pile pier 中文意思是什麼

pile pier 解釋
椿墩
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁鉆孔機適用於鬆散地層、粘泥層、砂礫層、破碎層和巖石層等多種地質條件的大直徑橋樁孔,以及其它各種大直徑成孔施工。
  3. In combination with the work of < the design and technical construction rules of flexible dolphin pier in port engineering > of designing institute of water transport of transport, the data of some typical experiments of domestic and international pile foundation were analysed emphatically. through comparion of the relation of p - y curves between single pile and pile group under lateral loading and lateral reciprocating loading, the experience formula of p - y curve of single pile under reciprocating loading role is put forward

    本文結合中交水運規劃設計院《港口工程柔性靠船墩設計與施工技術規程》的編制工作,著重分析了國內外幾組典型的試樁資料,通過對比水平靜載單樁、群樁和往復荷載單樁p ? y曲線的關系,提出了往復荷載作用下的單樁p ? y曲線的經驗公式。
  4. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  5. General view - deep water region pier 2 - raised pile cap construction

    深水區2號橋墩-外露樁帽建造
  6. Deformation and slide have taken place at both the surface of the pier and part of the quay walls in wood pile - supported pier in qingdao

    青島港木質高樁碼頭表面和岸壁局部發生了變形和滑塌。
  7. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗橋設計使用壽命100年的要求,確定出高耐久性混凝土的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對橋梁的墩柱、蓋梁、預制箱梁和橋面板用高耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  8. Works are accomplished as follows in this paper : firstly, according to the real condition of the fourth pier, through analysis of several generally - used anti - slipping schemes, new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping

    為此本文主要做了以下工作:首先根據4 #墩基礎的具體條件,通過對現有常用的幾種抗滑方案的綜合比較分析,提出了以工程本身的鉆孔樁基礎代替錨固柱樁防止鋼圍堰滑移的方案。
  9. Calculated length of compression bar in pile bent column pier

    單排樁柱墩壓桿的計算長度
  10. Strengthening design and construction monitoring of the pile foundation and pier coping of no. 9 pier of xiedie bridge

    謝疊大橋9號墩樁基和蓋梁加固設計與施工監控
  11. Smw method is a kind of pile pier and slab wall, featured by wider application, lower cost and shorter construction period

    摘要勁性水泥土攪拌連續墻( smw )作為排樁和板墻式圍護結構的一種,以其適用性強、圍護成本相對較低、施工周期短而倍受關注。
  12. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  13. With the development of offshore engineering, pile foundation had been widely used in the offshore platform, port pier, etc.

    隨著近海工程的發展,樁基被廣泛地應用於近海平臺、港口碼頭等。
  14. Analysis of calculating method of the natural frequency of bridge pier supported by pile foundation

    樁基橋墩自振頻率計算方法的分析
  15. General view - pier 16 - 18 bored pile construction for pier 16 - 19

    16至19號橋墩-鉆樁工程
  16. Bored pile construction at tab pier 19 16

    19至16號橋墩-鉆樁工程
  17. Bored pile construction for pier 36 - 38

    36至38號橋墩-鉆樁工程
  18. Bored pile construction at tab pier 35

    35號橋墩-鉆樁工程
  19. Pier 2 - bored pile construction

    2號橋墩-鉆樁工程
  20. Pier 9 - bored pile construction

    9號橋墩-鉆樁工程
分享友人