railway 中文意思是什麼

音標 ['reilwei]
railway 解釋
n. 名詞 1. 〈英國〉鐵路;鐵路系統,鐵道部門。
2. 〈美國〉(市內)輕軌(鐵路)。
vi. 不及物動詞 〈英國〉坐火車旅行。
vt. 及物動詞 在…鋪設鐵路。

  1. Abutment design passenger dedicated railway line

    客運專線鐵路橋臺設計
  2. Every quarter of an hour the railway brought fresh accessions of sightseers.

    坦帕鐵路每隔一刻鐘載來一批看熱鬧的群眾。
  3. Railway rolling stock. electric accumulator frame

    鐵路車輛.蓄電池機架
  4. In foretime, the adscription of area before railway stations is somewhat vague, as it locates on the joints of railway department and the local government, it makes this area a vague one in administration

    過去,車站站前的歸屬比較模糊,處于鐵路與地方政府管理范圍的交界區域,從而造成了管理上的模糊地帶。
  5. Elevated railway, overhead railway, aerial railway

    高架鐵路
  6. The material is transferred by means of aerial railway or gorund guiding trolley from freezing to freezing drying and till unloading, assuring the sanitation and safety

    採用空中軌道傳輸方式或地面推導車,從冷凍至冷凍乾燥直至卸料,即衛生又安全。
  7. However, up to today with the development of social industrialization, especially the advance of building and building technology, the successive appearance of land three - dimensional usage such as high building, overhead railway, underground railway, air corridor, underground market, the wire of high voltage and last sewer etc., at the same time, many problems produced by the ownership and the usage of land space also have been put forward

    土地所有權的行使及於土地的上下,土地所有權的效力「上達天宇,下及地心」 。然而,時至今日,隨著社會工業化的發展,特別是現代化土木、建築技術的進步,高樓大廈、高架鐵路、地下鐵道、空中走廊、地下商場、高壓電線、上下水道等土地立體化利用情形陸續出現,同時,因對土地空間所有和利用所產生的諸多問題也開始被提出。
  8. Railway rolling stock. air pipes. coupling head for 25 mm main brake pipe

    鐵路車輛.空氣導管.毫米主制動裝置導管的管接頭
  9. Railway transport equipment. air brake and air pipes. 25 mm half - couplings

    鐵路運輸設備.空氣制動裝置和空氣導管.毫米離合器
  10. Railway transport equipment. air brake and air pipes. flexible hoses for 25 mm pipes

    鐵路運輸設備.空氣制動裝置和空氣導管.直徑為毫米的管道用軟管
  11. Railway transport equipment. air brake and air pipes. 25 mm brake - hose connecting nipple

    鐵路運輸設備.空氣制動裝置和空氣導管. 25毫米制動軟管連接管頭
  12. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。
  13. Based on the game theory and the main theories of information economics, the relationship between the appointer and the agent in railway property operation was studies ; the relationship between the state and the ministry of railways, and between the ministry of railways and the enterprise was analyzed ; and the method of how to decide the base number under either stable and random circumstances in the commission operation of railway property was studied ; and both the agent ' s interests mechanism in property operation and how to fix the optimizing contract and the optimal strategy under random circumstances were studies also

    本文以博奕論和信息經濟學中的主要結論為基礎,對鐵路資產經營中委託人和代理人之間的關系進行了研究,然後對國家與鐵道部、鐵道部與企業進行了資產經營的博奕分析;分別在穩定和隨機環境下對鐵路資產委託代理經營中基數的確定辦法進行了研究;並對資產經營中代理人(承包人)的利益機制和隨機環境下最優合同與最優策略的確定進行了分析。
  14. In the next place, comparing each appraisable method, and combining the practical instance of railway acceleration, the thesis finally selects fuzzy synthesis evaluating method that could be much more compatible. besides on the basis of inheriting the outcome of former research, the thesis mainly study and summarize a mistiness system. make it the basic mind and method

    其次,通過對各種評價方法的比較,並結合鐵路提速這樣一個模糊系統的實際情況,本文選用了更為合適的模糊綜合評價法。並且,在繼承學界前輩科研成果的基礎上,本文重點研究並總結了對於一個模糊系統,評價其社會效益的基本思路和方法。
  15. The united states sent 4600 railway personnel to india in 1943, to bring order to the british colonial railroad system between calcutta and assam

    美國於1943年向印度派遣了4600名鐵路人員,以改善加爾各答與阿薩姆之間英國的殖民鐵路系統的管理秩序。
  16. Six foundation works : first, projects to prevent flood, avoiding huai river overflow again ; second, projects of comprehensive traffic, perfecting the highway, railway, waterway and aviating traffic network ; third, ecological environmental protection project to improve peoples living conditions and strengthen environmental ecological construction progressively ; fourth, construction of " digital fuyang ", realizing datamation of product design, automation of production process, and electronization of commercial market ; fifth, sincere project of fuyang, advancing all kinds of sincere institutional improvement of same trade, forming morals based on sincerity, and personal integrity ; sixth, talents market project, developing human resources diversely

    六項基礎工程:一是防洪保安工程,切實根除淮河心腹之患;二是綜合交通工程,完善公、鐵、水、空綜合交通網路;三是生態環保工程,改善人居生活條件,加強環境生態建設;四是數字阜陽工程, .逐步實現產品設計數據化、生產過程自動化、營銷商務電子化;五是誠信阜陽工程,推進各類同業誠信制度建設,形成誠信為本、操守為重的社會風尚;六是人才強市工程,多方位開發人力資源。
  17. Axles for railway cars - types and basic dimensions

    鐵道車輛用車軸型式與基本尺寸
  18. Axles for railway rolling stock - dimensional requirements

    鐵道車輛軸.尺寸要求
  19. There the railway forks to a and b ( places ).

    這條鐵路在那兒分叉通向甲乙兩地。
  20. Railway fixed equipment. prefabricated barbican ditch elements, in reinforced concrete

    鐵路固定設備.鋼筋水泥預制槽構件
分享友人