  1. The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus

    地震波速法檢測路基擋墻強度,研究的主要內容有:片石巖性和強度及塊體形體對波速的影響;水泥砂漿強度對墻體波速的影響;擋墻整體強度和完整性的評估標準。應用彈性波速度對擋土墻石材、砂漿強度、砂漿飽滿度及擋墻類型的不同反映,在室內外模型試驗和現場生產試驗的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石擋墻墻身的完整性。
  2. Game analysis of rent - seeking in tests on completion

    竣工驗收階段尋租博弈分析
  3. 15 " time for completion " means the time for completing the execution of and passing the tests on completion of the works or any section or part thereof as stated in the contract calculated from the commencement date

    15竣工時間是指合同規定從工程開工日期算起到工程或其任何部分或區段施工結束並且通過竣工檢驗的時間。
  4. 16 " tests on completion " means the tests specified in the contract or otherwise agreed by the engineer and the contractor which are to be made by the contractor before the works or any section or part thereof are taken over by the employer

    16竣工檢驗指合同規定的或由工程師與承包商另行商定的檢驗,這些檢驗是由承包商在僱主對工程或其任何部分區段接收之前進行的。
  5. 4 " tests on completion " means the tests which are specified in the contract or agreed by both parties or instructed as a variation, and which are carried. out under clause 9 [ tests on completion ] before the works or a section ( as the case may be ) are taken over by the employer

    4 「竣工檢驗」指在僱主接收工程或某區段(視情況而定)前按照第9款竣工檢驗進行的檢驗,此檢驗可在合同中說明、或由雙方協商決定、或以變更的形式被指示進行。
  6. In addition, we conducted call tests on shanghai bell s p3s exchange and huawei s c & c08 exchange. the two exchanges were connected via lucent s sdh transmission equipment. the test ended up with successful completion of calls

    通過lucentsdh傳輸設備將上海貝爾p3s交換機和華為c & c08交換機連接起來,並在這兩個交換機之間進行了呼叫測試,測試結果證實能夠完成電話呼叫。