reservoir bottom 中文意思是什麼

reservoir bottom 解釋
油箱底
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  1. Slope - bottom land transition zone was usually neglected in previous exploration but was favorite site of forming lithologic reservoir

    摘要坡窪過渡地區是已往勘探常被忽略的構造帶,但卻是巖性油藏形成的有利場所。
  2. As the progress of exploration and the importance that liaohe oilfield leaders have attached to lithologic reservoir exploration, the work has been gradually deepened in slope - bottom land transition zone, exploration breakthroughs have been made constantly, and the contribution to reserves is increasing

    由於勘探形勢的發展以及遼河油田公司各級領導對巖性油氣藏勘探的高度重視,使得坡窪過渡地區巖性油藏勘探工作逐步得以深入,並不斷取得新的勘探突破,對儲量的貢獻也逐步增大。
  3. Some ideas about three - gorge reservoir bottom clearage under the water level

    線水位庫底清理的一些看法
  4. Bottom water coning is an important factor affecting reservoir development effect, causing earlier water breakthrough, rapid water cut increase and production decrease

    摘要底水錐進是影響底水油藏開發效果的重要因素。
  5. Look from the vertical section plane, project two have not the delta conformation of fill up. project one lost the effectual contains of reservoir. in opposition, project two lost the dead contains. during the experiment of the local former in front of the dam, the quantity of the sandiness out the reservoir appears that lot of sandiness passed the bottom hole and little passed the electricity plant and the water gap

    方案二與初設方案運用對比,方案二淤積總量明顯減少,從淤積縱剖面看,方案二無明顯三角洲淤積形態,而初設方案運用30年淤積形態具有明顯的三角洲淤積形態,從庫容變化看,初設方案運用主要損失有效庫容,而方案二則相反主要損失死庫容。
  6. The well test interpretation of partially perforated vertical well in thin bed bottom water reservoir

    薄層底水油藏部分打開直井試井解釋方法研究
  7. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  8. The heat exchange with the reservoir is good and the temperature difference is only small between the bottom and top of the reservoir.

    熱儲內部的熱交換良好,熱儲頂部和底部的溫度差極小。
  9. Abstract : in this paper, the existed problem of oil discharge s crew at the bottom of internal combustion engine oil reservoir is pointed out, th e consequence is analysed, then puts forward the performance objective required i n the course of draining failure oil on the base of the article, the special oil discharge valve of internal lubricating oil is introduced

    文摘:指出了內燃機油底殼上放油螺絲在使用中存在的問題,分析由此而引起的後果,提出了排放失效機油過程中所需達到的要求,介紹了內燃機機油專用放油閥門。
  10. Static analysis by three - dimensional finite element method for bottom intake of drainage and sediment flushing in baishi reservoir

    白石水庫泄水排沙底孔三維有限元靜力分析
  11. Bottom water drive reservoir

    底水驅油藏
  12. Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir

    白石水庫泄洪排沙底孔布置及硅粉混凝土應用
  13. In addition, side - tracking in old wells can produce residual oil between wells and on structural high, improve pattern arrangement, and control bottom water coning ; it is an effective method for developing minor fault block reservoir with complex lithology and bottom water

    同時,老井側鉆既能挖掘井間及高部位剩餘油,完善井網,又能有效控制底水錐進,是復雜底水小斷塊油藏經濟高效開發的措施方法。
  14. At the stage of comparison of drafts, according to the fact of water resources in laiwu city, and the case of the water replenished together with used in qiaodian reservoir, it analyses that the water level heightened is necessary and feasible. it sums up an easy, rational and facile means that can be generalized in water design units at grass roots, according to choosing a best scheme by fuzzy comprehensive judgement. in the course of designing engineering, it has obtained the results such as the seepage of dam bottom, verifying the safety of dams, and the design of reinforcement, so that it ensures the safety on the engineering, and achieves the aims of prospective

    在方案論證階段,根據萊蕪市水資源狀況及喬店水庫來水用水情況,分析了抬高興利水位的必要性和可行性,採用模糊數學綜合評判的方法,總結探討出一種簡單合理,易於操作,在基層水利設計單位具有一定推廣價值的方案優選辦法;在工程設計中,主要對大壩壩基滲漏,大壩安全校核及加固設計進行了計算,並對大壩加固設計進行模糊優選,保證了工程安全,達到了預期的目的。
  15. The theoretical study of the recovery percent vs. water cut of thin and bottom water reservoir in luliang oilfield is based on developing its geologic and flow models, obtaining oil - thickness ratio, oil - water viscosity ratio, relative permeability curve parameter and chart of effect of bottom water toning, etc., on water - yielding pattern of the reservoir

    摘要在建立了陸梁薄層底水藏地質及滲流模型基礎上,採用理論研究的方法,研究了薄層底水油藏采出程度與含水率關系式,並獲得了油厚比、油水粘度比、相滲曲線特徵參數以及底水錐進等對油藏產水規律的影響關系圖版。
  16. Geonet can be used in vegetation slope protection, reservoir bottom reinforceme nt and rubbish filling spot

    主要應用於綠化用邊坡防護。水庫庫底的加固。垃圾田埋埋廠的淀層。
  17. Based on the theory of interaction of fluid - solid, the fem and semi - analytic method are used to analyze the reaction of dam - reservoir subjected to seismic motion, the analysis includes the effect of water compressibility, reflectance of reservoir bottom and water viscosity. the mechanical properties, isolation mechanism and effects of hydraulic air cushions are studied theoretically

    從流固耦合理論出發,以有限元分析為主要研究手段,並輔之以半解析法,系統深入研究了水可壓縮性、庫底庫底邊界和水體的粘滯性對拱壩地震動水壓力及壩體地震反應的影響及其規律性。
  18. The analysis results are as follows : it is very possible that the reservoir bottom rock will be destroyed, the reservoir - induced earthquake is likely to be induced, and the greatest earthquake magnitude is about 5

    結果表明,水庫底部巖石發生破壞的可能性很大,極可能引起水庫的誘發地震,其最大震級為5級左右。
  19. When the jiangkou reservoir is analyzed, its different breadth cases and a zone of fracture going through its bottom are considered, and the maximal shear stress in the reservoir bottom rock is shown

    在水庫底部有斷裂通過時,對江口水庫在不同的假設寬度情況下進行了分析,給出了水庫底部各處的最大剪應力。
  20. Based on the fem model of the dam - reservoir system, the influence of water compressibility to the hydrodynamics is systemically analyzed and researched. it is showed thaf the water compressibility has significant effect to the size and distributing of hydrodynamics on the high dam, and the absorbency of reservoir bottom has a role as a damper on the dam - reservoir system

    基於庫水體各類邊界條件的有限元模型,系統分析了可壓縮性對壩體動力響應的影響,表明水可壓縮性對高壩動水壓力強度和分佈具有顯著影響,而庫底邊界條件對大壩的地震反應有抑制作用。
分享友人