sediment engineering 中文意思是什麼

sediment engineering 解釋
泥沙工程學
  • sediment : n. 1. 沉澱(物);沉渣。2. 【地質學;地理學】沉積物。
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. In the former researches, scholars mainly studied following static aspects : topography and geomorphy, ocean hydrodynamic condition and soil engineering features. there is a lack of researches on the heterogeneity of sediment strength and the regular distributing characteristics

    在過去的研究中,人們主要對黃河三角洲的形貌特徵、海洋動力條件、土體工程特性進行了靜態的研究工作,而對于波浪導致的土體強度的非均勻化及空間分佈上的規律缺少研究。
  2. The behaviors of the inflow and sediment, the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the hechangzhou brai - ded channel are analyzed and the scheme researches, engineering design, construction and the effects of the control works at the entrance of the left branch of the hechang sandbar are presented in the paper

    根據鎮揚河目前的情況分析了該河段來水來沙特點、近期河道演變規律及演變趨勢,介紹了該河段二期整治工程的基本情況,並著重介紹了和暢洲左汊口門控制工程方案研究、設計、施工及工程效果等內容。
  3. Speciality in consultation field : research, design and supervision for sediment engineering in rivers, harbors and waterways, inclusive of river processes, flow and sediment motion, flood control engineering, selection of harbor location, navigation training works, bridge, and water supply projects, etc

    從事河流治理和港口航道方面的泥沙工程科學研究和設計、監理工作,包括河道演變和水流泥沙運動規律、防洪工程、河港選址和航道整治工程、橋梁和取水工程等方面。
  4. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測疏浚工程實施后的水位、流量、流速流場變化,為河道、航道港口整治、河道疏浚清淤等工程決策與實施提供了可靠理論依據。
  5. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京水科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪水池; 4 .編寫了南京水科院「泥沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪水槽設計,該水槽建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。
  6. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  7. Abstract : by analyzing the changes of incoming water and sediment in the lower weihe river, in allusion to the question of flood discharge capacity being not enough, control project being short, river pattern can ? t being controlled and the management being loose etc, advise to increase the investment, consummate the measures of flood prevention engineering and non - engineering. strengthen the management, consolidate the consciousness of flood prevention and disaster alleviation, in order to raise recent ability of flood prevention in the lower weihe river

    文摘:通過對渭河下游來水來沙變化的分析,針對現狀堤防過洪能力不足、控導工程少、河勢得不到控制和管理工程等方面存在的問題,提出應加大投入力度,完善防洪工程措施和非工程措施,加強管理,強化防洪減災意識,提高近期渭河下游防洪能力。
  8. The paper analyzes and summarizes the following laws of distinctive sediment yield produced in storm floods of the region based on predecessors ' study : storm is the main dynamic force of erosive sediment yield and storm, flood and sediment exist an inevitable relation ; the flood occurring time is concentrated with high peaks and huge volume, suddenly rising and suddenly falling and has decisive influence to the formation of a major flood peak in the middle yellow river ; the main reasons of concentrated coarse sediment of the river is severe erosive sediment yield, strong sediment transporting capacity and high sediment concentration ; the important influence of frequent or continued storm floods happened in he - long reach especially in coarse sediment concentrated region to the sediment transport of the yellow river and ; along with the increase of harnessing, regional flood trend is becoming smaller but the variation of sediment quantity is not obvious and the reaction of peak discharge and flood runoff of majority tributaries are not sensitive, showing that a general and normal engineering works can not effectively control regional major floods especially the sediment of an extraordinary flood

    摘要在前人研究的基礎上分析總結了該區特有的暴雨洪水產沙規律:暴雨是侵蝕產沙的主要動力,暴雨、洪水、泥沙之間存在著必然的關系;洪水發生時間集中,峰高量大,暴漲暴落,對黃河中游大洪峰的形成具有決定性影響;侵蝕產沙強烈而粗泥沙集中,輸沙能力強,洪水含沙量高,是黃河粗泥沙的集中來源地;河龍區間特別是粗泥沙集中來源區頻繁或連續的暴雨洪水對黃河輸沙有重要影響;隨著治理水平的提高,區域洪水有減小趨勢,但泥沙量變化不明顯,大部分支流的洪峰流量、洪水含水量反應不敏感,說明一般規模和水平的治理工程還不能有效控制區域大洪水特別是特大洪水的泥沙。
  9. Today, cast - in - situ piles are more widely used in deep foundation engineering because of their many advantages, such as better adaptability to various ground condition, providing enormous bearing capacity by a single pile and smaller dosage of reinforcing steel bar. but, their own disadvantages, such as sediment under tip, clay slurry around pile, friction and tip resistance disagreement and initial ground stress freeing, limited their bearing capacity, lowered the utilization ratio of material and increased the settlement

    灌注樁,因其對地層適應性強、能提供較大的單樁承載力、鋼筋用量少等優點,在目前深基礎工程中得到了極為廣泛的應用。但是,灌注樁的固有缺陷,諸如孔底虛土;孔壁泥漿;端阻、側阻發揮不同步;鉆孔后原地應力釋放等,限制了其承載力的發揮,使得材料利用率不高,沉降較大。
  10. Many problems in sediment engineering involve dealing with river valley deposits as a whole.

    泥沙工程中的許多問題都把河流的河谷沉積物作為一個整體來研究。
  11. Sea bottom sediment characteristics and engineering geologic properties in the chengdao oil field sea area

    埕島油田海域海底沉積特徵與工程地質特性
  12. The comparison between the experimental data with numerical simulation show that the model have a higher precision in the lateral scouring and sedimentation deformation, time interval quantity of deposition, and output sediment concentration process during sand peak at various cross section and is applied fairly good to practical engineering

    青銅峽水庫的實測資料對模型驗證結果表明:模型在水庫不同斷面橫向沖淤變形、時段淤積量、沙峰期出庫含沙量過程都具有較高的精度,能較好地運用於工程實際。
  13. Zhangxianming, male, was born in shandong on may 27, 1965, majors in the study of channel engineering, river dynamics, sediment engineering and hydrodynamic ; meanwhile, he has been teaching several related courses

    張賢明,男, 1965年5月出生,主要研究方向為航道工程、河流動力學、泥沙工程及水動力學,承擔了多門相關課程的教學工作。
  14. In this paper, a brief introduction of hydrodynamic, sediment transport model and its application in engineering projects are reported. 2. the equations are derived using a tensor analysis of two - phase flow, and the background of basic equations and parameters in the numerical model are discussed

    本文採用非交錯曲線網格二、三維水流泥沙數值模型研究感潮河道水流泥沙問題,主要內容有: ( 1 )綜述水流泥沙數值模型的發展概況,及其工程應用。
  15. Department of environmental engineering, peking university ; key lab of water and sediment sciences, ministry of education, beijing, 100871

    北京大學環境工程系,水沙科學教育部重點實驗室,北京, 100871
  16. Department of environmental engineering, college of environmental sciences, peking university ; the key lab of water and sediment sciences, ministry of education, beijing, 100871

    劉榮霞,薛安,韓鵬,倪晉仁北京大學環境工程系,水沙科學教育部重點實驗室,北京, 100871
  17. Van arkel, g. j, 1993. long - term sediment modeling in hamilton harbors, m. sc. thesis, civil engineering, mcmaster university, ontario, canada

    何晶晶.受污染城市水體淤泥的清理與處置技術研究,中國城市建設與環境保護實際.北京:中國環境科學出版社, 1997 , 181 184
  18. But currently a huge amount of sediment deposited there has caused severe problems and need to be dredged. dredging is one of the effective engineering measures to control floods and improve navigation, irrigation conditions and environment

    但是,目前這些河流、湖泊、水庫和港口的泥沙淤積嚴重,需要進行清淤疏浚,以提高防洪、灌溉、通航能力,改善生態環境。
  19. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮流、泥沙運動的動力機制,以及整治工程建築物對其影響的研究,對入海航道沖淤和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
  20. Therefore, nowadays major problem is how to reduce the slope cultivated land ' s soil erosion and sediment concentration transporting to three gorges reservoir in order to prolong the three gorges engineering ' s use time and protect the safety of the middle and lower reaches channel of yangtze river

    因此當前的主要問題是如何臧輕坡耕地土壤侵蝕,減少進入三峽庫區的泥沙量,延長三峽工程的運轉時間,保障長江中下遊河道的安全。另外,按土壤平均厚度78 。
分享友人