surface water recharge 中文意思是什麼

surface water recharge 解釋
地表水補給
  • surface : n 1 表面;地面;水面;廣場,空地。2 外觀,外表,皮毛。3 【幾】面;切口;【航空】翼面。adj 表面的...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • recharge : vt. 1. 【電學】給…再充電;再裝填(彈藥等);再裝載。2. 再襲擊。3. 重行告發;再控告。n. 再襲擊;再裝火藥。
  1. The agency will require the right to spread surface water, including reclaimed wastewater for ground water recharge.

    為了地下水人工補給,該機構需有引滲地表水(包括已回收的廢水)之權。
  2. In effecting recharge by flooding, water is spread over the land surface in a thin sheet.

    以漫灌法所進行的補給是將水成片地鋪灑在地面上。
  3. The results are as follows : ( 1 ) if we increase the pumping water by 493 x 104m3, the amount of leakage recharge of rubber dam will rise by 231x 104m3 ; which indicates pumping by rubber dam can excite much more surface water infiltrate so as to supply groundwater. thus the utilization ratio of water source is increased, and it provides the reliable guaranty for enough supply of the groundwater storage in wet year. ( 2 ) under the condition of present status, the groundwater exploitable resource in wet year is 3670 104m3

    最後,通過數值法反復調算計算出本區地下水的允許開采量,計算結果表明,在現狀開採的條件下,大沽河地下水庫豐水年( p = 20 )時地下水允許開采量為13670 10 ~ 4m ~ 3 ,平水年( p = 50 )時地下水允許開采量為12054 10 ~ 4m ~ 3 ,枯水年( p =加% )時地下水允許開采量為10951xl了砰。
  4. 11 can be a subsurface runoff parameterization with water storage and recharge based on the boussinesq - storage equation 625 written as 11 ee sineee sine. nnnnktaxbtnnuxktbtnsknnktbtaxnnuxktbtnsknnhxtwfnxhkbwfnxhkb letting t tend to infinity, one can get the steady aquifer function hs 13 : 1 sinee. uxaxnsksnnnfnhxxhkb multiplying through by the specific yield, f, and in - tegrating with respect to x between 0 and l gives the drainable storage associated with this steady - state free surface

    下面考慮整個潛水面的一種穩定狀態,也就是是對于任意一個恆定的入滲,當時間時潛水面將達到穩定的狀態不再發生變化,這個時候顯然有, 0 , . sntnt t , ssqnl也就是入滲補充量等於地下徑流量
  5. Yang and xie 9 developed a numeri - cal model for the moving boundary problem through reducing it to a fixed boundary problem by a coordi - nate transformation. it is necessary to reduce the a subsurface runoff parameterization with water storage and recharge based on the boussinesq - storage equation 623 computational cost of the groundwater model so that it can be applied to a land surface model for climate studies

    文獻9通過一個坐標變換將運動邊界問題轉化為一個固定邊界問題,進一步改進了該土壤水模型的數值計算方法,使其減少計算量,達到能在一般通用的模式中實際應用
  6. Let h be the deviation of the true shape of the free surface from the shape it would hold if the water were distributed in a steady state, then 1 sine. snnaxnnnshxthxthxttfsxkbs using darcy s law and ssqnl, the discharge from the aquifer is given by 0001. xssxsxnnnnsnhqsntfkuhxhhfkuhhxhqfkuhxfsslfkttsk it is easy to get the mean subsurface runoff of this grid bqt. bqtql 626 science in china : series d earth sciences for the aquifer, the continuity equation holds. dsntlqsntdt new subsurface runoff parameterization, a synthetical recharge series is applied to some aquifers with dif - ferent parameters. firstly, the parameter is tested : three aquifers with the same following parameters are used : d 1. 5 m, k 0. 0008 m s, l 100 m, f 0. 34, p 0. 5, three different slopes are considered : 0. 002, 0. 02, 0. 05. fig

    在該模型中有三個重要的模型參數的:整個潛水面平均厚度的線性化參數d ,整個潛水面的平均坡度,以及飽和和水力傳導度k .首先考察一下該模型對于坡度的敏感性:取d 1 . 5 m , k 0 . 0008 m s , l 100 m , f 0 . 34 , p 0 . 5 .取下面三個不同的坡度0 . 002 , 0 . 02 , 0 . 05 .圖2 a給出是實驗給定的入滲強度的時間序列,圖2 b給出的是分別選取這三個坡度時該地下徑流機制所產生的不同的地下徑流的情況
  7. In the term of principles of regional conservational development, to define the area in which we can have estate objection, where concentrate in the area of beikang, nankang, jiuqu and from yuanbaishan to shaoer whose surface area is 5. 0 km % ( 4 ) in the light of ground water recharge function, the main way to define contents including existing green conservation, water source region conservation is to ecology construct

    按照區域保護性開發的原則,界定可適宜進行房地產開發的建設區域,主要集中在北康、南康、九曲及元白山至邵而莊一帶,面積約5 . 0km ~ 2 。 ( 4 )根據研究區的主要生態功能:地下水補給功能,研究區內保護重點為現有綠地的保護、水源地的保護。
分享友人