power dam 中文意思是什麼

power dam 解釋
發電站攔水壩
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  3. Abb china chairman and president peter leupp announced yesterday the company has won contracts worth around us 60 million to supply a large 500 kv gas - insulated switchgear and 12 sets of power transformers for the right - bank power plant of the three gorges dam project

    這次客車企業能首先榮膺汽車行業的「中國名牌」 ,也是和客車企業長期以來特別重視品牌建設,打造名牌意識強烈分不開的。他們中的很多企業甚至已經喊出了要爭國際名牌的聲音。
  4. At same time, the war department began construction at this site of the gigantic wilson dam to provide electric power for the nitrate plants.

    同時陸軍部開始在這個地方建設巨大的威爾遜水壩,為硝酸鹽工廠提供電力。
  5. A dam constructed across a stream to raise the water level so that the overflow will have sufficient power to turn a mill wheel

    磨坊水壩橫跨溪流建造的堤壩,以提高水位使溢滿的水有足夠的動力轉動磨坊的水輪
  6. On blasting excavation of power house dam section of jinghong power station

    景洪水電站廠房壩段開挖爆破
  7. From the site explorations, tentative sketches can be made of the dam location and project features such as power plants.

    通過壩址查勘,就能繪制壩的位置和工程附屬建築物如發電廠方的示意圖。
  8. During the first world war, the government had constructed a dam on the tennessee river to provide power for wartime nitrate production.

    第一次世界大戰期間,政府在田納西河上建立了水壩,為戰時所需硝酸鹽的生產提供電力。
  9. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  10. Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test

    溪洛渡水電站壩基固結灌漿試驗檢測
  11. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石壩填築施工設計
  12. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基深厚砂卵石覆蓋層鉆探取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質鉆探對取芯質量的要求。
  13. This thought and method of studying dam foundation rock mass quality can be extended to other water - power projects

    這種研究壩基巖體質量的思路、方法可以推廣到其它水電工程。
  14. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  15. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  16. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  17. A water power station must have a dam

    水電站必須有攔河壩。
  18. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  19. Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant

    大朝山水電站進水口壩段壩基防滲帷幕灌漿施工
  20. The conditions have reduced water levels in the yangtze river to historic lows and raised concerns over the massive three gorges dam ' s ability to generate power, state media reported last week

    官方媒體上周表示,惡劣的情況使得長江的水位下降到歷史最低點,三峽大壩的發電問題也備受關注。
分享友人