shear pattern 中文意思是什麼

shear pattern 解釋
剪切型
  • shear : vt vi (sheared 〈古語〉 shore; shorn sheared)1 剪(羊毛等);修剪(樹木);剪(呢絨的)長毛。2 ...
  • pattern : n 1 模範,榜樣;典範。2 型,模型;模式;雛型;【冶金】原型。3 花樣;式樣;(服裝裁剪的)紙樣;圖...
  1. Based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    基於某試驗路段軟基處理前後靜力觸探、十字板試驗的對比測試和對兩根單樁、兩處單樁復合地基進行的4次靜載試驗,研究了樁間土性狀在施工水泥粉噴樁前後的變化和樁土應力比的變化規律,提出了根據靜載試驗確定粉噴樁及其復合地基承載力新的取值方法,並修正了復合地基承載力的計算公式。
  2. Abstract : based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    文摘:基於某試驗路段軟基處理前後靜力觸探、十字板試驗的對比測試和對兩根單樁、兩處單樁復合地基進行的4次靜載試驗,研究了樁間土性狀在施工水泥粉噴樁前後的變化和樁土應力比的變化規律,提出了根據靜載試驗確定粉噴樁及其復合地基承載力新的取值方法,並修正了復合地基承載力的計算公式。
  3. In the process of writing paper, assimilating sufficiently procedessor " research achievement, exertting ductile - brittle shear zone, resolving mechanism of formation of gold - bearing quartz vein of chener. lining out ductile - brittle shear zone of chener gold deposit, presenttig pattern of controlling chener gold deposit, with analyzing of dominant ore vein - q507, graph of change of trace element on different spot level and graph of change of gold element of different construct, researching construct geochemistry of ore zone

    在論文撰寫的過程中,充分吸收前人的研究成果,運用韌性剪切帶理論,解析了陳耳金礦區含金石英脈體的形成機理,劃出了控制陳耳金礦床的韌-脆性剪切帶,提出了礦床的構造控礦模式。
  4. The analysis of the large - scale synoptic situation shows that strong precipitation is closely related to the explosion of monsoon and the intensification of cross - equatorial flow which bring a lot of vapor and meet with cold masses at the eastern of northwest district on 8th, june causing extremely heavy rainfall ; that subtropical high - level jet at 200hpa, subtropical high at 500hpa and low - level jet at 850hpa are the weather backgrounds favorable to strong precipitation ; that the pattern of eastern highs and western lows and the establishment of a low - level jet and the coupling between upper - and low - level patterns that determine that the rain occurred in the east of the northwest china ( on average, this is the rainy season for the south of china, but not for the northwest china ) ; that water vapor comes from southerly and easterly flow which converge at the eastern of northwest district with convergence mainly in lower levels and pbl ; that the high value of the whole - level apparent heat source < q1 > is near the area of large rainfall in the direction of northeasterly - southwesterly agreeable to shear line very well and the condensation latent heat releasing is main heat source with vertical advection item playing key role in q1 and q2 ; that there is a vertical secondary circulation crossing low - lever jet whose ascending branch is at the area of large rainfall ; that the construction of convection instability and conditional symmetry instability results that there is not only deep thermal instability, but also moisture influx and triggering mechanism of thermal instability causing strong torrential rain

    作為對比,本文還對2002年6月24 - 25日發生在北京地區的強地形雨進行了分析,並討論陜南、北京地區兩地暴雨的異同點以及地形作用的共性和個性,為兩地暴雨預報提供有益的參考,得出了一些很有意義的結果: 1大尺度環流背景分析表明: ( 1 ) 「 02 . 6 」強降水與6月上旬越赤道氣流和季風爆發密切相關,攜帶大量水汽的偏南氣流與冷空氣於6月8日交匯在西北地區東部,導致了這次強降水的發生; ( 2 ) 200hpa的副熱帶西風急流、 500hpa副高以及850hpa的低空急流的配置非常有利於本文分析之陜西強降水的發展與維持。大尺度形勢分析表明,東高西低形勢場、低空急流的建立和高低空形勢的配置決定了這場降雨出現在西北地區東部。與暴雨區相聯系,存在一支橫越低空急流的經向垂直環流,暴雨區處于該垂直環流的上升支; ( 3 )偏南和偏東氣流水汽通道在西北地區東部交匯,水汽的輻合積聚主要在對流層低層和行星邊界層內完成; ( 4 )整層的視熱源< q _ 1 >高值區在暴雨區附近呈東北-西南向分佈,與切變線走向非常一致,降水產生的凝結潛熱釋放是強降水區大氣的主要熱源。
  5. Failure or even collapse of bridge structures in past earthquakes were largely. in particular, shear failure of short bridge pier columns is the most dangerous failure pattern due to the brittle nature. consequently, it is quite meaningful to study the seismic resistance performance and retrofitting for reducing bridge damages and losses

    從已建橋梁在歷次地震中破壞的共同特點可以看出:現代混凝土橋梁結構中,因鋼筋混凝土橋墩破壞導致橋梁嚴重破壞甚至倒塌,已成為橋梁震害的主要特點,特別是橋梁短柱的破壞尤為嚴重,而脆性剪切破壞是鋼筋混凝土短柱最為危險的破壞方式之一。
  6. Application of electronic shear speckle pattern interferometry to nondestructive evaluation of materials

    電子剪切散斑在檢測材料缺陷中的應用
  7. Frame supported short pier shear wall structure with transition floors is a useful structure pattern with good ability in resisting seismic load. the lower part is frame with large opening column - grid while the upper part uses short pier shear wall with wide openings. so this structure decreases the difference between stiffnesses of lower part and upper part

    帶梁式轉換層的短肢剪力墻結構,其下部結構為大開間的柱網框架,上部結構採用開洞較大的短肢剪力墻,有效地降低了轉換層上下結構之間的剛度差異,因而是一種抗震性能較好的結構型式。
  8. Furthermore, comparing between the results calculated by the program and that of the test indicate that they are analogical. using the program, both the model structure and the prototype of the longitudinal frame - shear wall structure system of main factory building in a large thermal power plant are analyzed, from which we get the regular pattern of earthquake resistant behaviors of this kind of structure and propose the recommends for b oth s eismic d esign and c onstruction

    應用該程序,本文對某大型火電廠鋼筋混凝土結構主廠房縱向框架-剪力墻結構體系的試驗模型和原型結構進行了分析比較,得到了這類結構抗震性能的一般規律,提出了一些新的抗震設計理念與構造建議;同時結合研究成果,為我國現行《建築抗震設計規范》中基於承載力的抗震設計方法提出了一些修訂建議。
  9. The failure mechanism and the pattern of damage are analyzed in this paper. on the grounds of experimental results and theoretical analysis, the formula of ultimate shear capacity of prestressed masonry wall is established

    分析了預應力砌塊砌體的受力、破壞機理,結合試驗結果,探討了預應力砌體抗裂及抗剪承載力計算公式。
  10. It shows that the heavy rain on june 23, 2004 is a southwest vortex - shear pattern, and the heavy rain on june 27, 2004 is a two - high - convergence - pattern

    對比分析表明: 2004年6月23日暴雨過程屬于低渦切變型暴雨, 6月27日暴雨過程屬于兩高輻合型暴雨。
  11. Through the analysis and compare to the model structure and the prototype structure of longitudinal shear wall in main factory building, the regular pattern of earthquake resistant behavior of this kind of structure system is obtained. so this paper puts forward some seismic design concept and detailing suggestion to this kind of structure according to csdb

    根據上述理論與試驗研究結果,得出了縱向帶邊框柱中高剪力墻結構抗震性能的一般規律,提出了一些新的抗震設計理念與構造建議,所得結論與設計方法可供我國相應規范修訂時參考。
分享友人