pile cap 中文意思是什麼

pile cap 解釋
椿承臺
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • cap : n 1 無邊帽,便帽;制服帽;軍帽;頭巾。2 鞘,(筆)套,蓋,罩子;(鞋)尖。3 【建築】柱頭;【礦物...
  1. The influences of fender piles on pile cap reactions, settlements, moments and twist moments of raft are discussed herein

    討論了考慮圍護樁作用對樁頂反力、沉降及筏板彎矩、扭矩所帶來的影響。
  2. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  3. General view - shallow water region pile cap work - cofferdam construction

    淺水區的樁帽建造-圍堰建造中
  4. General view - deep water region pier 2 - raised pile cap construction

    深水區2號橋墩-外露樁帽建造
  5. To counter the main reasons of piles ' displacement and inclination, i. e., 1 ) greater lodging after removal of pile cap ; 2 ) inclination of pile frame ; 3 ) driving into ballast course ; 4 ) obvious rolling of excavated mud surface, a set of effective measures dealing with deviation of marine driving are offered

    針對其中影響樁跑位和樁傾斜的主要原因,即: 1 )起帽后樁倒伏大; 2 )樁架不垂直; 3 )碎石層上沉樁; 4 )挖泥泥面起伏大,總結出一套控制水上沉樁偏位行之有效的方法。
  6. Main tower - pile cap construction - stainless rebar tt layer - couplers for walls of main pylon

    主塔樁帽-鋼筋tt層及供連接主塔韁墻壁內之鋼筋的聯接器
  7. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  8. The interaction among embankment fill, horizontal geotextile, pile ( cap ) and subsoil was analyzed based on the principle of minimum potential energy, and pile efficacy was obtained

    摘要基於最小勢能原理,分析了路堤填土、水平加筋體、樁(樁頂托板)及樁間土之間的相互作用,得到了樁體荷載分擔比。
  9. Crack control of pile cap mass concrete of sea - span bridge

    跨海大橋大體積承臺混凝土裂紋控制
  10. High - rise pile cap

    深基礎高樁承臺
  11. With the development of construction technology and mechanic about deepwater foundation, hanging box weir had being applied widely for construction of high pile cap

    隨著深水基礎施工技術和機械的發展,吊箱圍堰在高樁承臺施工中的應用日益廣泛。
  12. In this paper, by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city, the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme, working principles, construction technology and construction key points, and the matters of attention in the construction with the cofferdam are expatiated as well

    以柳州市三門江大橋高樁承臺施工為例,介紹拉壓柱式鋼吊箱圍堰的設計與施工,重點介紹鋼吊箱圍堰的設計方案、工作原理、施工工藝及施工要點等技術細節,同時對鋼吊箱圍堰施工中的注意事項進行了闡述。
  13. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  14. Through the algorithm of ann, the author has made out the three - layers and four - layers bp nets to intelligently study and reason, supporting decision on the detail reasoning, such as piles " capacity and pile cap ' s bearing pressure

    根據神經網路的學習演算法,編制了三層及四層bp網路的學習及推理程序。該程序在某些細部問題(如確定樁的承載力、承臺反力等)上提供輔助決策。
  15. Low pile cap

    深基礎低樁承臺
  16. To exert the strength of the piles and soil between the piles sufficiently, one pile cap is put on the top of the pile, and then gravel cushion is above, in the middle of the gravel cushion a layer of steel net is placed, and all these form the pile - net - cushion composite ground

    為了充分發揮樁身強度大和樁間天然地基承載力的作用,應選擇在樁的頂部設置樁帽和加鋪碎石加筋墊層,形成樁網墊層的控沉疏樁復合地基。
  17. Pile cap construction at grid 2 adjacent to slip road from tuen mun road

    于屯門公路入口之二號位建造樁頂
  18. At last, the resultes are compared with those without adoption of random field model and the reliability of pile foundation under vertical load is systematically studied. the conclusion is that the interaction of piles group - soil - pile cap has great effect on the reliability of the pile foundation

    並與未採用隨機場模型的計算結果相比較,對豎向荷載下樁基可靠性進行了較系統的研究,說明樁群?土?承臺相互作用的特性對整個樁基礎的可靠度有很大影響。
  19. Through the choice of pile - cap concrete ' s raw material and the mix optimization design, it is concluded that the mix design of mass concrete not only satisfy all the design requirements, but also attain the anti - crack concrete

    實例證實:通過對大體積混凝土的原材料選擇和配合比的優化設計,不僅能保證大體積混凝土的設計要求,也實現了大體積混凝土防裂的目標。
  20. An experimental study on steel fiber reinforced concrete ( sfrc ) thick cap with four piles indicates that the factors affecting its ultimate loads are composed of its effective thickness, steel fiber volume ratio, concrete strength grade, shear span length, steel ratio and the form of reinforcement, in which the factor of the form of reinforcement affecting the ultimate loads of pile cap is distinct

    摘要鋼纖維混凝土四樁厚承臺的性能試驗研究結果表明,影響其極限荷載的因素主要有承臺有效厚度、鋼纖維體積率、混凝土基體強度等級、承臺的剪跨比、縱向鋼筋配筋率和配筋形式等,其中,配筋形式對鋼纖維混凝土厚承臺承載力的影響是很顯著的。
分享友人