pier body 中文意思是什麼

pier body 解釋
墩體
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  • body : n 1 身體,體軀,肉體;屍首;軀干,【林業】立木。2 本體,主體;主力;本文,正文;部分。3 (衣服的...
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. Masidun is often made from ceramics and stoneware, usually pier - shaped or urn - shaped. the body of the utensil is generally decorated with patterns

    麻絲墩材質多為陶、炻,形制多作墩形、坡(甕)形,器身上多飾以圖案。
  3. Please note that whether the reprovisioned facilities are to be integrated with other buildings of wkcd or not, the divisional fire station, physical training establishment office, and ancillary facilities should be relocated as a unique body within the indicated boundary as shown in plan 13, and the fireboat station and fireboat pier should be relocated to a suitable waterfront site of the development area to the satisfaction of the fire services department, as stated in section 4. 3. 5 ( a ) ( ii ) of volume one of the ifp

    請留意,無論重置設施是否與西九龍文娛藝術區的其他建築物結合起來,分區消防總局、體能訓練組辦事處和附屬設施均須以獨特建築體的形式,重置於圖13所顯示的界線之內。至於滅火輪消防局和滅火輪碼頭,則須按發展建議邀請書第一冊第4
  4. A slow, black boat setting out from the pier at twenty - seventh street upon its weekly errand bore, with many others, his nameless body to the potter s field. thus passed all that was of interest concerning these twain in their relation to her

    一隻每星期從二十七街碼頭慢慢駛出的黑船,把他的和許多其他的無名屍體一起載到了保得墳常這兩個傢伙和她之間的有趣故事,就這樣結束了。
  5. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  6. In this thesis a numerical model to solve the planear 2 - d depth - integrated flow ( dif ) has been established with irregular body - fitted mesh finite volume method and explicit maccormack predictor - corrector method and applied to the study of damming caused by a bridge pier under 14 working conditions varied with the combination of different pier shape. flow rate and contraction ratio

    本論文採用非規則貼體網格有限體積法和顯式maccormack預測-校正法求解平面二維水深積分方程,對明渠水流運動的數值模擬方法進行了研究,並且應用該數值模型計算了14種不同的橋墩體型、來流、收縮比的組合工況下的橋墩壅水問題。
分享友人