site clearance 中文意思是什麼

site clearance 解釋
(指施工前的) 場地清理
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  • clearance : n 1 清除,掃除,除去;解除。2 【林業】終伐;(伐去樹木后的)林間空地。3 出[入]港證;放行證;出入...
  1. Introduction : naiwan very fun and the combat game, you will drive your weijia desert and the enemies of combat, kill them all is the only way clearance operation guide : start explaining options for the beginning new nagames successor mission contime training model tutor ial efforts produced lists credits in addition to the training mode after entering the menu is as follows : - please select tasks of the mission on the bottom - armored and armed adjustment can chang enter the name of the game : welcome 4455 miniclip games network, the site domain name to remember : 4455. cc and 3839. cc

    非常好玩而且耐玩的作戰游戲,你將駕駛著你的機甲和沙漠的敵人們展開作戰,把他們全部幹掉是唯一的過關方法操作指南:解說開始選項為最初開始new game接續任務contime訓練模式tutorial協力製作名單credits除了訓練模式外進入后選單如下: -任務選擇請于下方的任務介紹-裝甲能調整以及武裝變更set up武裝切換weapons裝甲切換armor噴射方式jump mode微調噴射charge強噴射trigger調整內容為customize持有cp custom point裝甲調整aamor耐久提升max裝甲提升defense移動提升nbsp
  2. Clearance of the mill site, a 650 x 650 meter, leveled corn - field began by december 31, 2003

    場地( 650米650米,已清平的玉米田)清理工作於2003年12月31日開始。
  3. Before the construction of bridge over navigable rivers, esp. on the reach of complicated topographical and flow conditions, factors such as bed evolution, bridge site ' s choice, clearance dimensions, navigation condition and safety - ensuring measures, etc. shall be studied

    摘要在通航河流,尤其是在橋區地形、水流條件復雜河段處進行橋梁建設前,必須對河床演變、橋位、凈空尺度、通航條件和安全保障等因素進行論證。
  4. For exhibits arrival directly at xingang port / taiyuan airport, transportation from terminal to the bonded storage area of fair site, sorting and delivery to fair booth, assisting exhibitors in unpacking and positioning if the heavy exhibits ( assembling excluded ), customs clearance on a temporary basis, removing empty cases and packing materials to on site storage place ( storage charges are excluded )

    展會開幕前,將抵達新港或太原機場的展品從港口或機場的貨物儲存地運輸到現場儲存場地、掏箱、分貨、搬運到展臺,協助展商開箱和展品就位(不含組裝) ,將空包裝箱和包裝材料運送到倉庫(倉儲費另計) 。
  5. It comprises surplus materials from site clearance, excavation, construction, refurbishment, renovation, demolition and road works

    這包括由工地平整、掘土、樓宇建築、裝修、翻新、拆卸及道路等工程所產生的剩餘物料。
  6. Since the demolition of our old yau tong post office due to site clearance of the ko chiu road estate, we had, as an interim measure, set up a temporary post office at ko yee estate to maintain postal service in the locality

    香港郵政署長蔣任宏說:舊油塘郵政局隨清拆高超道?拆卸后,香港郵政在高怡?設立臨時郵政局,繼續為居民提供服務。
  7. The potential residual impacts will be insignificant provided that any identified contaminated land will be remediated to the acceptable standards prior to the site clearance excavation works, and the mitigation measures recommended will be properly implemented during the construction stage of the project

    挖掘工程進行前把所有已確定的受污染土地的影響減低至可接受水平和在工程項目的施工期間適當地實行建議的緩解措施,則潛在剩餘影響將並不顯著。
  8. With the support of other departments, the environmental protection department has completed clearance of the most notorious site at sheung pak nai in may this year and has removed 40, 000 cubic meters of dumped waste

    在其他部門的協助下,環境保護署于本年五月完成清理位於上白泥情況最差的傾卸區,搬去廢物達四萬立方米。
  9. Site clearance at cheung sha roundabout

    于長沙迴旋處的工地清理
  10. Will conduct grass - cutting and site clearance on new black spots

    在新確認的黑點進行除草和清理行動。
  11. Will conduct site clearance at about 20 identified hillside illegal cultivation black spots

    處已確認的?生黑點進行除草和清理行動。
  12. Will conduct by october 2003 grass - cutting and site clearance at a total of about 600 identified black spots

    二零零三年十月前,在約共
  13. 9 for the purpose of this permit, “ commencement of construction ” does not include works related to site clearance and preparation or other works as agreed by the director

    為執行本許可證,建造工程的展開不包括有關工地清理及預備的工程,或署長同意的其他工程。
  14. 13 for the purpose of this permit, “ commencement of construction ” does not include works related to site clearance and preparation or other works as agreed by the director

    為執行本許可證,工程項目的展開不包括有關工地清理和預備的工程,或署長同意的其他工程。
  15. Works are carefully planned and phased so that all dusty activities such as site clearance and foundations works at adjacent areas will be completed before the occupation of the first tenants

    有關工程經審慎規劃,並分階段進行,以便一切會產生塵埃的工程例如在附近地盤進行的清理及地基工程,都可在數碼港首批租戶遷入前完成。
分享友人