鬍子工程
  • prolonged : 長時期的
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. He thought of the efforts he had made, and the people he had tried to see, and the history of his project of army reform, which had been accepted for consideration, and had been shelved because another scheme, a very poor one, had already been worked out and presented to the tsar. he thought of the sittings of the committee, of which berg was a member. he thought of the conscientious and prolonged deliberations that took place at those sittings on every point relating to the formalities of the sittings themselves, and the studious brevity with which anything relating to the reality of their duties was touched on in passing

    他回憶起他東奔西走,阿諛奉承,回憶起他草擬軍事條令的經過,這份草案業已備查,但是人人避而不談,唯一的原因是,另一份極為拙劣的草案亦已擬就,並且呈送回去了他回想起貝格擔任委員的那個委員會的幾次會議在這幾次會議上人們長時間地認真地討論涉及委員會會議的形式和程序的各種問題,而對涉及問題實質的一切事情卻很簡略地加以討論,馬虎地應付過去。
  2. Furthermore tunnel structure commonly is designed by analogy method. on design, often, normally in view of safe consideration, adopt the method that reduction surrounds rock classification and uses fussy construction technology. so as soon as coming, engineering investment is certainly increased and construction project time is prolonged

    且隧道結構一般按類比法設計,出於安全考慮,設計上一般採用降低圍巖類別,使用復雜的施工工藝來提高施工的安全性,這樣無形中增加了工程投資費用且延長了施工工期。
  3. A detailed project list is at annex. the main reasons for delay are prolonged tendering process, prolonged system evaluation, late delivery of productsservices, changes in business requirements and organisational changes

    引致延誤的主要原因包括投標和評估系統所需的時間較預期為長,貨品或服務延遲交付,業務需求有變,以及組織架構更改等問題。
  4. The rolled products project experienced some initial delay owing to adverse weather conditions and prolonged negotiations over some design and engineering contracts

    鋁軋制產品項目開展初期,由於天氣狀況欠佳,加上在設計及工程合約上的洽商出現了延誤,故施工期早段有所延誤。
  5. Due to adverse weather conditions and prolonged negotiation of some design and engineering contracts, construction work on the project has been delayed by about seven to eight months

    由於天氣狀況欠佳,加上部份設計及工程合約在洽商上有所延誤,建廠項目的進度將延遲約七至八個月。