section slope 中文意思是什麼

section slope 解釋
截面斜度
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. The slope at any section of the actual beam is equal to the shear at corresponding section of the conjugate beam.

    實際梁任何部位的角變等於共軛梁相對應部位的剪力。
  3. Strengthening ill geologic section road chasm side slope with prestressed achor pile grid beam

    預應力錨桿格梁加固不良地質地段路塹邊坡
  4. The results indicated that the ree tracer technology has high precision to quantify the spatial - temporal process of soil erosion ; in earlier rainfall course, the development degree of sheet and nil erosion was general equation ; otherwise in the following course, the rill erosion was dominant in the total erosion, its average erosion acceleration and the average erosion rate was 15 and 9 times of sheet erosion, respectively ; in the end of experiment, the rill erosion took up 90 % of total erosion amount ; the section of slope bottom occupying about 1 / 3 slope area was active erosion segment in this experiment

    結果表明: ree示蹤技術對定量研究土壤侵蝕具有較高的精度;降雨前期,片蝕與細溝侵蝕發育程度基本相當;後期細溝侵蝕占據坡面侵蝕的主導地位,其侵蝕平均加速度和平均侵蝕率分別是片蝕的15倍、 9倍;試驗結束,細溝侵蝕占據坡面總侵蝕的90 % ;本試驗條件下,坡面下1 / 3區域為侵蝕活躍帶。
  5. Combining with the research task researching on the deformation and stability of deep excavated cuts and high filled embankment of the traffic department in fujian province, based on the residual soil slope project on the project site at k15 + 183 of yong - zhang highway ( yong ' an section ), adopting non - linear theory, modern monitoring technology and numerical simulation technology, the deformation and stability of cutting cliff debris and residual soil slopes have been studied systemically and synthetically in the thesis. at the same time theory analysis, the analysis and estimate of field monitoring are taken into account in this course. main research work and working achievement are summed up as follows : ( 1 ) with the acquaintance of the trends and development about the deformation and stability of slopes at home and abroad, slopes are classified and summarized systemically

    並通過k15 + 183工點路塹土質邊坡的各類位移變形的監測成果驗證了該程序的正確性及適用性; ( 5 )通過應用大型有限元軟體ansys模擬分析,不僅分析了其隨著開挖時間步的應力應變關系,並模擬了與實際測斜管相匹配的測斜路徑,通過對各開挖時間步的模擬計算分析,得到了與實測數據較符合的結果; ( 6 )綜合監測分析成果和極限平衡理論計算分析成果,對k15 + 183工點路塹邊坡的原設計坡率和幾何形態進行了優化計算分析,取得了較為滿意的結果。
  6. And combining with compound analysis, this thesis has calculated and estimated the deformation and stability of slopes of the cliff debris and residual soil slope project on the project site at k15 + 183 of yong ' an section of yong - zhang highway ; ( 3 ) in the course of the cut slope excavation inner displacement has been in control of real time field monitoring

    同時邊坡開挖後期坡頂會出現回彈現象。 3 、數值計算成果表明,隨著開挖階數的增加,大小主應力在邊坡內也進行不斷的調整。邊坡開挖后坡腳處大小主應力值nlfep程序結果與ansys計算結果較為相似,兩者吻合性較好。
  7. But we did not think section 7th was so hard to go, we had walked continuously 16 hours with heavy burden, the 500 meters high hills, and 600 meters high grass slope seemed to be so high and dangerous now

    但沒想到第7段的山也是異常難爬, 500米的針山, 600米的草山此時對于已經連續負重行走16個小時的我們來說是那麼的高那麼的險。
  8. Article 6 where the building lot for a building and connected facilities in a hot spring area is subject to restriction in regard to the gradient of slope of land on which building development is not permitted, the city / county ( municipal ) government with due jurisdiction shall consider the particular characteristics of the hot spring area ? s development in setting other criteria for review in accordance with the proviso to article 262, paragraph 3 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受山坡地坡度陡峭不得開發建築之限制者,直轄市、縣(市)政府應考量溫泉區發展特性,依建築技術規則建築設計施工編第二百六十二條第三項但書規定,另定規定審查。
  9. The home situates on a hill slope in a very quiet and scenic area with a panoramic view of the sea. it contains the care and attention and the meal section

    本院建於景色怡人的山坡旁,環境幽美寧靜院內並分別設有安老部及護理部。
  10. In consideration of the soil arch effect between anti - slide piles, a calculation formula for the anti - slide pile spacing was developed, taking the following factors as the controlling conditions - the static equilibrium equation of the frictional resistance and adhesive force between the side of piles and slope soil, which sustains the thrusting force of the landside, and the strength conditions at the medial cross - section and two end sections of soil arch

    摘要考慮抗滑樁樁間土拱效應,以樁側與邊坡土體間的摩阻力及黏著力承擔滑坡推力的靜力平衡條件和土拱跨中與拱腳處截面的強度條件共同控制,建立了抗樁間距的計算公式。
  11. Widening of the eastbound carriageway of this section of tuen mun road to four lanes with provision of a hard - shoulder and verge, and associated retaining wall and slope works

    擴闊此段屯門公路九方向行車道至四線行車並加設路肩和路旁帶及進行有關的斜坡和擋土墻工程
  12. On the basis of the framework of chronostratigraphic sequence and the analysis of well - log, seismic section, the paper studied types and the distribution of sedimentary facies. three types of sediment can be identified : braided river delta systems mainly formed on the south slope. little - sized turbidit fan mainly formed in the middle deep area and dan delta mainly formed on the north slope of the depression

    在等時層序地層格架的基礎上,通過測井、地震資料分析,對凹陷沉積相的類型及空間分佈進行了研究,研究表明南坡主要發育辮狀河三角洲體系,深窪區發育小型濁積扇體系。北坡主要發育扇三角洲相。
  13. Secondly, the finite - element analysis on the typical slope section is performed with establishment of geology model, definition of boundary condition and proper selection of mechanical parameters. the result shows that the slope is of integral stability, and the failure mode mainly comprises infrequent block drop and wedge body breakage. considering the two failure modes of plane failure and wedge body breakage, and stability calculation under different work conditions, the slope stability is discussed and the sensibility ana lysis on its fraction angel and cohesion force is made

    然後通過建立地質模型、確定邊界條件、選擇合理的力學參數,取典型斷面對邊坡進行數值分析,分析結果表明斜坡整體是穩定的,破壞類型以零星掉塊和楔體失穩下滑為主;為了定量計算邊坡的穩定性,對邊坡兩種破壞類型:單滑面下滑和雙滑面楔形體下滑,考慮不同工況進行穩定性計算,並對摩擦角和粘聚力進行穩定的敏感性分析。
  14. The traffic noise of a new traffic source - combined overhead road was measuered, and the noise distribution under varied road conditions and different surroundings was compared, anlyzed and discussed. the noise model of overhead road, which with special section such as slope was put forwarded, based on the basic overhead noise model by considering the effects of the special section on the total noise level and distribution

    比較分析了不同路況下及周圍環境下的噪聲分佈情況,在水平段高架復合道路噪聲的豎直分佈模型的基礎上,考慮上下坡段對兩側建築物噪聲分佈的影響,建立了特殊路況下高架復合道路噪聲的豎直分佈模型,預測值與實測值基本符合。
  15. The principal conclusions include : ( a ) the composite system is composed of both active - bearing structural members and inactive - bearing ones, being of a character of combination of rigid retaining structures with flexible ones, so its working mechanism will be behaved as sharing loadings, waterproof and impermeability, loading transfer, local reinforcement and pre - reinforcement ; ( b ) the experimental results show that much more subsoil will participate in retaining action, soil stresses of internal slope will be shared uniformly and deflections caused by excavation will be reduced notably because of cooperation of nails and cement - soil mixing pile wall ; and ( c ) the internal forces of facing in vertical model will be a control factor of design and the cross section tensile strength of cement - soil wall will govern strength of the

    主要研究結論有: ( 1 )復合土釘支護的作用機理主要為臨時加固土體以保證局部穩定、有機聯系以共同承擔荷載、改善土體性質起到止水抗滲作用。 ( 2 )試驗結果表明:復合土釘支護能夠充分調動周圍土體共同作用,有效地控制基坑變形;復合土釘支護中止水帷幕的插入深度和強度對控制邊坡變形與失穩有較大作用;復合土釘支護效果明顯優於一般的土釘支護。 ( 3 )面層與邊坡土體共同變形,設計時可按外力作用下的彈性地基梁進行計算。
  16. The reason to creates this kind of destruction to be very many, the main of them is that the apron partially has not been able fully to display it to eliminate energy affect so causes the ditch bed to wash out, forms flushes the pit, leading to the apron, to guard against flushes the trough and both banks slope protection destruction, for a long time, disappear power design of plunge basin and layout have been focused on disappear power. but not to give the enough value on uses the sea to inundate the section to disappear power and adjust speed to reduced downriver washes out

    水閘閘下沖刷破壞的部位絕大多數發生在消力池下的海漫和防沖槽處,造成這種破壞的原因很多,其中很大一部分是由於海漫部分未能充分發揮其消能作用而引起渠床沖刷,形成沖坑,導致海漫、防沖槽及兩岸護坡的破壞。一直以來,人們把消能的研究重點放在消力池的消能設計及平面布置上,而對海漫段消能及調整流速功能研究甚少,至於對海漫加糙水流運動建立數學模型,在國內外還很少見相關的論文資料。
  17. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  18. 108 highway is the south and north mainline to run through middle - west area in my country, and is the main artery of west area economy developing. guangyuan north section of 108 national highway lies in low mountains, and its slope often is unstable

    四川省是西南地區經濟發展的龍頭, 108國道是我國中西部地區縱貫南北的主幹線,是西部經濟發展的大動脈,而108國道廣元北段地處低山地段,邊坡失穩現象較常見。
  19. The formulas and calculation method for the practical and economical cross - section of the trapezoidal channel with an arc slope angle are briefly presented

    摘要簡單介紹了弧形坡腳梯形渠道實用經濟斷面的計算式和計算方法。
  20. Based on the engineering practice of the side slope excavation of dayanchi section within the road for the construction traffic of guandi hydropower station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole - making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed ; for which the specific solutions are put forward herein as well

    摘要通過官地水電站對外交通公路大鹽池合同段邊坡開挖中預裂爆破的工程實踐,對預裂爆破的孔距選擇及下部嚴重出現巖坎、預裂面平整度、預裂爆破后輔助孔成孔率低、預裂與爆破區爆破網路以及預裂孔角度變化等問題進行分析,提出了具體的解決方法。
分享友人