spillway dam 中文意思是什麼

spillway dam 解釋
泄水壩
  • spillway : n. (水庫的)溢水口,溢洪道;溢洪堰。 a conduit spillway 溢洪道;溢水管。
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley.

    方案表明,在寬闊而平坦的河谷內,一種在中間段設置混凝土重試溢洪道的土壩是最經濟的。
  2. All right, this is a topographic map of the dam. this is the spillway

    看,這是大壩的地形圖,這是泄洪道
  3. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊溢洪道為例,計算了溢洪道上所受的水流荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。
  4. Experimental research on crest spillway flood energy dissipation for the double - curvature arch dam

    雙曲拱壩壩頂表孔泄洪消能布置試驗研究
  5. Whoever goes into the dam needs to be able to operate the spillway mechanism

    洛根,進入大壩的人要能能操作泄洪裝置才行
  6. The flood resulting from a dam breaking, and opening by break very spillway, and in order to guarantee safe enlarging the outflow of reservoir, spreads quickly and often causes catastrophes

    大壩潰決造成的洪水、以破壞方式開啟非常溢洪道造成的洪水以及為保證大壩安全加大水庫放流形成的洪水,傳播速度快,破壞性巨大。
  7. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  8. Momentum integral equation of turbulent boundary layer on ogree section of spillway dam in considering the gravity and centrifugal force

    考慮重力及離心力的溢流壩反弧段紊流邊界層動量積分方程
  9. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  10. ( 6 ) 3d integer model of spillway and frusta of brake are established and numerical computation of 3d viscous flow over spillway is completed. the influence of frusta of brake for design parameters such as shape of free surface, pressure on dam, flux coefficient is computed aim at type of frusta of brake and disposal on dam and compute result of different type of frusta and disposal model is compared

    6 )通過建立溢流壩和閘墩的三維整體模型,完成了對三維過壩水流粘流場的數值計算,針對閘墩的型式及在壩面的布置計算了閘墩對水面線形狀、壩面壓力、流量系數等設計參數的影響,並將不同墩型與布置形式的計算結果進行比較。
  11. Controlled quarry blasting for dam - filling materials in spillway at gongbo gorge hydropower station

    公伯峽水電站溢洪道壩料開采爆破控制
  12. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  13. In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model

    在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及溢流壩堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提出設置碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部位開裂,解決大壩越冬層面水平施工縫的開裂問題。
分享友人