post flood 中文意思是什麼

post flood 解釋
灌后
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  1. The summer flood season was subdivided into main flood season and post - freshet season by many methods such as the mathematical statistics method and fuzzy analysis method. the flood control risk in spring was analyzed by the qualitative analysis

    本文根據洪水出現時間,將水庫的汛期分為春汛和夏汛,並採用成因分析、數理統計、模糊分析等方法又夏汛細分為主汛期和后汛期。
  2. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  3. ( 1 ) the principles and approaches are explored on the post - evaluation of water resources planning and projects. ( 2 ) the post - evaluation model of the adjusting and regulating planning of huai river middle courses for flood protection. based on the model, the economical evaluation and comprehensive evaluation are completed in the chapter 5

    一是探討水利規劃、水利工程項目后評價的原理、方法;二是建立淮干河道整治規劃后評價的模型,在此基礎上,對淮干中遊河道整治規劃及工程項目進行了經濟評價、綜合評價。
  4. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為潮流河段,徑流潮流的雙重作用使得區域水文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩定性分析,設計潮位的分析計算,洪潮組合方案擬定,工程前後對河道及水位流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  5. Application of fuzzy comprehensive evaluation method in post - flood control planning appraisal

    模糊綜合評判法在防洪規劃后評價中的應用
  6. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  7. Since the west part of zhuhai recently suffered from flood that happens once a hundred year, the municipal agriculture bureau sent there goods and materials worth 234, 000 yuan rmb for post - disaster reconstruction

    我市西部地區日前遭遇了超百年一遇的洪災,市農業局6日運送了23 . 4萬元的物資用於災后的重建。
  8. ( 4 ) analysis of item illustrate that, during the 19 influencing factors, the influences of post facilities maturity, atmosphere noise pollution condition, geologic and physiognomy condition, flood submerge condition and programming qualification have no difference in regions on business land price, the influence of green - belt park and geologic and physiognomy condition have no difference in regions on residence land price, the influence of rout net density and post facilities maturity have no difference in regions on industry land price

    項目分析說明, 19個影響宜賓市城區地價的因子中,郵政設施完備度,大氣噪聲污染狀況,地質地貌條件,洪水淹沒狀況,規劃條件這5個因子對商業用地地價的影響沒有區域差異;綠地公園影響度,地質地貌條件這2個因子對住宅用地地價的影響沒有區域差異;路網密度,郵政設施完備度、洪水淹沒狀況這3個因子對工業用地地價的影響沒有區域差異。
  9. Based on the facing situation in rural infrastructure construction after the reform of rural taxes and administrative charges, the chance and challange were analyzed ; the achievement and problems existing before and after the reform were pointed out ; the basic consideration on infrastructure construction in post - period of the reform of rural taxes and administrative changes were put formard, that is, taking a scientific concert in development, concerning with masses intervests, improving the facilitates of the rural traffic, information, education, energy, provision, drinking warter, flood control, disaster prevention through above analysis, the countermeasures to fasten the progress of rural infrastrueture construction were disccused in order to make a beneficial recycle between investment and profit in the rural infrastructive construction

    摘要針對農村稅改后農業基礎設施面臨的新形勢,詳細分析了機遇和挑戰;指出稅改前後農村基礎設施建設成果與存在問題;提出后稅費改革時期農村基礎設施建設的基本思路落實科學發展觀,堅持以人為本,改善農村交通、資訊、教育、能源、飲水、防洪和防災減災設施等;通過上述的分析,探討了加快農村基礎設施建設的對策建議,使基礎設施建設投人與收益進人良性循環階段。
分享友人