  1. The management of the assembly line of clothing is the most important link in the production of the clothing, and chooses a good procedure synchronization scheme is a complicated and changeable course in step assembly line among them, and it needs not only the expert ' s abundant knowledge and flexible judgment, but also a large amount of repetitive operation. this paper grades the assembly line of clothing intelligently in principle of the basis expert system, and develops quick and high - efficient arrange system of procedure synchronization, and makes the production management of the clothing reach the request for the quick reaction by using intelligent technology

    服裝流水線的管理是服裝生產中最重要的一個環節,其中編排流水線的同步化方案是一項復雜多變的過程,既需要專家的豐富知識和靈活判斷,又牽扯到大量的重復進行的思維過程,本文依據專家系統的原理對服裝流水線進行智能化編排,開發出迅速高效的工序同期化的編排體系,運用智能技術,使服裝生產管理達到快速反應的要求。
  2. Step - by - step guide to deploying password synchronization

    的用戶還同時下載了:
  3. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  4. The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。