site development cost 中文意思是什麼

site development cost 解釋
地盤發展成本
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  • development : n. 1. 發展,發達;進化。2. 展開;擴充;開發。3. 發達物,新事物,發展階段。4. 【生物學】發育(史);【軍,數】展開;【攝影】顯影,顯像;【音樂】展開(部);研製,研製成果。
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. There are professional development materials that teachers can download from the web site at no cost

    在網站上教師可免費下載專業的發展教學資料。
  2. " a feasibility study is being conducted on the development of the weif. the study addresses the engineering feasibility, environmental acceptability, health impacts, contract arrangement, site selection, preliminary design and cost estimates

    發言人補充:發展廢物焚化能源回收設施的可行性研究現正進行,研究內容包括工程上的可行程度,環保上的可接受程度、健康影響、合約安排、選址、初步設計及費用估計。
  3. A spokesman for the planning, environment and lands bureau said today friday. " a feasibility study is being conducted on the development of the weif. the study addresses the engineering feasibility, environmental acceptability, health impacts, contract arrangement, site selection, preliminary design and cost estimates

    發言人補充:發展廢物焚化能源回收設施的可行性研究現正進行,研究內容包括工程上的可行程度,環保上的可接受程度健康影響合約安排選址初步設計及費用估計。
  4. Fc approved a commitment to upgrade part of 677cl, entitled " wan chai development phase ii, engineering works : consultants fees and site investigation ", to category a at an estimated cost of 111. 1 million in mod prices ; and retain the remainder of 677cl in category b

    財務委員會批準一項承擔額,把677cl號工程計劃的一部分提升為甲級,稱為"灣仔發展計劃第ii期工程:顧問費用及工地勘測"按付款當日價格計算,估計費用為1億1 , 110萬元以及把677cl號工程計劃的餘下部分保留為乙級。
  5. Pwsc endorsed a commitment to carry out site investigations and to engage consultants to carry out the planning of the overall phased development, a schematic plan for phase 1, a detailed design study and contract documentation for the initial two buildings and associated landscaping and external works of the proposed science park at pak shek kok at an estimated cost of 54. 8 million in money - of - the - day prices

    工務小組委員會通過開立承擔額,為擬議的白石角科學園進行地盤勘測工作及委聘顧問進行整體分期發展規劃擬訂第1期的計劃大綱,以及為首兩幢建築物相關的環境美化工程和外部工程進行詳細設計研究和擬備合約文件,按付款當日價格計算,估計費用為5 , 480萬元。
分享友人