steel pile 中文意思是什麼

steel pile 解釋
板樁結構物鋼樁
  • steel : n 1 鋼,鋼鐵。2 鋼製品;刀,劍,打火鐮;(女人胸衣等中的)松緊鋼條[絲];鋼磨;〈美國〉剃刀,小刀...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. Abstract : with the composite process of root - pile and infilling consolidation by cement injection with foraminate - steel - tube ; good effect has been made in the treat of sideslip of one fly - over bridge. the work machanism and technology of cement injection with foraminate - steel - tube are discussed in following article

    文摘:用樹根樁及帶眼鋼管充填壓密灌漿工藝復合處理某立交橋側移的實踐取得很好實效;對帶眼鋼管灌漿的工藝與機理作了討論,認為其具有廣闊的應用前景。
  2. Design of steel pipe pile project in sudan oilfield

    蘇丹油田鋼管樁工程設計
  3. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  4. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  5. Steel composite pile

    復合鋼樁
  6. End - bearing steel h - pile

    端部承載的工字鋼樁
  7. I - steel pile

    工字型鋼樁
  8. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  9. By means of the numerical simulation and considering many factors synthetically such as steel weight of the platform structure, the construction program, investment costs and geotechnical risk, the contrastive analysis has been made to the types of the platform structures with skirt piles and main pile, and finally it is determined in use skirt piles for weizhou 11 - 1 platform

    通過數值模擬計算,綜合考慮平臺結構用鋼量、施工方案、投資費用和工程地質風險等多種因素,對平臺採用裙樁結構型式和主樁結構型式兩種方案進行了對比分析,最終確定潿洲11 - 1平臺採用裙樁結構型式。
  10. Steel - shelled concrete pile

    鋼殼混凝土樁
  11. These problems are discussed in the light of the construction of the steel tubular pile foundations for bahekou heavy cargo wharf in the three gorges and yangjiawan container & general cargo wharf

    文章依託三峽壩河口重件碼頭和楊家灣集裝箱雜貨碼頭鋼管樁基礎工程,探討了以上問題。
  12. Supported by steel sheet pile in deep foundation excavation

    鋼板樁深基坑支護的應用
  13. Closure technique of steel sheet pile cut - off walls

    鋼板樁防滲墻合攏技術
  14. Safety monitoring of steel sheet pile cut - off walls in yangtze dyke

    長江堤防鋼板樁防滲工程安全監測
  15. Steel sheet pile cellular cofferdam

    鋼板樁格型圍堰
  16. The design amp; construction of single - wall steel pile cofferdam in deep water

    深水基坑單壁鋼板樁圍堰設計與施工
  17. Steel pile type dolphin

    鋼樁系船墩
  18. I - section steel pile

    工字型鋼樁
  19. Channel - steel - pile composite soil nailing ( ccsn ) is a new bracing structure of foundation pit, which was developed by cai changbin in 2000. in recent years, ccsn has been used widely in the region of wenzhou, taizhou. . etc, and has obtained good economic performance and social performance

    錨管樁復合土釘支護是蔡昌斌開發的一種新型基坑支護形式,近年來已在溫州、臺州等地區得到廣泛應用,取得了良好的經濟效益和社會效益。
  20. Construction layer top will use scaffolding steel pile to pull in and out side scaffolding

    3施工層頂端用腳手架鋼管拉結內外腳手架。
分享友人