overburden rock 中文意思是什麼

overburden rock 解釋
復蓋巖層
  • overburden : vt 裝載過多,使負擔過度,使過勞;壓垂。 trees overburdened with fruit 果子結得過多的樹。n 1 過重...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  1. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  2. Elementary analysis on breaking feature of overburden rock during mining under special nappe structure

    特殊推覆體下開采覆巖破壞特性淺析
  3. Application of decreasing surface subsidence technology with grouting to separate layers in rock overburden in mine

    粉煤灰充填離層空間物理力學機理實驗研究
  4. Numerical simulation of failure process of overburden rock strata caused by mining excavation

    采動影響下覆巖垮落過程的數值模擬
  5. Based on its special geological and mining conditions of qidong colliery, the cause of water bursting of loose aquifer in the 4th lineage in 7 ( subscript 1 ) 14 full - mechanized mining face of the first mining area was analyzed and technology method of preventing the 4th loose aquifer was discussed according to the occurrence characteristics of loose aquifer and damage characteristics of overburden rock in 7 ( subscript 1 ) coal seam

    摘要根據祁東煤礦特殊的地質采礦條件,結合鬆散含水層賦存特徵及7 (下標1 )煤層覆巖破壞特點,分析了一采區7 (下標1 ) 14綜采工作面第四系鬆散含水層出水的原因,探討了防治四含水的技術途徑。
  6. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  7. According to the hydraulic - mechanical coupling theory, the paper puts forward a method to predict the wall rock permeability for tunnels with superthick overburden

    以水力耦合理論為基礎,該文提出了一種超深隧道圍巖滲透性預測方法。
  8. Therefore, in the process of load transfer within the unconsolidated confined aquifer, the key strata of overburden rock are prone to have a compound breakage when the load on the upper interface of bedrock is great and the bedrock is very thin

    在鬆散承壓含水層的載荷傳遞作用下,作用在基巖頂界面的載荷較大,當基巖厚度較薄時,采場覆巖關鍵層易產生復合破斷。
  9. Research on site measurement and numerical simulation method of development height for crack zone of overburden rock

    覆巖裂縫帶發育高度的實測與數值模擬方法研究
  10. Investigations of the raw material in hardcoal - mining ; macroscopic classification and description of overburden rock

    煤礦原料勘探.覆層巖石的宏觀描述和分類
  11. The experimental research of numerical simulation for the depth mining ' s effect on the law of movement and failure of overburden rock seam

    采動對巖層移動破壞規律的數值模擬試驗研究
  12. 3d fem analysis on ground surface deformation caused by mining under thick rock overburden

    厚覆蓋巖層下采礦引起地表變形的三維有限元分析
分享友人