power intake 中文意思是什麼

power intake 解釋
消耗功率
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • intake : n 1 吸入,納入,收納。2 進水口 (opp outlet); 輸入端,(礦井的)進風巷道,通風孔。3 吸氣,進氣。...
  1. The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness

    摘要進行了潮汐彎道段電廠取排水模型試驗,採用w形波紋凹槽方式加糙,使模型糙率達到了模型試驗的要求。
  2. The installation is fairly simple and requires unbolting and removing the intake connectors, installing a longer alternator belt that will now also power the supercharger and reconnecting all the vacuum hoses

    安裝公正簡單和需要打開和除去的吸入連接器,安裝現下將也為增壓器提供動力的一條更長的交流發電機帶和再接通全部真空軟管。
  3. Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant

    大朝山水電站進水口壩段壩基防滲帷幕灌漿施工
  4. The results derived from comparison experiments indicate that various performances of the diesel engine adopting the best project is better than those of the previous intake manifold. especially at the rating, the volumetric efficiency and power increases by about 5 %, exhaust temperature decreases by 50, 4. 3g / kw. h fuel consumption is reduced, o. srb smoke emission is cut down

    試驗表明:該方案與原機進氣系統方案相比,其各項性能指標均有不同程度的改進:在標定點的充量系數和功率提高了將近5 ,排溫下降了50 [ ] ,燃油消耗率減少了4 . 3 [ g kw
  5. The optimal layout scheme and design scale of the plant site are determined through the analysis and evaluation of the capacity of flood control and flood discharge of the watercourse nearby the pump house of zhongning electric power plant. this will provide use for reference for the similar water - intake engineering in the future. it has great significance for theoretical research and practicable value for application as well

    本課題通過對中寧發電廠取水泵房廠址附近河道的防洪及河道行洪能力的分析和評價來確定其廠址的最優布設方案和設計規模,對今後類似的黃河上取水泵房的設計提供借鑒,因此具有重要理論研究意義和實際應用價值。
  6. Norm of water intake - part 1 : electric power production

    取水定額第1部分:火力發電
  7. This reduces the loading of chiller and minimises the power consumption of fresh air intake fan. it is estimated that the system can cut the electricity bill by $ 161, 000 per year

    這可以減低製冷機的負荷以及鮮風風扇的電力消耗,估計這系統可令電費每年減少
  8. Experiment study on hydraulic model of the water intake in ash depot of thermal power plant

    火電廠貯灰場排洪壩進水口模型試驗研究
  9. Distortion monitoring on intake of underground power station at the right bank in tgp

    三峽工程右岸地下電站進水口施工期變形監測及特徵
  10. The dcs applications in raw water intake, chlorination and chemical dosage, filtration station, output pumping house, power switching house and main control room are specially described in detail under different conditions of waterworks

    並根據水廠生產的工藝過程,著重介紹了集散控制系統在原水取水、加藥加氯、濾池、配電、出水泵房和水廠控制室中各種不同場合的應用情況。
  11. The main facilities include intake well, tsaoshanpipebridge, connecting shaft and aeration room, tienmu pipeline, sanjiaopu power plant, yuanshanbasin. it is now classified as the historical site of the city

    主要設施包括取水井草山水管橋連絡井與氣曝室天母水管路三角埔發電所活水頭圓山貯水池等,已劃定為市級古跡。
  12. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  13. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. The suck - wind machine need to intake a lot of wind in the synthesis ammonia section transform furnace, the quantity is at l 00000nm ' / h, so the diameter of the wheel is about 1 meter. the motor driving it need higher power for meeting the startup torque

    負壓運行爐的引風機要求吸風量大,一般都在100000nm 』 i以上,因此風機輪毅直徑設計的都較大,大都在1米以上,這樣為了克服風機的大啟動力矩,風機所配置的拖動電機功率也非常大。
  15. Study on the sediment accumulation in the intake port basin of a power plant

    電廠港池取水工程泥沙回淤研究
  16. With its pull - back motor, big engine intake, flame details and huge tires, off road power ' s name says it all

    它的回力功能,超強力引擎,火力能量和巨型輪胎都說明了我們叫她越野車也不為過。
  17. Anchorage cable construction on intake side slope and quality control in sanxia underground power station

    三峽地下電站進水口邊坡錨索施工及質量控制
  18. There are some disadvantages in the processing of the materials for the insulation of high voltage power cable in china such as the process equipments are complicate, which need more energy and the process flow is long and so on, we need to intake that vast scale from foreign enterprises yet. in order to change the present status, this paper has successfully developed the materials with new process equipments and new process flow, which are made with compounds containing universal resins of china and assistants such as peroxide, antioxidant and so on

    為了改變國內高壓電力電纜絕緣料尚需大量進口和國內研製的高壓電力電纜絕緣料存在加工設備繁雜、能耗大和工藝流程長等不足的現狀,本論文採用國產通用樹脂,加入交聯劑、抗氧劑、加工助劑等,通過物理預混和熔融共混的方法,用國產設備特定的組合和特定的生產工藝,成功開發了可交聯ldpe高壓電力電纜絕緣料。
  19. Fuel efficiency and power output and emission of an internal combustion engine can be significantly improved by optimizing intake and exhaust valve timing and duration and lift as speed changes during operation

    改變發動機氣門的開啟相位、持續時間和升程是改善發動機性能,提高熱效率和減少有害排放的一種重要方法。
分享友人