point bridge 中文意思是什麼

point bridge 解釋
布里奇角
  • point : n 1 尖頭,尖端;尖頭器具;〈美國〉筆尖;接種針,雕刻針,編織針;小岬,小地角;【拳擊】下巴。2 【...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. The following night they passed through the strait of bab - el - mandeb, which means in arabic the bridge of tears, and the next day they put in at steamer point, north - west of aden harbour, to take in coal

    這個名字,阿拉伯文的意思是「流淚之門」 。第二天是14號,蒙古號停泊在亞丁灣西北的汽船岬,因為要在那裡加煤。
  3. 3. as to vehicle - bridge system coupling vibration, this difficulty in engineering industry, it was abstractly summarized in this thesis, and introduce a method to establish and resolve equations about such coupling vibration, bring forward a flow chart to write correlative software ; with the help of ansys, make out some work about preparatory simulation, so as to research basic point of chicle - bridge system coupling vibration

    3 、對車橋耦合振動這一業內的難點進行了理論上的分析,引入了一種建立和求解車橋耦合振動系統方程的較為典型的方法,提出了一份自行編製程序的流程簡圖;借用ansys軟體對該橋做了車橋耦合振動的初步模擬計算,探索車橋共振的基本特點。
  4. A new starting point of the eurasian continental bridge

    亞歐大陸橋的新起點
  5. Major projects under planning include the traffic improvements to tuen mun road town centre section, reconstruction and improvement to tuen mun road, widening of the tolo highway fanling highway between island house interchange and fanling, the central - wanchai bypass and the island eastern corridor link, improvement to island eastern corridor between causeway bay and north point, central kowloon route, widening of gascoigne road flyover, route 4 between kennedy town and aberdeen and retrofitting of noise barriers on 8 existing road sections. hk - zhuhai - macao bridge hk project management office

    而籌劃中的項目有屯門公路市中心段交通改善工程屯門公路重建及改善工程舊政務司官邸附近道路交匯處與粉嶺之間的吐露港公路粉嶺公路擴闊工程中環及灣仔繞道和東區走廊連接路銅鑼灣至北角的東區走廊改善工程中九干線加士居道行車天橋擴闊工程四號干線堅尼地城至香港仔及加建隔音屏障工程於八條現有道路。
  6. The entire hzmb is a 35km dual 3 - lane carriageway in the form of bridge - cum - tunnel structure comprising the 29km zhujiang section from the landing point at gongbei of zhuhai and a prola of macao to the boundary of the hksar, and the 6km hong kong section from the boundary of hksar to the landing point at san shek wan of lantau island. the project includes

    整條港珠澳大橋分為珠江和香港兩段,珠江段長約29公里,從位於珠海拱北和澳門明珠的大橋陸點至香港特別行政區區界,而長約6公里的香港段則由香港特區區界至位於香港大嶼山石灣的香港側陸點,工程范圍包括: -
  7. First, the open - ending of chinese offers all - direction gaps ; then the vagueness leaves enough scope for furthering research ; the elements of this subject paves a springboard. the synthesis of chinese constructs a bridge for it. the period of fashion inserts fresh air into the research study. the key point of this essay is the implementation of strategies of teaching and learning into the chinese teaching by the method of research study

    語文學科的開放性,為研究性學習提供了多向性介面;語文學科的模糊性,為研究性學習留下了深入鉆研的餘地;語文學科的基礎性,為研究性學習鋪設了跳板;語文學科的綜合性,為研究性學習搭建了橋梁;語文學科的時代性,為研究性學習注入了活水。
  8. Location of project : mainly including the north main precinct of beijing coking plant, adjacent to beijing dye processing plant in the west, 5th ring road in the east, huagong road in the south, old boluoying village in the north and huagong bridge in the southeast corner, as the starting point of another jing - jin - tang expressway and also a major part of beijing

    項目位置:主要包括北京焦化廠北區主廠區的用地,西鄰北京染料廠,東臨五環路,南臨化工路,北側為孛羅營舊村,東南角臨化工橋,是第二條京津塘高速路的起點,也是城市的一個重點區域。
  9. The failure of the point pleasant or silver bridge, in west virginia, in 1967 which was caused by the fracture of an eyebar is well known.

    眾所周知,1961年西弗吉尼亞洲的萊森特角橋又名銀橋的破壞是由於眼桿斷裂引起的。
  10. The failure of the point pleasant or silver bridge, in west virginia, in 1967 which was caused by the fracture of an eyebar is well known

    眾所周知, 1961年西弗吉尼亞洲的萊森特角橋又名銀橋的破壞是由於眼桿斷裂引起的。
  11. The landing point for the hong kong - zhuhai - macao bridge will be on northwest lantau

    港珠澳大橋的香港陸點也會在這島嶼的西北面。
  12. Raiders game : 1, click on the lid, open the lid 2, the right point upward yellow arrow, up a curs from three point left side windows, turn on the light and the windows beside the point red arrow, right means 4, beside the point guns characters - fire stoning bridge provision five point cannons on the left angle of adjustment, curs point - six stone floor, point guns left angle adjustmen enter the name of the game

    游戲攻略: 1點擊蓋子,把蓋子打開2點右邊向上的黃箭頭,放1個小人出來3點左邊窗戶,把燈打開,並點窗戶旁邊的紅箭頭,使向右指4點大炮旁的小人,平射石頭把橋放倒5點大炮調整角度向左上,點小人射石頭撞鐘6點大炮調整角度向左,點小人射炸彈,注意掌握時間,炸彈到橋上方,迅速點橋將炸彈彈起爆炸。
  13. By setting up more than n after that monster killed, bt has the advantage of the game countless people ! raiders game : 1, click on the lid, open the lid 2, the right point upward yellow arrow, up a curs from three point left side windows, turn on the light and the windows beside the point red arrow, right means 4, beside the point guns characters - fire stoning bridge provision five point cannons on the left angle of adjustment, curs point - six stone floor, point guns left angle adjustmen

    游戲攻略: 1點擊蓋子,把蓋子打開2點右邊向上的黃箭頭,放1個小人出來3點左邊窗戶,把燈打開,並點窗戶旁邊的紅箭頭,使向右指4點大炮旁的小人,平射石頭把橋放倒5點大炮調整角度向左上,點小人射石頭撞鐘6點大炮調整角度向左,點小人射炸彈,注意掌握時間,炸彈到橋上方,迅速點橋將炸彈彈起爆炸。
  14. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管拱肋兩點整體吊裝的結構受力進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。
  15. This system consists of a full bridge pwm ( pulse width modulation ) regenerative rectifier or so - called vsc ( voltage source converter ) that connected to pcc ( point of common connection ) at the power utility grid through a passive interface circuitry

    這種系統包括一個pwm全橋可逆整流器或者所謂的電壓源變換器,通過無源電路介面與電網的pcc點(公共連接點)相連。
  16. The yuantong temple was set up the temple with the skill that build the park, the green mountain, bluish green water, colorful fish, white bridge, red station, zhuting, colorful gallery hands over to reflect mutually, landscape, such as painting, is one of the national point buddhism temples

    圓通寺以造園手法建寺,青山碧水彩魚白橋紅亭朱殿彩廊交相輝映,景色如畫,是全國重點佛教寺廟之一。
  17. Arch rib is the key point during the process of the long - span concrete - filled steel tube arch bridge construction

    主拱肋施工是大跨度鋼管混凝土拱橋施工的關鍵環節。
  18. From the view point of the whole topologies of current mode hfl inverters, two topologies of half - bridge and push - pull current mode hfl inverters are proposed, which are composed of four power switches. hfl inverters in discontinuous current mode ( dcm ) are extended to those in continuous current mode ( ccm )

    從完善電路拓撲和降低成本的角度出發,本文提出了兩種結構的電流源高頻鏈逆變電路,它們分別是由四個功率管組成的半橋和推挽雙向電流源高頻鏈單級逆變電路,並將工作在電感電流斷續模式的逆變電路擴展到電感電流連續模式。
  19. The rectangular hole he left was meant for this moment. that night, mao pointed out all the weakest point of qiantang river bridge with accuracy

    當晚,茅以升以一個橋梁工程學家嚴謹精準的態度,將錢塘江大橋所有的致命點一一標示出來。
  20. As the start point of the silk road, xi an has created magnificent achievement in the golden age of tang dynasty ; and today, as the largest chinese city on the eurasia bridge, it takes a strategic position connecting the east and west. in the great development of western china, as the bridgehead, it will play more important role

    西安作為絲綢之路的起點,在盛唐時期曾創造了昔日的輝煌如今,作為歐亞大陸橋上中國最大的城市,具有承東啟西,東連西進的戰略地位,在西部大開發的進程中,西安作為橋頭堡必將發揮更重要的作用。
分享友人