subsidence area 中文意思是什麼

subsidence area 解釋
沉降面積
  • subsidence : n. 1. 沉澱;沉下,陷下。2. 平靜,平息;減退,衰耗。
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. In order to control the land subsidence, adjusting three dimensional exploitive positions and moderately utilizing the leakage recharge from its upper shallow groundwater play a key role in realizing the sustainable development of deep groundwater resources in this area

    在控制地面沉降的條件下,深層地下水持續利用的對策是調整開采三維布局,適度開發利用淺層地下水對深層地下水的越流補給。
  2. On the basis of the discussion of the ecological rehabilitation on subsidence land of coal extraction, the land structures of nourishment, plane and perpendicularity on subsidence area of coal extraction are differently designed. on nutritive structure green crops are mainly common crops, green vegetables, green forage crops and acquatic creatures. on plane structure the center of the subsidence land of coal extraction can be used as fish culture in net cage, the periphery can be established as fish pool and economic crops in water, and the outmost layer can be used as high - yield field, vegetable shed, domestic animal breeding area and fruit - bearing forest. on vertical structure the deepwater area can be established as fish pool and economic crops in water, and the uppermost layer can be developed as acquatic and semi - acquatic crops or dry farming crops

    在討論採煤塌陷地生態復墾的基礎上,對新泰市採煤塌陷區生態復墾用地的營養結構、平面結構和垂直結構進行了優化設計.在營養結構上,綠色作物主要是農作物、蔬菜、飼料及水生生物.在平面結構上,在塌陷的中心地帶實施網箱養魚,外圍區建立精養漁塘和水生經濟作物,最外層生態復墾為高產農田、蔬菜大棚、畜禽養殖區和林果地.在垂直結構上,在積水區建立精養漁塘和水生經濟作物,最上層則發展水生、半水生及旱作綠色經濟作物
  3. Study on surface subsidence in panji mining area

    淮南潘集地區地表沉降初步研究
  4. The tectonism in this area can be divided into three phases, that is the folded basement formation and stable ancient land in pre - mesozoic, ancient land cracking phase in mesozoic, the faulted activity and subsidence phase in cenozoic

    本區構造變動劃分為三個大的階段,即:前中生代褶皺基底的形成和穩定古陸發育階段、中生代古陸裂解階段、新生代塊斷活動及整體沉降階段。
  5. The influence of the subsidence area on entironment in liudaowan coal mine

    六道灣煤礦塌陷區對生態環境的影響探討
  6. Through summarization for complicated geohydrology and engineering geology condition of research area, the non - stability 3 - dimension flow model of ground water and land subsidence model were established in this thesis. the coupled models of ground water and land subsidence were combined with a large series of water level observation and land subsidence information to debug the parameters and ascertain the models

    兩者通過含水層的水位內在聯系耦合在一起,並根據研究區水文地質條件及抽水試驗資料,結合大量的水位觀測序列資料及地面沉降觀測資料對模型進行調參,標定地下熱水運移的三維有限元數值模型,所建模型可以對地下水水位及地面沉降同時進行模擬預測。
  7. The settlement isoline map, based on subsidence prediction in mining area, is difficult to be directly applied to land planning in mining area and mgis analysis due to its different data structure from digital terrain map

    摘要基於開采沉陷預計的採煤區下沉等值線圖不便於直觀地反映礦區地形的動態變化,其圖形數據結構與數字地形圖存在差異,難以直接用於規劃設計和礦區gis分析。
  8. Asgis involved many subjects such as computer science, geography and meteorology, gisapplication in geology field is just underway especially in land subsidence research. based on the knowledge and demands above, it is necessary and urgent to establish aspecial gis application system, which is composed of professional base models ( base rockstructural model, structural model of quaternary deposition ) and professional applicationmodels ( groundwater aquifers system structural model, land subsidence forecast andanalysis model ). based on this gis platform, “ management information system of landsubsidence in suxichang area ”, it can deal with and analyze the magnificent multi - originalgeological information visually

    最終研究成果形成了由專業基礎模型和專業應用模型構成的、能對龐大的多源地學信息進行可視化分析處理的綜合應用型gis ,該系統不僅具有一般gis所具有的常用功能,更重要的是可以藉助專業應用模型(如地面沉降相關預測模型)進行計算評價及輔助決策,實現了對蘇錫常地區地面沉降地質災害的科學監測和管理,具有較高的理論意義和應用價值。
  9. An active measure for ground subsidence control is to move the exploited horizon upward to shallow area and make it close to the recharge and discharge area of groundwater

    控制地面沉降的一個積極措施是將開采層位上移至淺層,使其接近地下水的補給區和排泄區。
  10. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  11. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時間和空間分佈規律以及災害的防治原則和對策等;然後,以洪水災害對交通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了洪水對交通線路的破壞方式,水毀原因以及水毀機理,並提出了交通線路水毀防禦系統框架和對策;第二,分析了雨季邊坡塌方災害的區段預測方法;通過可視化編程,編制了雨季邊坡塌方災害的工點預報程序,並結合arcview實現了預測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和預測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛期庫區線路災害的原因進行了分析,並探討了利用數量化理論對路基防護工程抗洪能力進行預測的意義;第五,提出從風險的角度對交通線路的防災減災進行管理,對風險估計的相關問題進行了論述,並探討了交通線路水害危險區段的劃分問題。
  12. Correctly evaluating hydrological geology characteristics of mining subsidence area is the key of realizing continuable utilization of mining subsidence land

    摘要正確評價採煤沉陷區的水文地質特徵是實現採煤沉陷土地持續利用的關鍵。
  13. Strengthening soft soil foundation by mixing cement with soil, which is a specific application of strengthening large - area foundation in piled structure by powder jetting mixing, can increase load supporting capability of soft soil foundation, decrease subsidence and increase stability of edge slope

    摘要水泥土攪拌法加固大罐基礎是利用粉體噴射攪拌法樁裝結構加固大面積地基的具體應用,它可以增加軟土地基的承載能力,減少沉降量,提高邊坡的穩定性。
  14. Study on land reclamation in mining subsidence area

    採煤沉陷區土地復墾研究工程實踐分析
  15. Feasibility analysis of building a tailings bin in the mining subsidence area in a coal mine

    某礦利用採煤沉陷區建尾礦庫可行性分析
  16. Study on the forecasting and maintenance system of special railway subsidence in mine area

    礦區專用鐵路開采沉陷預計及治理系統研究
  17. Secondary reclamation feasibility analysis for mining ground subsidence area in plain

    平原採煤塌陷區兩次復墾可行性分析
  18. Study on reclamation and filling of ground subsidence area in thick soil mining area

    西部巨厚黃土礦區采動塌陷區復墾充填研究
  19. On analyzing the current status of land use in kailuan coal mining subsidence area, the feasibility of rebuilding coal mining subsidence area as artificial wetland and a national nature dependency in kailuan was explored

    摘要分析了開灤煤礦採煤下沉區的利用現狀,提出了將採煤下沉區改建為人工濕地,建立開灤沉降濕地自然保護區的設想,並進行了可行性分析。
  20. According to the annual production program, predictted the subsidence by probability - integral method, and then advanced the method that restore the irrigation and draining function of the water system on the ground in the subsidence area, it is changing route of ditch and river system reconstruction

    根據張集礦年度開采計劃,對礦區未來可能產生的開采沉陷採用概率積分法進行預計,根據預計結果提出了塌陷區內水系灌溉排澇功能的動態恢復治理方案,即水渠改道和水系重建。
分享友人