process crane 中文意思是什麼

process crane 解釋
生產程序用起重機
  • process : n 1 進行,經過;過程,歷程;作用。 2 處置,方法,步驟;加工處理,工藝程序,工序;製作法。3 【攝影...
  • crane : n 克蘭〈姓氏〉。n 1 鶴;〈口語〉蒼鷺,鷺鷥,鸛;〈C 〉【天文學】天鶴座。2 起重機,吊車,攝影升降...
  1. Design philosophy of hardware and software is established. the paper bases control algorithm of operator and control program diagram on thorough investigation into truck crane operation reliability action flow, which makes sure of accurate and effective control over handle and accelerograph and achieves test process automatization

    文章在深入研究汽車起重機作業可靠性試驗動作流程的基礎上確定了對執行機構的控制演算法,並給出控製程序框圖,準確有效地實現了對操縱手柄及油門的控制,達到試驗過程自動控制的目的。
  2. The manufacturing process of one beam bridge crane

    單梁橋式起重機的製造工藝
  3. Lifts the organization through the establishment container hoist crane and the car walks the organization mathematical model, bused on the optimum control in minimum value principle, studies the container hoist crane in loading and unloading process optimum control, causes its loading and unloading time to be shortest, the efficiency is highest

    摘要通過建立集裝箱起重機起升機構和小車行走機構的數學模型,基於最優控制中的最小值原理,研究集裝箱起重機在裝卸過程中的最優控制,以使其裝卸時間最短,效率最高。
  4. The manual introduced the total design and compute the process detailedly about the general design and the running gear design, which divided into altogether three chapter : chapter 1 for total design part of this crane, the main contents is each organization of crane and the metals structure patterns to really settle, and carry on the design to a structure of jib arm and counterbalance system by graphing method, including seeking the point, checking to calculate and school pit ; the second part is a design calculation that circulates the organization, including to circulate the organization to choose the type, the round presses calculation, the stability checking of the whole machine ; the third part is to choose the driving motion version of the hoisting mechanism

    說明書詳細的介紹了該型號起重機的總體設計及行走機構設計和計算過程,總共分為三章:第一章為起重機總體設計部分,主要內容是起重機各機構和金屬結構型式的確定,並用作圖法對臂架結構和平衡系統進行設計,包括了機構找點,驗算及校核;第二部分是運行機構的設計計算,包括了運行機構的選型,輪壓計算,整機穩定性校核;第三部分為起升機構的傳動方案選型和設計計算。
  5. This paper analyses the engineering feasibility of using the static fem in the fatigue strength design of the shipunloaders structure through discussing the difference of infinite fatigue life design and finite fatigue life design and puts forward the calculating work cycle of this structure after considering the shipunloaders work process. it is useful for crane design - engineer to introduce the general fatigue strength design processes of the shipunloaders

    分析了有限壽命疲勞設計和無限疲勞壽命設計的異同,研究了用靜力學的有限元法進行結構的疲勞強度設計的技術可行性問題;並結合裝卸橋的工作過程,提出了相應的計算工作循環;介紹了裝卸橋疲勞設計的一般步驟
  6. Statistic analysis on fatigue load effect and equivalent stress range of steel crane structures in service is carried out. the stress range distribution in whole life is deduced by the spot measurement little sample stress - time process. meanwhile the statistic analysis on the fatigue resistance process is conducted, according to fatigue data of all kinds of structural joints in domestic and overseas, which is foundation with, establish the fatigue reliability model

    2 、在大量調查的基礎上,對吊車梁所承受的疲勞荷載效應與等效等幅應力進行了統計分析,同時根據國內外有關各構造細節的疲勞資料對疲勞抗力參數進行了統計分析,為建立疲勞動態可靠性分析模式奠定基礎。
  7. 3. the crane load and fatigue strength are regarded as stochastic process, the fatigue dynamic reliability based on limit stress model and fatigue dynamic reliability based on accumulation damage model are established on the base of statistic analysis the fatigue load and resistance

    3 、在對疲勞荷載與抗力統計分析的基礎上,視吊車荷載與疲勞強度為隨機過程,建立了基於極限應力模式的疲勞動態可靠性分析模型及基於累積損傷模型的疲勞動態可靠性分析模型。
  8. Heavy duty compressors and pelleters in process services shall be installed in the building with a mobile crane or monorail traveling the full length of the house

    工藝(環境)中的重型壓縮機及造料機應安裝在室內,室內應裝有移動式吊車或單軌吊車(行程為房間的全長) 。
  9. A crane - vehicle scheduling model is suggested in a loading container process with a fleet of vehicles, several yard - cranes and a quay - crane

    摘要針對集卡、堆場起吊設備和岸橋設備在集裝箱船舶裝卸作業時的規劃問題提出了一個起吊設備車輛的規劃模型。
  10. The gpd3402 inverter and plc being selected to set up open - loop and closed - loop speed regulation systems, applying the invariable v / f control, sensorless vector control, slip compensation, process pi and network control technologies control the hoist motor of the stacker crane

    本文基於gpd3402變頻器的變頻調速方式進行應用開發,對堆跺機提升電機採用變頻調速控制,採用gpd3402變頻器及plc ,組建開環調速系統,分別應用恆壓頻比、無速度傳感器、矢量控制、轉差補償控制技術。
  11. Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping, pipe support, etc. ) & liner and rock bed, complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane

    第六步:待襯管內所有的安裝工作(包括工藝配管、管道支架等)及襯管與巖床間的灌漿、養護工作完成後,用35 / 50噸液壓起重機和25噸汽車起重機完成襯管頂部封頭的安裝工作。
  12. Discuss the dc adjust voltage and timing system simulator process and way of the container crane, which containing the dc motor drive and drivers " select, drivers connection and control

    ?集裝箱裝卸橋直流調壓調速系統模擬過程及方法,其中包括直流電機傳動及驅動器選擇、驅動器接線與控制。
  13. Discuss the ac frequency conversion timing system simulator process and way of the container crane, containing the ac frequency conversion motor drive and drivers " select, drivers " connection and control

    ?集裝箱裝卸橋交流變頻調速系統模擬過程及方法,其中包括交流變頻電機傳動及驅動器選擇、驅動器接線與控制。
  14. Thanks to its light weight, itsave time, manpower and equipment during the installation process. itean be erected by a crew of only twoor three people without need for crane or hoist, greatly reducing traffic diversion and resultant costs

    因桿身質輕,安裝過程中省時、省力、省設備,只需兩、三個人就可以使燈桿豎起來,不需要吊車或起重機安裝費用低,對交通影響小。
  15. The moving process of a certain single mast stack - crane was simulated and analyzed with multi - body system method

    摘要以某型號單立柱有軌巷道式堆垛機作為研究對象,運用多體系統方法對其運行過程進行模擬分析。
  16. To know the process of folding paper, and know how to fold a paper crane

    使學生了解折紙鶴的步驟,掌握折紙鶴的製作。
  17. It analyzes the process of urgent braking of truck crane applying concept and principle of work - energy transformation, and gives calculating methods and formulas for the braking distance on three different roads including level and up / down slope roads and makes a list of calculating results for analysis

    摘要運用功能轉換概念和原理,分析了汽車起重機緊急制動過程,提出了汽車起重機在平路、上坡、下坡等3種情況下制動距離的計算方法和公式,並將計算結果列表分析。
  18. We analyzed the design theory of dam of bridge crane and design technology of dam of bridge crane, and revised mathematical model and experience formula which are used in the process of the design of bridge crane dam. with the foundation of object - oriented program method, we adopt the graphical program tools and program the dam of bridge crane computer aided optimization design software. this software has friendly man - machine interface, can achieve optimal lift system with the fundamental arguments of bridge crane dam. and can output this optimal designed result to a text document which engineering staff can be referred to

    本課題通過對起重機小車設計理論構成和設計方法的分析,結合計算機輔助設計技術的基本設計理論和工程技術人員的實際生產經驗,對以往起重機小車設計過程中所使用的數學模型、經驗公式等進行了修正,以面向對象的程序設計方法為基礎,採用可視化編程工具visualc + + + 6 . 0編寫了起重機小車計算機輔助優化設計軟體系統。
分享友人