideal productto replace flap vavle

    Xf型橡膠緩閉逆止閥是一種全橡膠結構外形呈「鴨嘴狀」 ,具有「正向流入反向逆止」功能的新型給排水閥門產品。它根據受力分析和受力計算,針對不同的工況,採用不同的設計機理,選用不同的橡膠配方,並按特殊工藝製作而成。正向工作時,水由進水口流入,微小的水壓,便能打開閥門,水壓越大,閥門開啟越大,水流量越大。
  17. Newater was also fun and educational if you can believe that. if only more of the world could learn from singapore how to conserve water and make " new " water

    新生水相當有趣且附有教育意義,如果這個世界上有更多國家願意跟新加坡學習,我們就能創造新生水。
  18. It explains the aquatic products industry briefly and presents the definition of water economy. then it establishes the model of new water economy and gives the minute description of the function of the government and the market. 5

    本章從水資源的基本屬性出發,對水產業的內涵及外延進行了界定;提出了現代水經濟的概念,並在此基礎上建立了現代城市水經濟模型,指出了現代水經濟與傳統水經濟的差異。
  19. New water - base drilling fluid technologies at home and abroad

    國內外水基鉆井液新技術
  20. On this base, a new water managemat pattern of orchard on weibei highland, “ grass planting beween apple tree rows + wheat straw mulching on the region of apple tree roots ”, was put forward

    在此基礎上,提出了渭北旱地果園各種年型下「果樹行間生草+樹盤秸稈覆蓋」的水分管理新模式。
分享友人