pump turbine 中文意思是什麼

pump turbine 解釋
水泵水輪機
  • pump : PUMP =politically upwardly mobile personality 政治新星,政治上有望晉升人士。n (淺口無帶的)輕舞...
  • turbine : n 【機械工程】(渦)輪機,葉輪機,汽輪機,透平機。 a hydraulic [water] turbine 水輪機。 a steam t...
  1. The system optimization and heat economic analysis for feed pump steam turbine

    機組給水泵小汽輪機系統的改造及其熱經濟性比較
  2. Turbine driven feed pump

    汽輪給水泵
  3. Among the designs left by leonardo da vinci almost 500 years ago ? with notes written backward to be read with a mirror ? were the parachute , life jacket , water pump , swim fins , well digger , paddle - wheel boat , horseless carriage , sprocketchain , steam gun , water turbine , lens - grinding0 machine , shrapnel , machine gun , airplane , helicopter , submarine , and mass production

    近500年前列奧納多?達?芬奇留下的許多設計稿? ?即須通過鏡子才能讀懂的反著寫的筆記,其中有降落傘、救生衣、水泵、游泳腳蹼、鉆井機、明輪機、無馬馬車、扣齒鏈、蒸汽槍、水輪機、磨鏡片機、子母彈、機關槍、飛機、直升飛機、潛水艇和成批生產的設計。
  4. Turbine driven cargo oil pump lubricating oil tank

    汽輪貨汪泵潤滑油櫃
  5. Analysis of the economy on the water feeding pump steam turbine under variable working conditions

    變工況下給水泵汽輪機經濟性分析研究
  6. Combined with practice of rotation - impulsing for steam - driven feed - water pump by using standby steam source in yahe - kou power - generation co ltd, the feasibility and economic behavior of rotation - impulsing for steam - driven feed - water pump, and warming turbine and pump up in advance by using standby steam source to shorten cold - state start - up time, and to save start - up expenses, have been analysed

    摘要結合鴨河口發電公司採用汽動給水泵備用汽源沖轉的實踐,分析了汽動給水泵採用備用汽源沖轉,提前進行暖機、暖泵,縮短冷態起動時間、節約起動費用的可行性和經濟性。
  7. Understand maintenance procedure of compressor, pump, blower, turbine, tower and heat exchanger etc, and prepare lifting plan accordingly and direct big scale equipment

    了解壓縮機、泵、風機、汽輪機、塔、換熱器檢維修工作程序,根據檢修要求制訂起重吊裝方案並能夠指揮吊裝大型設備。
  8. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型抽水蓄能機組、大型貫流式機組、大功率超臨界火電機組、大型空冷汽輪發電機、大型循環硫化床鍋爐、大功率核電站汽輪機和發電機、核島設備壓力殼、高壓蒸發器和主泵等核電一級設備。
  9. Methods for model tests of hydraulic turbine and reversible pump - turbine

    水輪機及雙向泵水渦輪的模型試驗方法
  10. Water - turbine pump - part 3 : types and basic parameters

    水輪泵第3部分:型式與基本參數
  11. Development of model xbc fire - fighting turbine pump

    型消防水輪泵的研製
  12. Types and basic parameters of water - turbine pump

    水輪泵型式與基本參數
  13. Technical specifications for water - turbine pump

    水輪泵.技術條件
  14. Water - turbine pump - part 2 : test methods

    水輪泵第2部分:試驗方法
  15. Water - turbine pump - part 1 : vocabulary

    水輪泵第1部分:詞匯
  16. Testing methods of water - turbine pump

    水輪泵試驗方法
  17. Fracture analysis on rotor vanes of a turbine pump working as hydraulic power source

    伺服機構渦輪泵轉子葉片斷裂失效分析
  18. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽水蓄能電站的水泵運行時,不同負荷工況下停機、導葉和轉輪間壓力的變化,闡述了華東桐柏抽水蓄能電站1號機組發電機斷路器開斷的最佳負荷值選定。
  19. Electrotechnical terminology. hydraulic turbine, storage pump and pump - turbine

    電工術語水輪機蓄能泵和水泵水輪機
  20. The model of studying the reservoir deposition is one - dimension and two - dimension embedded mathematical model, which is a one dimensional model study the whole reservoir and the two dimensional model study some important parts of the reservoir by utilizing the one - dimensional model output data. for pushihe lower reservoir, one - dimensional model studies the whole reservoir, and the two - dimensional model study the part of reservoir of 4. 5km in length near the intake of the pump - turbine, to study the layout of the deposition and the and concentration of the suspended load near the intake

    在一維數學模型計算中考慮了兩種一、二期工程的銜接方案,每種銜接方案又分別計算了五種降低水位運行的方案,即保持全年庫水位不變、保持汛期庫水位不變、和在洪水來臨時把庫水位降到65 、 64 、 63 、 62米等;每種方案又比較了兩種起調流量( 1000和500m ~ 3 s ) ,總共進行了20個方案的比較計算。
分享友人