soil anchor 中文意思是什麼

soil anchor 解釋
泥錨;入泥錨定桿
  • soil : n 1 泥土,土壤;土質。2 土地,國土。3 滋生地,溫床。4 農業生活,務農。n 1 臟東西,污物,污穢,污...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. In the computation module, mindlin formula is applied to calculable the displacement of the rock ( soil ). based on the presumption that the rock ( soil ) and the anchor has the same displacement at the interface, the equation of displacement of rock ( soil ) and the anchor is made

    在該計算模型中,運用mindlin公式計算巖體位移,並基於在桿體與巖土體接觸面上位移相等的假定與桿體的位移建立等式,進而求出沿桿體全長的剪力分佈。
  2. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  3. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  4. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  5. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    樁錨支擋結構體系是重慶地區經常採用邊坡支護形式之一,長期以來,人們認為樁錨支擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過錨桿把力傳遞給穩定地層。
  6. The structure of prestressed anchor - rope and groundsill is one of the most effective sheathing works, it is used wildly in some slop protection works. the structure is made up of prestressed anchor - rope and groundsill. the combined structure can utilize the latent energy of rock or soil mass

    預應力錨索地梁結構是一種極其有效且正推廣應用於各工程部門的支擋防護體系。該結構由預應力錨索和地梁共同組成。
  7. In the pre - stressed anchor supporting structure with beam and column, anchor, supporting structure and soil work jointly, therefore in this paper, rib - column and rib - beam are used models of elastic foundation beams, the solving method of rib - column and rib - beam are given out

    由於錨桿和支護結構以及周圍土體是共同工作、彼此協調的,因此肋柱、肋梁按彈性地基梁進行計算,並推導出計算公式。
  8. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護機理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  9. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力錨索的內力計算方法進行分析。
  10. In gravel stratum, the method combined soil nails and anchor pile is adopted in deep foundation pit bracing, it can obviously cut down engineering cost, raise efficiency and shorten construction period

    在卵礫石地層中,採用土釘和錨桿樁聯合支護技術進行深基坑支護,節省工程投資,提高工效,縮短施工工期。
  11. A new design method for anchor pillar and plate supporting system of soil landhill

    土質邊坡錨柱板支護系統設計新方法
  12. In terms of its stability and present situation, we took the complex measurements of drainage, and do away with soil, and sustain and compared common pile with prestressed concrete anchor pile in our sustain

    依據滑坡現狀及穩定性分析評價,確定了排水、清方減載、支擋相結合的綜合整治方案,並對整治方案進行了詳細介紹。
  13. According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province, compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount. in the program, duncan - chang model is applied to earth, elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable

    在程序中土體採用了duncan - chang雙曲線本構模型,樁和錨固層以下的巖體採用了線彈性本構模型,並且在樁和巖土體間設置了無厚度的古德曼( goodman )單元,對于軟弱夾層和已知的滑裂面也採用古德曼單元模擬,錨索採用的是具有初始應力的連續桿單元模擬。
  14. Effect on carrying capacity of pre - stressed soil anchor about grouting technique

    灌漿工藝對土層預應力錨桿承載力的影響
  15. Secondly, compared with specification jgj 120 - 99, the problem of method which be using was pointed out base on a great number of numerical simulation, the interaction between pile - anchor supporting and soil nailing was analyzed

    其次,針對現行樁錨復合土釘支護設計方法,在大量數值模擬的基礎上,通過與規程進行對比,指出現行方法中存在的一些問題,並分析了土釘支護與樁錨支護二者之間的相互作用。
  16. Numerical simulation is carried under different conditions, including ( a ) the different distance between deep foundation excavations and the adjacent structures ; ( b ) different supports are used, such as cantilever piles, row piles with one - layer grouted soil anchor, row piles with two - layer grouted soil anchor, row piles with three - layer grouted soil anchor and soil nailings etc. this paper reveal the law of adjacent structures and bracing structures displacements and surrounding soil settlements. anchor and soil nailing ' s impact on the displacements of adjacent structures is analyzed then. further more, we find the law of displacements of bracing structures, surrounding soil settlements, differential settlement and absolute settlements of adjacent structures that may appear in the process of excavation by steps

    模擬分析了近鄰建築物在不同距離的條件下,懸臂支護、一層錨桿與排樁聯合支護、兩層錨桿與排樁聯合支護、三層錨桿與排樁聯合支護、土釘支護等幾種支護情況下的深基坑開挖過程,對深基坑工程開挖過程中近鄰建築物的變形、支護結構變形以及基坑外地層沉降的發展變化規律進行了分析總結;對錨桿和土釘支護對建築物變形的影響作了詳細地分析,找到了一些基坑開挖過程中基坑支護結構變形、周圍地層沉降、近臨建築不均勻沉降及絕對沉降的發展變化規律,得到了一些對深基坑工程設計和施工有工程實際意義的結論。
  17. 1 toyo mulching is a double layer of non - woven fertilizer strip which is installed inside the three dimension pvc coated wire mesh and fixed on any non - soil surface slope with galvanized mild steel anchor and sub - anchor to provide full vegetation cover to the slope

    1直身吹附法是將兩層帶狀肥料及植物種子安裝在鐵網中,並利用金屬勾穩固在噴漿斜坡上,使斜坡表面達至綠化效果。
  18. In this paper, author compare with shenzhen holiday plaza project ( be known as firstly deepest foundation pit, deepest excavation depth is 21m ), use combinative method for theory guidance, test study, simulation analysis, project application and information feedback, entirely and deeply study prestress anchor cable composite soil nail, and also make a pilot study for deformation of pile anchor composite soil nail

    本文以深圳假日廣場深基坑支護工程(號稱「深圳第一坑」 ,最深開挖21m )為背景,採用了理論指導、試驗研究、模擬分析、工程應用和信息反饋相結合的方法,對預應力錨索復合土釘支護結構進行了全面深入的研究,對樁錨式復合土釘支護結構的變形進行了初步研究。
  19. This paper respectively uses the method of expansion of cavity and fem to analysis the soil compaction effect of anchor jacked pile while sinking, and compares the calculation result of the two methods by combining effect is valuable to the application of engineering

    摘要分別用柱形孔擴張法和有限元方法對錨桿靜壓樁沉樁過程中的擠土效應進行了分析,並結合工程實例對兩種方法計算的結果進行了比較,很好地探討了沉樁擠土規律,具有一定的工程實用價值。
  20. Sprayed concrete fixed the soil ; anchor arms were embedded deeply in the soil, active supported the soil, and acted with the soil, all of those effective kept and increased the strength of the soil

    噴射混凝土與土層面產生嵌固效應;錨桿深固於土體內部,主動支護土體,並與土體共同作用,有效保持和提高圍土強度。
分享友人