permanent construction 中文意思是什麼

permanent construction 解釋
永久建築
  • permanent : adj. 1. 永久的,不變的,耐久的;持久的,經久的。2. 常務的,常設的 (opp. temporary)。n. 電燙發 (=permanent wave)。adv. -ly
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The construction project for the bridge was included in the 11th five - year plan for guangdong province and vice governor zhong yangsheng announced the plan during a meeting of the permanent committee of the popular congress of the province

    粵港澳大橋工程項目是廣東省「十一五」計劃的一部分,副省長鐘陽勝在廣東省人大常委會上宣布了這一計劃。
  2. Construction of permanent magnet synchronous motors servo system

    同步型永磁交流伺服系統控制技術評述
  3. Article 31 when construction projects of a permanent nature are being erected on either side of a highway, the distance from the edge of the building facing the highway to the outer rim of the roadside ditch of the highway should be no less than 20m for state highways, 15m for provincial highways, 10m for county roads, and 5m for township roads

    第三十一條在公路兩側修建永久性工程設施,其建築物邊緣與公路邊溝外緣的間距為;國道不少於二十米,省道不少於十五米,縣道不少於十米,鄉道不少於五米。
  4. Plan to designate the waters south of cheung chau as a permanent dumping area for construction waste

    把長洲以南水域闢作建築廢料永久傾倒區的計劃
  5. Design engineers now selecting pmbldc motors over conventional dc or induction motor drives for the following reasons : 1 ) the absence of brushes results in an essentially maintenance free operation and eliminates the undesirable effects of commutation such as sparks, brush - loss, radio - frequency interference, etc. 2 ) the low inertia of the rotor enhances the quality of the mechanical response of the motor, shortening the acceleration and deceleration time. 3 ) utilizing rare - earth permanent magnet materials with high coercive force results in substantially higher efficiency than their counterpart with brushes of the same size. 4 ) because of the absence of commutation segments, the stator construction is simple

    現在的工程師們更為青睞永磁無刷直流電動機是因為以下幾點原因: ( 1 )去除了電刷的永磁無刷直流電動機徹底地免除了維護而且消除了我們不希望的由於換向帶來的火花、電刷損耗以及無線電干擾等等; ( 2 )低轉動慣量的轉子提高了電機機械響應的質量,從而縮短了電機加速和減速的時間; ( 3 )高矯頑力稀土永磁材料的使用使得同樣尺寸的永磁無刷直流電動機比傳統的直流電動機效率高; ( 4 )由於沒有機械換向部分定子的結構簡單了。
  6. Cementitious capillary crystalline waterproofing coating ( abbreviated ccwc ) is a new type of cement - based waterproofing materials, which is characterized by its very good adhesive performance and impermeability to water, self - rehabilitating ability, permanent waterproofing effect, good aging resistance and corrosion resistance, simple construction method and harmless to hunman etc. ccwc consists of ordinary portland cement, quartz sand and reactive substances and other supplementary ingredients, whose reactive substance can permeate into the internal part of concrete structures through water and produce insoluble crystals filling capillary pores or crack of the concret through reaction with cement hydrates and unhydrates

    水泥基滲透結晶型防水材料是以硅酸鹽水泥或普通硅酸鹽水泥、石英砂等為基材,摻入活性化學物質而組成的一種新型防水材料。摻入的活性化學物質以水作載體向混凝土內部滲透,與混凝土中未水化的水泥及部分水泥水化產物發生結晶反應,生成不溶於水的結晶體,堵塞毛細孔道,使混凝土緻密、防水。這種防水材料具有粘結力強、抗滲性能好、自愈合能力強、防水效果持久、耐老化、耐腐蝕、易施工、對人類無害等特點。
  7. In recent years, professor clark s research interest has concentrated on the structural effects of defects and deterioration, the quality of construction on site as well as the health and safety aspects of both permanent and temporary works

    近年,賈教授致力鉆研工程瘕?及損蝕對結構的影響地盤建造質素短期和長期工程的健康與安全。
  8. Finally, systemic technology of design and construction of sfrc in tunnel engineering, by the example of gao niangou tunnel, which located at xi " an - an kang railway, and where sfrc was used as permanent lining, was discussed

    最後通過西康線高碥溝隧道採用鋼纖維混凝土作為隧道永久襯砌的成功事例,系統介紹了在隧道工程中,噴射鋼纖維混凝土的設計和施工技術。
  9. Sintered soco permanent magnetic materials would make some slight collision in the process of producing, packing and delivering, so there may be have some visual flaw owing to a bit small horn. however, it wouldnt damage its magnetic specifications, its stability and its anti - degenerated magnetic ability as long as its flaw doesnt affect normal construction or functions

    燒結釤鈷永磁體因在生產包裝運輸過程中輕微碰撞會有稍微的小缺角等外觀缺陷,只要不影響正常組裝或功能,不會損害磁體的磁性能及其穩定性和抗退磁能力。
  10. Nbc universal says the project would create 17, 000 construction jobs and add another 11, 000 permanent jobs at the studio

    Nbc環球影業公司表示該項目將會提供17000個建築工作,另外有11000個在攝影場的永久性工作。
  11. Article 26 a construction unit shall, in carrying out engineering construction, seek to get around permanent surveying markers ; if it is absolutely impossible to get around such markers and necessary to have them removed or rendered ineffective, the construction unit shall acquire consent from the unit that has established the permanent surveying markers, and, obtain approval from the competent department of surveying and mapping administration under the state council or from the department of surveying and mapping administration of the people ' s government of the relevant province, autonomous region or municipality directly under the central government

    第二十六條進行工程建設,應當避開永久性測量標志;確實無法避開,需要拆遷永久性測量標志或者使該測量標志失去效能的,建設單位應當取得設置永久性測量標志單位的同意,經國務院測繪行政主管部門或者省、自治區、直轄市人民政府管理測繪工作的部門批準。
  12. The hybrid claw - pole alternators have magnetic fields contributed by permanent magnet as well as excitation coil, and the advantages are high efficiency, have good low - speed characteristics, excitation adjustable and high flux densities. for the reason of complex claw - pole construction and 3 - d magnetic field distributions, there is lack of the research on the alternators

    混合勵磁爪極發電機是由永磁體和勵磁線圈共同產生電機磁場的一種發電機,與傳統的爪極發電機相比有高效、低速性能好和集線圈勵磁的電壓調節性能與高磁通密度的優點,具有很好的研究前景和使用價值。
  13. Under cepa ii, the residency requirement is waived for hong kong permanent residents employed as engineering technical staff and financial managerial staff. registered capital requirements for domestic and joint - venture construction enterprises remain slightly different

    根據cepa第二階段,香港服務提供者在內地設立的建築業企業中,出任工程技術人員和經濟管理人員的香港永久性居民,每年在內地的居住時間不受限制。
  14. Permanent tenancy the direction of farm land institution reform under the background of new village construction

    新農村建設背景下農地制度的改革方向
  15. When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred

    在通航或者竹木流放的河流上修建永久性攔河閘壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。
  16. Work commenced in late 2001 on the construction of a new police dog & police search unit complex at sha ling to provide permanent facilities for both units that are now housed in temporary premises. at a cost of $ 159 million, the complex is scheduled for completion in 2003

    沙嶺警犬訓練中心及搜查隊設施的興建工程亦於同年年底展開,為目前臨時設于別處的警犬隊及搜查隊提供永久設施,有關建築費用為1億5 , 900萬元,預期於二三年竣工。
  17. The paper deals mainly about the application of sfrc in permanent shotcrete linings in tunnel construction

    而在這種單層襯砌施工中用鋼纖維混凝土取代普通混凝土有一定的實際意義。
  18. The creation of permanent wetland areas prior to railway construction, which will be professionally managed for wildlife will make a major contribution to preserving habitat diversity, ensuring that long valley provides a home for its diverse bird community in permanently protected areas that are not under threat because of farming activities. the statements that 38 black - faced spoonbills have been sighted within our eia study area are misleading

    落馬洲支線環境影響評估研究所提出的補償措施,正是針對這個問題而訂定,其中為野生生物建造永久濕地的建議,可確保不同種類的雀鳥在?原一個永久受保護的環境內棲息,免受農耕活動的威脅,對保存棲息地的多元性尤具意義。
  19. The private house construction in the urban areas and industrial and mining areas includes all the private house construction under the jurisdiction of cities, counties, towns and industrial and mining areas, no matter whether the owner or the house is registered as the permanent resident in the locality or not

    城鎮和工礦區私人建房包括市、縣城、鎮、工礦區所轄范圍內的全部私人建房,不論其房主是否系本地的常住戶口均應包括。
  20. Through the research on corporate culture and core competence, this article raises the idea that corporate culture is the core factor of corporate competence, and the source of corporate permanent competitive advantage. to improve the core competence is the starting point of corporate culture construction, and the aim of culture innovation and reform. it also suggests that labor resource management is the connection between culture and core competence and honesty is the base, intangible capital such as brand and public appearance is the manifestation

    通過對企業文化與企業核心競爭力的研究,本文提出企業文化是企業核心競爭力的核心要素,是企業長久競爭優勢的源泉;而提高企業核心競爭力是企業文化建設的落腳點和歸宿,是企業文化創新和變革的目標;提出人力資源管理是企業文化與企業核心競爭力的聯系紐帶,誠信是企業文化與企業核心競爭力的基石,品牌、企業形象等無形資產是企業核心競爭的外在表現。
分享友人