pillar method 中文意思是什麼

pillar method 解釋
柱式采礦法
  • pillar : n 1 柱;紀念柱;(柱)墩,柱腳;【礦物】(礦井中硬炭層或巖石形成的)礦柱,煤柱。2 柱狀物〈水柱,...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Application of pedrail - walking type hydraulic supports in board and pillar mining method

    房柱式開采中履帶行走式液壓支架的應用
  2. Abstract : the distribution of cooling air which is in the grille - brick of the inner combustion hot air stove has been simulated with three dimension turbulent mathematical model so as to find a method which is used to improve the distribution of cooling air in hot air stove. the influence of differential horizontal plates on the distribution of cooling air is discussed. the results show that original big circle round field of flow in the pillar - cavity is changed into full one - way field of flow and edges gas flow, at the same time, is increased by horizontal plates. there is a different function with horizontal plates and vertical plates. to make the uniform distribution of cooling air in the hot air stove, it is necessary that horizontal plates and vertical plates are used in a combined way

    文摘:應用紊流三維數學模型模擬內燃式熱風爐內冷風在格子磚柱中的分佈,尋求改善其分佈的途徑.討論了加設不同布置的水平導流板對氣流分佈的影響.模擬結果表明,在支柱空腔內加設水平導流板改變了原有大迴旋流場,使迴旋流變成大面積的單向流.通過在支柱空腔內加設水平導流板可以發展邊緣氣流,這恰好與加設豎直導流板的作用相反,水平導流板和豎直導流板的結合使用有望實現冷風在格子磚柱中的均勻分佈
  3. Mining method under coal pillar in close distance coal seam

    近距離煤層煤柱下的開采方法
  4. A new design method for anchor pillar and plate supporting system of soil landhill

    土質邊坡錨柱板支護系統設計新方法
  5. New method of tilt jack angle steel location of half - dig cross - pillar base

    半掏挖斜柱基礎斜插角鋼定位新方法
  6. Pillar method of stoping

    柱式采礦法
  7. The upward horizontal slice stoping and filling without intervening pillar is the main mining method in huangshaping pb - zn mine

    摘要上向水平分層充鎮無間柱采礦法是黃沙坪鉛鋅礦的主要采礦方法。
  8. Application of room - pillar method with artificial roof support in dongbaoshan mine

    人工頂柱房柱法在東寶山礦區的應用
  9. On the illustration of mining in deeply inclined coal seam under buildings in muchengjian colliery in beijing, the confirmation method of coal pillar dimension and the united layout of pseudo - dip strip pillar and boundary pillar were put forward to provide theory foundation for the control of surface movement and subsidence in the mining of deeply inclined coal seam

    摘要以北京木城澗煤礦大臺井建築物下壓煤開采為例,提出了急傾斜煤層開采條件下條帶煤柱尺寸的確定方法和傾斜條帶煤柱與邊界煤柱相結合的條帶布置方案,為急傾斜煤層開采地表沉陷控制提供了理論依據。
  10. The comparison between simulation result for complete vehicle with modified b - pillar and that for original one shows that the crash simulation is a feasible way to ensure a newly designed vehicle having good crashworthiness and the structural optimization by fea is an effective method to provide valuable idea for conceptual design of structures

    由改進前後的整車側面碰撞模擬計算結果對比表明,部件的碰撞模擬設計是確保設計車輛具有良好碰撞性能的一種重要的方法和手段,應用有限元法進行結構優化設計是一種有效的方法。
  11. The characteristics of the intrinsic frequency distribution of the framed steam turbine - generator set foundation are summarized ; it can been seen that the base plate of the framed foundation does not have much effect on the dynamic response of the foundation, and that the " amplitude method " is better than the " resonance method " among dynamic analysis methods. when designing a framed foundation, as long as the load - bearing capacity and stability is ensured, a flexible pillar is better, the amplitude of vibration can be controlled through adjusting the particle quality in foundation design

    論文最後總結了框架式汽輪發電機組基礎固有頻率的分佈特點;指出框架式基礎底板本身對基礎的動力響應影響不大,認為動力分析方法中振幅法優于共振法;並指出框架式基礎設計時,在滿足承載力和穩定性的前提下,柱子應以柔為佳;設計中可以通過調整質點的質量來達到控制基礎振幅的目的。
  12. Analysis on developing new room and pillar mining method in shendong coalfield

    神東煤田發展新型房柱式採煤方法的分析
  13. A probe into the calculation method on coping ' s internal force of pillar pier

    柱式橋墩蓋梁內力計算方法探討
  14. Pillar and breast method

    房柱式井采法
  15. Technical analysis on feasibility of new room and pillar mining method

    新型房柱式採煤法可行性技術分析
  16. On the other hand, we have imitated the pillar and taken the finite element method to simulating it. as a result, dynamic function of steel fiber polymer concrete pillar is obviously better than cast iron, and static function better than polymer concrete

    並對這種配比的鋼纖維聚合物混凝土立柱進行模擬分析,結果表明用該種材料製作機床基礎件其動態性能明顯優于鑄鐵,而且靜態性能優于聚合物混凝土。
  17. Application practice of pre - truncating crest room - and - pillar method at houzhuang mine

    預切頂房柱采礦法在侯莊礦區的應用實踐
  18. Practice of pillar mining method adapted under the industrial yard of dongzhuang coal mine

    董莊煤礦工業廣場煤柱開採的實踐
  19. Analysis of the method for constructing the cross - measures roadways of the pillar extraction face

    煤柱采面過穿層巷道施工方法研究
  20. Rational decision of pillar ' s size of wongawilli mining method

    旺格維利採煤法煤柱尺寸的合理確定
分享友人