sewage and wastewater treatment 中文意思是什麼

sewage and wastewater treatment 解釋
污水和廢水處理
  • sewage : n. 1. 陰溝污物;污水。2. 下水道。vt. 1. 用污水灌溉[作肥料]。2. 裝設下水道于(某地)。
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • wastewater : 廢水處理
  • treatment : n 待遇;作業;處理,處置;討論,論述;【醫學】治療,療法;(種子的)消毒(處理)。 preferential t...
  1. In yishui county, wastewater is increased quickly with the development of economy and increase of urban population. suburbanites are suffering from environmental quality deteriorated caused by the wastewater directly discharged from industries and community. but the government ca n ' t finance the building of sewage treatment plant nor the running of sewage treatment plant

    隨著沂水縣經濟的發展和城市人口的增長,城市污水日趨增多,工業污水和未經處理的生活污水直接排入城區河流,導致環境質量惡化,已嚴重影響了城區周圍居民的生活,而地方政府財政困難,既無力建設城市污水處理廠,也無力承擔污水處理廠的運營費用。
  2. In concessionary agreement section, the participators have presented some problems which are difficult to confirm, such as toll, invoice, payment, etc. in view of industries " and denizens " economic abilities, it ' s not practical to run the sewage treatment plant only to rely to increase the discharge toll. so on the one hand, it ' s necessary to allow to discharge higher consistency and increase toll accordingly ; on the other hand, to reuse wastewater and sludge

    考慮到排污企業和居民經濟上的承受能力,單純靠提高污水處理收費標準來保證污水處理廠的持續運行是不現實的,因此項目一方面適當的提高了允許排入污水處理廠的污水濃度和污水處理價格,同時增加了中水回用方案和污泥處理方案,從其它途徑解決了污水處理收費偏低和投資者一定的投資回報要求之間的矛盾。
  3. To begin with, most of hong kong s sewage and wastewater ended up in the sea, but the bulk of it had received little or no treatment before discharge due to the lack of a developed sewer network and treatment facilities at that time. this led to rises in organic and inorganic pollutants, a reduction in the oxygen content of the water, and increased bacteria levels

    城市的生活污水和工業廢水一般均排入大海,但由於當時污水系統及處理設施並不完善,大部分污水只經過初步處理或甚至未經處理便予以排放,導致海水中有機和無機污染物不斷增加,含氧量下降和細菌水平上升。
  4. This event was intended to discuss the prospects of cooperation in various forms in industrial wastewater treatment, sludge treatment from municipal sewage treatment, energy - from - sludge waste treatment and electronic wastes disposal in

    此次活動旨在探討雙方在工業污水處理、市政污水處理剩餘污泥處理、固體廢物轉能源及電子垃圾處理等領域的各種形式的合作的前景並進行商務對接。
  5. In environment protection and wastewater treatment profession, ortho provided entire factory automation control systems, water treatment instruments and devices, television supervisory systems and the comprehensive wiring facilities for may wastewater plants whose the capacity is above 1, 000, 000 tons of sewage per day

    在環保水處理行業,昊圖公司為多個10萬噸以上污水處理廠提供了全廠自動化控制系統,水處理儀器和儀表,電視監控系統和綜合布線設施。
  6. In the case of the kwun tong typhoon shelter, improved levels of dissolved oxygen have arisen both because of the epd s ongoing efforts to reduce the discharge of wastewater into it, and because of the government s tolo harbour effluent export scheme, in which relatively clean treated effluent has been piped from the sha tin and tai po sewage treatment works in the tolo harbour area and released near the kwun tong typhoon shelter, raising oxygen levels in the water and improving water flow

    另外政府所推行的吐露港污水輸出計劃也使觀塘避風塘的溶解氧逐步提高。吐露港污水輸出計劃是將吐露港區內經沙田及大埔污水處理廠處理過的污水經管道通至觀塘避風塘上游的啟德明渠排放,從而增加了明渠的流量,也提高避風塘的溶解氧水平。
  7. On the basis of analysis on wastewater pollution and water quality monitoring in the shaxi river basin, countermeasures are proposed in order to solve the existing problems, including adjusting industrial structure and rationally arranging industrial allocation, integrated treatment and water environment improvement, total discharge control, fulfilling the benign circulation of water environment, improving the monitoring net and capability, optimizing the allocation of water resources and water environment quality, hastening the construction of sewage treatment plants, and making the water quality of the effluents reach the national standard

    摘要在分析沙溪流域廢污水排放、水質監測等情況的基礎上,針對流域水環境存在問題,提出了沙溪流域水環境對策措施:調整產業結構,合理工業布局;實施綜合治理,改善水環境;實行總量控制,實現水環境良性循環;完善監測網路,提高監測能力;優化水資源配置方式,改善水環境質量;加快污水處理廠建設,實現達標排放。
  8. Wastewater treatment plants - principles for the design of structures and technical equipment - part 8 : specific principles for the equipment for sewage treatment in granular media filter and granular fixed bed filter

    污水處理廠.結構和技術設備設計原則.第8部分:粒狀介
  9. When functionality testing is being performed following the completion of the trial operation of wastewater, sewage or sludge treatment facilities, the engineer shall conduct an on - site check to determine whether the enterprise ? s wastewater, sewage and sludge output volume ; operating system ; operational status of wastewater, sewage and sludge treatment ; sampling locations ; sample quantity ; and sampling frequency comply with regulations and whether relevant records are reliable

    五廢(污)水處理及污泥設施完成試車,進行功能測試時,前往現場查核事業之廢(污)水與污泥產生量、作業系統、廢(污)水與污泥處理操作狀態、取樣位置、數量、頻率是否符合規定及相關紀錄是否確實。
  10. The parasitic thermal energy produced combined with the electricity that is generated make the treatment plants self - sufficient and wastewater from sewage treatment works can be purified to industrial water quality for reuse as irrigation water or can be treated to even higher quality standards if required

    產生的熱量與生成的電能相結合使處理工廠可以自給自足,廢水通過污水處理系統凈化后可以達到工業用水質量並做為灌溉水重新使用,或者處理為符合更高質量標準的用水(如果需要) 。
分享友人