pouring temperature 中文意思是什麼

pouring temperature 解釋
澆鑄溫度
  • pouring : 澆鑄, 澆注
  • temperature : n. 1. 溫度,氣溫。2. 體溫。3. 〈口語〉發燒,高燒。
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。
  3. In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered

    計算中考慮了混凝土的絕熱溫升、彈性模量、徐變度和自生體積變形隨齡期的變化以及分層澆築、夏季停工、外界氣溫變化、表面保溫、通水冷卻及分期蓄水等因素對壩體溫度應力場的影響。
  4. The results show that the heat preservation coating and its proper thickness are favorable to the enhancement of filling mold speed of aluminium alloy ; the higher the pouring temperature is and the larger the ratio of hollow areas of vertical pouring is, the faster the speed of filling mold of aluminium alloy is ; if the mold is too thick or too thin, it may decrease the speed of filling mold ; the proper length and the area of vertical pouring are favorable to the enhancement of the speed of filling mold ; although negatire - pressure may improve filling the speed, too high negatire - pressure may enlarge the flaw in casting

    結果表明:保溫塗料及一定的塗層厚度有利於提高鋁液的充型速度;澆注溫度越高、直澆道空心面積率越大,鋁液充型速度越快;模樣厚度太厚或太薄,均會使鋁液充型速度降低;一定的直澆道長度及直澆道面積有利於提高鋁液的充型速度;施加負壓會使鋁液的充型速度大大提高,但負壓過大會增大鑄造缺陷。
  5. The influences of foundry process and method factors on combination effect was investigated including the influences of gating system design, pouring temperature, atmospheric pressure of mould cavity, thickness of cast - penetrated layer and so on

    作者就澆注系統、澆注溫度、型腔氣壓、鑄滲層厚度等工藝參數對鑄滲效果的影響進行了試驗研究。
  6. The effect of compound casting technology and compound modification on the properties of high speed steel roll collar was studied. the results showed that compound high speed steel roll collar with high and even hardness and good bond between outer and inner layers could be gained when the modified colbalt free high speed steel in outer layer and nodular iron inner layer in connection with appropriate rotational speed of centrifugal machine, pertinent pouring interval between two kinds of the melt and moderate pouring temperature as well as surface induction heat treatment were chosen. it is indicated in industrial use that the service life of compound roll collar is higher by 5 times than that of high chromium cast iron collar

    研究了離心復合鑄造工藝和復合變質處理對高速鋼輥環性能的影響,結果表明,選用變質高碳無鈷高速鋼作外層,用球鐵作內層,選擇合適的離心機轉速、兩種金屬熔液澆注間隔時間和澆注溫度,結合採用表面感應熱處理工藝,可獲得硬度高、均勻性好、內外層結合良好的高速鋼復合輥環,用於工業生產其使用壽命比高鉻鑄鐵輥環提高5倍以上。
  7. The change of adiabatic temperature rise along with age and the effect on temperature field of dam body made by pouring lift by lift, work suspension in summer and water storage are considered in the analysis

    分析中考慮了混凝土的絕熱溫升隨齡期的變化和分層澆築、夏季停工及蓄水對壩體溫度場的影響。
  8. So when the temperature is way up, and the sweat is pouring down, what do americans reach for to quench their thirsts

    那麼當溫度一路飆升,汗如雨下之時,美國人喝什麼來澆滅喉中之火呢?
  9. Pouring temperature is the dominating factor for the properties of compositing layers

    澆注溫度是影響鑄滲表面復合層質量的最主要因素。
  10. The effective cost dust content of molding sand should be determined according to time factors such as the quality of the coal dust, casting size and thickness, pouring temperature, lacing sand or unit sand, and so on

    決定型砂中的有效煤粉含量應根據煤粉質量的優劣、鑄件大小和厚薄,澆注溫度、面砂或單一砂等因素。
  11. Based on the mechanism of hot cracking formation of castings, the cracking defects of furnace door frame castings was analyzed, and found that the main reasons causing cracking are as follows : construction of the casting was not reasonable, gating system was not proper, and pouring temperature was too high

    摘要根據鑄件產生熱裂紋的機理,對爐門框裂紋缺陷進行分析,找到了裂紋產生的主要原因是鑄件結構和澆注系統不合理,以及澆注溫度過高。
  12. Liquid - solid extrusion of composite material is a new kind of metal forming process, which has been developed in recent years with a promising practical application prospect for its simple working procedure, low cost and good workpiece performance. through a lot of experiments, the optimization and chosing method of key process parameters ( pouring temperature, mold warm - up temperature, impregnating pressure, impregnating time ) has been mastered. under the precondition of appropriate chosing these parameters, the effective control of extrusion velocity is the key of mading good workpiece. but the control of extrusion velocity remains a handwork, and it is heavily affected by such uncertainties as a handler ' s knowledge and skill about the process. in order to solve the problem, the automatic control of the extrusion velocity is studied, and a computer control system is also designed under existing condition

    通過大量實驗,已掌握了關鍵工藝參數(熔液澆注溫度、擠壓模預熱溫度、浸漬時間、浸漬力)的優化選取方法。在合理選取關鍵工藝參數的前提下,擠壓速度的控制是成形出質量良好製件的關鍵。但是,目前對于擠壓速度的控制仍停留在手動控制階段,利用該工藝制備管、棒材製件的成功與否受操作者對該工藝及其設備的經驗及熟練程度等不確定因素影響很大。
  13. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    催化裂化裝置中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧化碳余熱鍋爐的內襯,也適用於軋鋼加熱爐、各種煅造爐、電阻爐的爐頂、爐墻、爐底高溫部位的現場澆注,可製成預制構件。
  14. In order to simulate the construction process and the effect of concrete pouring temperature and outside temperature on temperature field and thermal stress field in the dam, temperature field and thermal stress field are calculated layer by layer. the calculation step during construction is 0. 25 day, and during operation the diffusion of hydration heat of concrete is over and elastic modulus is basically stable, changeable step is used

    為了研究施工進度、混凝土澆築溫度、外界溫度對壩體溫度場和應力場的影響,按碾壓混凝土施工方法每澆築一層(層厚0 . 3m ,澆築時間6小時)計算一次溫度場和應力場,這樣,施工期計算步長為0 . 25天,運行期因混凝土水化發熱已結束,且彈模基本穩定,故採用變步長計算。
  15. The alloy component and the process parameters of the precision casting ( including the exit temperature from furnace, pouring temperature, mould preheating temperature, holding time, cooling form ) have a certain influence on the problem of the blade brittles

    摘要合金含量、精鑄工藝參數(出爐溫度、澆鑄溫度、模殼預熱溫度、保溫時間、冷卻方式)對葉片脆性問題存在一定的影響。
  16. Examine the warm triangular awl composition and adopt mineral raw materials to compound, its physics performance and ceramic glaze medicine are self - same, utilize fire - resistant degree of it as melt temperature of pouring, in cooking, set according to the operation instructions free in examined warmly position in products, can examine to the actual temperature of the products ( can be observed with the naked eye ), especially push away and pull the kiln, tunnel kiln, drawer kiln observe temperature must spend products, general difference in temperature 5 - 10 degrees centigrade, please and soften some forms of contrasting according to the operation instructions, serial number before using

    測溫三角錐成分採用礦物原料配製的,它的物理性能與陶瓷釉藥完全相同,利用它的耐火度作為熔倒溫度,在產品燒成中,按使用說明放在所測溫的位置,可測到產品的實際溫度(用肉眼可觀察到) ,尤其是推扳窯、隧道窯,抽屜窯內觀察溫度必用產品,一般溫差5 10 ,使用前請按使用說明、編號及軟化點對照表。
  17. Transient temperature field comes from changes of boundary conditions and the heat which is produced by the concrete chemical reactions with the water during the mass concrete pouring

    由於混凝土澆灌時產生的水化熱和澆築過程中熱邊界條件變化而產生瞬態溫度場,這種溫度場對結構施加時變溫度載荷。
  18. This project is sponsored by the limited liability electric implement company of heifei sanyang rongshlda. it will be used to adapt to the product line to product the newtppe microwave oven, to pour glues for the around of the micro wave oven ’ s lumen and panel the paper introduce the hardware composing and the designing of this system, introduce this system ’ s work principle of the route about gas and glues, the principle of the measuring, the measuring principle of the glues ’ location and the temperature analyse the selection foundation of the step by step electric machine key words : the automatic mixing pouring machine of the two different glues, step by step electric machine, singlechip, miero - wave oven

    本課題來源於合肥榮事達三洋電器有限責任公司,是為了適應即將投入生產的新型微波爐的生產線,實現對微波爐的內腔和面板四周自動灌膠的產品研發項目。本論文介紹了全自動二維灌膠系統的硬體組成及軟體設計,介紹了本系統的氣路、液路工作原理、計量原理、液位及溫度檢測原理,分析了步進電機選擇的依據,步進電機運動的控制及加減速運動規律。
  19. This article incorporates with the practice for construction of mass concrete foundation structure of handan big world department store, according to the features in foundation structure design and the conditions of winter construction in this region, introduces micro - expansion concrete mix proportion design, pouring technology for mass concrete structure, the solution of the strengthen joint - strip and post - pouring joint strip in concrete foundation work, and temperature control for mass concrete

    結合大世界商城底板大體積混凝土的施工實例,針對基礎結構的設計特點和當地冬季施工的氣候條件,介紹了補償性混凝土配合比設計、大體積混凝土澆築工藝、基礎混凝土加強帶和后澆帶施工工藝、底板混凝土溫度控制和自動化監測等多項綜合性技術。
  20. A transverse secondary circulation is produced by the coupling of high and low jets, while the sinking branch of the secondary circulation providing the dynamic conditions for the dry intrusion air. during the period of the heavy rain process, dry intrusion descends southward along the intense constant potential temperature lines, which promotes the lower cyclone. in addition, the pouring of upper - level dry air not only decreases ground temperature behind the front but also increases surface pressure and velocity

    由於高、低空急流耦合,在高空急流中心左側產生的下沉運動和高空急流中心右側、低空急流左側產生的上升運動在鋒面上形成一次級環流,次級環流的下沉支運動為對流層高層干空氣和高位渦的下傳提供了動力條件;進一步研究發現,干侵入沿相當位溫密集帶向南向下伸展,引起對流層低層氣旋性渦度的發展;此外,高層乾冷空氣向下注入,導致地面溫度降低、氣壓升高、風速加大、低層輻合增強、上升速度加大,從而促進了新的對流運動,引起降水增強。
分享友人