submarine laying 中文意思是什麼

submarine laying 解釋
海底鋪設
  • submarine : adj 水下的,海中的,海底的,海生的。 a submarine armour 潛水服。 a submarine boat 潛艇。 a submar...
  • laying : n. 1. 布置;層積;鋪設。2. (炮的)瞄準。3. 搓繩;搓繩法。4. 最初所塗底層。5. 產卵期;產卵數;一次孵的蛋。
  1. ( to damage the english fleet by offensive raids against the naval forces engaged in watching and blockading the german bight, as well as by mine - laying on the british coast and submarine attack, whenever possible

    「通過在任何可能的時機,對擔負監視和封鎖德國海岸的英國海軍力量的進攻性奇襲,同時對不列顛海岸的布雷和潛艇攻擊,達到殺傷英國艦隊的目的。
  2. Article 12 when the laying of submarine cables and pipelines and other marine engineering operations require that those submarine cables and pipelines already laid be moved, prior consultations must be conducted with the owners of the aforesaid installations and an approval must be obtained from the competent authorities before the said engineering project starts

    第十二條鋪設海底電纜、管道及其他海上作業,需要移動已鋪設的海底電纜、管道時,應當先與所有者協商,並經主管機關批準後方可施工。
  3. A burst of activity associated with the laying of submarine cables soon confirmed the challenger's observation.

    伴隨著鋪設海底電纜而進行的突擊活動很快證實了「挑戰者」號的探測結果。
  4. A burst of activity associated with the laying of submarine cables soon confirmed the observation that many parts of the ocean were three miles.

    伴隨著鋪設海底電纜而進行的突擊活動很快證實了探測結果;海洋的很多部分深達3英里。
  5. Article 18 the competent authorities shall collect data concerning submarine topography and the distribution of structures at sea in order to offer consultancy services for laying of submarine cables and pipelines, and for conducting relevant investigations and surveying activities

    第十八條主管機關應當收集海底地形、海上構築物分佈等方面的資料,為海底電纜、管道的鋪設及其調查、勘測活動提供咨詢服務。
  6. Provisions governing the laying of submarine cables and pipelines

    鋪設海底電纜管道管理規定
  7. In 1960, the government began laying a submarine pipeline to link lantau with the mount davis service reservoir

    1960年政府開始興建接連大嶼山與港島摩星嶺的海底輸水管, 1963年建成。
  8. Article 11 operations such as the investigations and surveying activities for identifying the routes for laying submarine cables and pipelines, the laying, maintenance, and dismantling, must not hamper the normal order of marine navigation and transportation

    第十一條海底電纜、管道的路由調查、勘測和鋪設、維修、拆除等施工作業,不得防害海上正常秩序。
  9. Article 5 the owners of the submarine cables and pipelines ( hereinafter referred to as " the owners " ) shall file a written application with the competent authorities 60 days before they start the investigations and survey of routes for laying the submarine cables and pipelines

    第五條海底電纜、管道所有者(以下簡稱所有者) ,須在為鋪設所進行的路由調查、勘測實施六十天前,主向管機關提出書面申請。
  10. Article 14 the competent authorities shall have the power to supervise and inspect the laying, maintenance, alteration, dismantling and abandonment of submarine cables and pipelines as well as the relevant investigations and surveying activities conducted for the laying of submarine cables and pipelines

    第十四條主管機關有權對海底電纜、管道的鋪設、維修、改造、拆除、廢棄以及為鋪設所進行的路由調查、勘測活動進行監督和檢查。
  11. Article 15 the plan for determining the routes for laying submarine cables and pipelines beyond the petroleum exploitation zones in order to exploit marine petroleum resources shall be submitted to the competent authorities prior to the examination and approval of the overall plan for the exploitation of oil ( and gas ) fields ; and the competent authorities shall give approval after consultation with the competent state authorities for energy resources

    在海洋石油開發區內鋪設平臺間或者平臺與單點系泊間的海底電纜、管道,所有者應當在為鋪設所進行的路由調查、勘測和施工前,分別將本規定第五條、第六條規定提供的內容,報主管機關備案。
分享友人