power station in cascade 中文意思是什麼

power station in cascade 解釋
梯級水電站
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • cascade : n 1 (陡巖落下的)瀑布;【園藝】人工瀑布。2 瀑布狀物;波形花邊。3 【物理學】級;級聯,串聯;【無...
  1. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃河上游梯級運行特點,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工渡汛影響。
  2. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  3. The four diversion tunnels of jinping cascade 2 hydroelectric power station is 16. 625 km long averagely and 2525m deep in maximal bury - depth. in the construction region the maximum of principal geostress reached 54mpa

    錦屏二級水電站四條引水隧洞平均長度16 . 625km ,最大埋深達2525m左右,洞線高程處地應力最大主應力值達54mpa ,工程區屬高地應力區。