tailings dam 中文意思是什麼

tailings dam 解釋
尾礦壩
  • tailings : 廢料;篩下料;尾餾分
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. An automatic safety monitoring system for the no. 2 tailings dam in dexing copper mine

    德興銅礦2號尾礦壩的安全自動監測系統
  2. Study on distributing state of lenticle in tailings fill dam

    尾礦堆積壩透鏡體分佈狀態研究
  3. Abstract : the control methods of tailing dam of wulongquan mine were introduced, some new techniques as recovery and utilization of the wash - or e tailings of limestones and dolomites, and draining seepage and solidification technology by radial well to reinforce the main dam were described in detail

    文摘:介紹了烏龍泉礦尾礦庫治理的具體方法,詳細地闡述了回收利用石灰石、白雲石洗礦尾礦的回收利用和採用輻射井排滲固結技術加固主壩等新工藝。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  5. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  6. Static stability analysis of seepage of tailings dam

    尾礦壩滲透靜力穩定分析
  7. Equivalent static stability analysis of earthquake response of tailings dam

    尾礦壩地震反應的擬靜力穩定分析
  8. Study on chaos of saturation line of tailings dam based on grey operator

    基於灰色運算元的尾礦壩浸潤線混沌研究
  9. In view of the technical and safety problems ecnountered in the later - period management of shankoucun tailings dam in meishan iron mine, a series of technical measures were taken to lower the water - table of the dam. as a result, the service life of the tailings dam has been prolonged and the dam has been made to operate in a safe and stable way

    針對梅山鐵礦山口村尾礦庫在後期管理中遇到的技術、安全問題,通過採取一系列的技術措施,降低尾礦壩的浸潤線,達到了延長尾礦庫使用壽命,從而使山口村尾礦庫安全、穩定、順行。
  10. An example is given ; and the result is compared with that of the test. the better identical result indicated that the three - dimension model must be adopted in the seepage analysis of the complicated topographical tailings dam ; and the appropriate predigestion can satisfy the precision and reduce the complicity and difficulty

    結果表明,對復雜地形的尾礦壩滲流分析時必須採用三維模型,三維數值計算中對復雜地形進行適當的簡化和概化對結果的影響較小,可以滿足精度要求,因此大大減小了計算的復雜程度和難度。
  11. Three - dimensional seepage analysis for complex topographical tailings dam

    復雜地形尾礦壩的三維滲流分析
  12. Tailings dam performance from uscold incident - survey data

    尾礦壩的運行特徵
  13. Soil properties of qingshan tailings dam of gushan iron mine and reclamation tac tics

    姑山鐵礦青山尾礦庫土壤特性與復墾策略
  14. For the complex topographical tailings dam, neither the complicated and changeable seepage field nor the action of three direction seepage factors at the same time can be fully reflected in the two - dimension model ; as a result the real seepage field cannot be acquired

    摘要對于復雜地形的尾礦壩,由於二維模型不能充分反映復雜多變的滲流域,也不能考慮到三個方向滲流因素同時作用的影響,從而無法體現真正的滲流場。
  15. A point that majiatian tailings fill dam might induce earthquake and rainfall water might result in declination of shear strength of tailings sand soil once the reservoir is closed has been put forward

    並初步提出了馬家田尾礦庫可能會誘發地震和封庫停運后大氣降雨會導致壩體尾礦砂土抗剪強度降低的觀點。
  16. Numerical analysis of seepage field in mijiangou tailings dam to be designed to increase the dam height

    米箭溝尾礦壩加高方案滲流場數值分析
分享友人