through bolt 中文意思是什麼

through bolt 解釋
【機械工程】貫穿螺栓。

  • through : 副詞1 穿過,通過,經歷;從頭到尾,完全,全部;到最後,到底,徹底;透;完畢。 2 出來。 adj 1 直通...
  • bolt : n 1 螺釘,螺栓。2 (門窗等的)插銷;閂,鎖簧。3 箭,矢;弩箭;【軍事】槍機,槍栓。4 電光,閃電。5...
  1. Dead weight loading simulating that of the bolts was applied at the bolt holes through the agency of steel balls and buttons.

    螺栓荷載是用死荷重來模擬的,以鋼球和壓鈕作為代用件,通過它們將此荷載施加於螺栓孔。
  2. The sentry box of the activity fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make up finalize the design the prefab system. construction swift, being portable, especially suitable for urban municipal administration, entrance guard room, service department, etc

    活動崗亭是通過充分利用夾芯墻板及屋面板的自身強度,通過拉釘螺栓自攻釘將鋼結構底座墻面夾芯板和屋面板連接組成的房屋系統。
  3. And the young girl, kneeling on the top, pressed the two parts of the portmanteau together, and mademoiselle d armilly passed the bolt of the padlock through

    於是那青年女郎膝蓋頂在提包蓋上,把提包的箱蓋蓋好,而亞密萊小姐則把鎖插到鎖臼里。
  4. ( 4 ) diameter of bore for anchor bolt is 50mm, and diameter of reinforcing steel bar is 28mm. both break through the rules which request that the bore diameter should be bigger than the steel bar diameter trebly or not smaller than the steel bar diameter adding 50mm

    ( 4 )設計錨孔直徑50 ,錨筋直徑28 ,突破了規范關于錨孔直徑需大於錨筋直徑3倍或不小於錨筋直徑加50mm的規定。
  5. Homeproductseven roof flat roof fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make

    是通過充分利用夾芯墻板及屋面板的自身強度,經過拉釘螺栓自攻釘的連接而組成的定型活動房屋系統。
  6. Chengdu longquan reixing engineering materials plant set product development, manufacturing and marketing its products and services into one, through the introduction, absorption, development and production of innovative self - drilling bolt grouting hollow products and exclusive ancillary machinery widely used in underground engineering ( traffic tunnel, hydraulic tunnels, mine roadway road and the various uses of anchorage support ) geotechnical engineering ( slope, dike rocks, the deep excavation anchorage support ) repair reinforcement project ( tunnels, dikes, dams, housing construction )

    成都龍泉瑞鑫工程材料廠集產品開發、生產製造及產品銷售與服務於一體,通過引進、吸收、開發、創新生產的自鉆式中空注漿錨桿系列產品及專用配套機械廣泛應用於地下工程(交通隧道,水工隧道,礦山巷道和各類用途的錨固支護)巖土工程(邊坡,堤巖,深基坑的錨固支護)修復加固工程(隧道,海堤,大壩,房屋建築) 。
  7. This paper introduces the advantages of steel structure and high - strength bolt connection, and through the engineering examples, expounds the control of the key quality points of big hexagonal high - strength bolt and the quality examination of the operation of high - strength bolt connection

    介紹了鋼結構及高強度螺栓連接工藝的優點,通過工程實例詳細闡述了對大六角頭高強度螺栓的質量關鍵點的控制以及高強度螺栓連接操作的質量檢查。
  8. Kattor company with its year of experience in the manufacturing of ultra high pressure hydraulic industrial parts. making use of german advance technology and innovative technology, kattor concentrate on bolt & nut fastening, dismantling technology and hydraulic power research. through many research and developement on the field of ultra high pressure hydraulic press, they have developed many practical hydraulic press equipments

    長期以來, kattor公司憑借多年的超高壓液壓元件及設備製造經驗,依託德國精湛的製造工藝和不斷創新的技術,專注于大型螺栓螺母緊固、拆裝科技以及液壓實用動力的研究,在超高壓液壓機具領域不斷研發、創制了大量實用型液壓機具產品。
  9. A long nut is positioned in the slotted full - tang ; a hardened bolt is passed through the butt - cap and then threaded into the nut drawing the handle assembly together for a solid fit

    一個長螺母位於整個根部的槽中,一個熱處理過的螺栓貫通了整個粗大的尾冒並且穿過螺母和手柄裝配在一起,從面得到一個堅固的安裝。
  10. Through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  11. Abstract : through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    文摘:通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  12. 5, last bolt also in order to clip a set of structure, can also water cool off or the steam heat, bringing pressure through an air cylinder, the compulsive powder anticipates and the solid material is even to mix, exaltation produce efficiency

    5上頂栓也為夾套結構,也可通水冷卻或蒸汽加熱,通過氣缸施加壓力,強制粉料和固體物料均勻混煉,提高生產效率。
  13. The distribution features of the stress fields caused by the pretensioned stresses of bolts and cables, and the effects of steel strip to the bolt pretensioned stress diffusion were analyzed through finite difference numerical modelling

    採用有限差分數值計算軟體分析了不同預應力下錨桿、錨索產生的應力場分佈特徵,以及鋼帶對錨桿預應力擴散的作用。
  14. Lorne wakes up with a start, when there bursts out a thrilling vociferation in the western city, followed by a blue bolt flash through the sky without a thunderclap

    羅恩驚醒過來,這時他聽見城西傳來人的大聲喊叫,接著他看見那屋頂的半邊夜空閃過一道藍光,象是閃電,卻沒有雷聲。
  15. The valve cover shall be held in place through the use of a single grooved style two - bolt coupling

    閥蓋應該通過單個溝槽狀雙螺栓聯結器固定住。
  16. This paper studied the warp and stiffness of end - plate connection, and studied how the actual stiffness of end - plate connection influence stiff frame ' s displacement, and some design improvements are proposed. a methodology based on finite element modeling is used to establish strong bolted end - plate connection calculation model, and solved the interface between end - plates question and how to add bolt pretension when imitating end - plate connection ' s elastic material characteristic. through analyzing and comparing calculation results and experiment data, this paper summarized bolt force distribution, connection moment resistance, moment - rotation relationship and connection stiffness

    筆者採用有限元方法,建立高強螺栓端板連接的計算模型,模擬了節點彈性階段的工作狀態,較好的解決了高強螺栓端板連接中的接觸面問題和螺栓預拉力的施加問題,通過對計算結果的分析以及與實驗數據的比較,總結出端板連接在彎矩作用下的螺栓拉力分佈規律、節點抗彎承載力及其影響因素,以及節點剛度特性及其對剛架性能的影響,同時,對端板連接受力變形性能也做了十分有益的分析,為輕鋼節點設計方法的改進提供了依據。
  17. Analysis of pre - tightened stress has been made on pre - stress of low - pressure flange ' s spiral wound gasket, and through changing structure and controlling the manufacture process of gasket, some experiment studies have been made to let mechanical performance meet the needs of bolt load and let flange joint meet the needs of seal behavior

    摘要分析了低壓管法蘭用纏繞式墊片的預緊應力,對通過墊片工藝結構的調整使其力學性能與緊固件的要求一致,從而使法蘭接頭符合操作的密封性要求進行了試驗研究。
  18. 4. to simulate the bolt in rock masses, it is considered as a special component through block elements. bolt cooperates with bock elements and they form the integrate model

    在錨桿支護的加固模擬上,將錨桿視為穿越塊體的特殊元件,參與塊體單元協同工作,形成加錨單元的綜合效應模型。
分享友人