time bias 中文意思是什麼

time bias 解釋
時間補償
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • bias : n 1 成見,先入之見,偏執,偏見 (opp Impartiality ); 傾向,嗜好;癖 (towards)。2 (衣服等上面...
  1. Firstly, second harmonic component ratio and dead angles of two phase inrush ' s dispersion in three - phase transformes are acted as input variable. secondly, the method applies improved algorithm based on the original algorithm of multi - layer forward back propagation network, that is to say, adding last variational effect of weight value and bias value to this time and making use of variable learning rate. at the same time, this method also adopts dynamic form in the number of hidden floor node

    首先,文中將三相變壓器兩相涌流差流的二次諧波含量比和間斷角作為網路的輸入變量;其次,利用對原有bp網路訓練演算法基礎上的改進型演算法(即在計算本次權值和閾值的變化時增加上一次權值和閾值變化的影響以及採用變學習率,與此同時隱含層神經元個數採用動態形式) ,通過樣本訓練使網路結構模型達到最優。
  2. Under suitable conditions, dark brown short rhombohedron crystals could be obtained from nifb mofe protein. both of the longest sides of the biggest crystal were o. lmm. the possibility and time of the formation of crystals, and number, size, quality, and shape of crystals obviously depended not only on the kinds and concentrations of the components in the crystalline solution, but also on the methods for crystallization and technical bias, etc

    對nifb ~ - mofe蛋白的結晶及晶體生長進行了的研究,初步探討了結晶溶液各組分的種類和濃度、結晶方法和實驗操作等與能否出現晶體及晶體的數目、大小、質量、形狀和出晶時間等的相互關系。
  3. Although the accuracy in meterological forecast of tropical cyclones has been distinctly improved, it is still a difficult problem confronting masters and anti - typhoon team leaders of the companies how to steer clear of typhoon reasonably and safely in case that the actual resistance to typhoon is strong enough, the sea area wide enough, and the time permitting ; to avoid unreasonable deviation, anchoring for shelter, blindly rushing onto her path, being involved in storm area, even into the the center of typhoon ; under the limitation of the condition of the sea area and time. how to take correct meassures to escape, such as navigating with wind or windward in bias angle, slowing down, anchoring, berthing alongside the warf, mooring to buoy, etc. as early as possible

    盡管氣象部門對熱帶氣旋監測預報的準確率已經比過去有了明顯的提高,然而船舶在海上如何避離臺風,如何做到在本船實際抗風能力允許、海域條件允許、時間也充裕的前提下合理避臺,安全避臺,避免不合理的繞航、 「扎風」 ,避免盲目冒進「搶風頭」 ,更避免被捲入強風區甚至臺風中心;在海域條件受限、時間尷尬的情況下又如何正確採取偏順航、偏頂航、滯航、錨泊、系岸、系浮等抗臺措施和技術,盡快擺脫臺風的影響,仍然是擺在船長和公司防抗臺領導小組面前的一個實實在在的難題。
  4. The components, microstructure, luminousness, thickness and surface topography of the films were analysised via xrd, uv ? vis, xps, ellipsometric examination and stm. the photocatalytic properties of these fims are characterized by the decomposition rate of methylene blue or rhodamine b. the effect of sputtering power, temperature, o2 mass flow, bias, w - doping and sputtering time on photocatalytic properties are discussed

    採用x射線衍射儀、紫外-可見光分光光度計、 x光電子能譜儀、薄膜厚度測試儀及掃描探針顯微鏡等測試手段,研究分析了薄膜的組分、結構、透光率、膜厚和表面形貌等。
  5. Crossover is implemented using arithmetic crossover operator. then unsymmetrical mutation is conducted using the new mutation operator which can expand the scope of chromosome gene value, at the same time, the chromosome with the highest fitness values are retained for each iteration. a lot of experiments are implemented to obtain the optimized initial weighs and bias

    生成了三維矩陣表示的染色體,進行了聯賽選擇,利用算術交叉運算元進行了交叉運算,利用構造的新的變異運算元,進行了非均勻變異,同時保留了每次進化運算后最優的適應值,通過大量實驗,實現了遺傳演算法優化bp網路的初始權值和閾值的目的。
  6. In chapter three, the all sub - circuits including uvlo, current bias, ldo, oscillator, green mode, slop compensation, power limiting, pwm, ovp, blanking time generator, logic controller are designed and simulated. as a result, all of the sub - circuits are satisfied the requirements

    本文第三章對集成電路內各個模塊包括欠壓保護、電流偏置、 ldo 、振蕩器、綠色模式、斜坡補償、功率限制、脈寬調制、過壓保護、前沿消隱、邏輯控制電路等進行了設計與模擬,且達到了預定的設計目標。
  7. The advantages of the new method of calculating the vtec including : ( 1 ) because the instrumental bias is considered, the vtec ' s change going with time is closer to their real change. ( 2 ) with the precision of calculated the vtec improved, the vtec can reflect the increase of the vtec resulted from the solar flare

    新的求解vtec的方法具有以下優點:考慮了gps衛星和接收機的儀器偏差的影響,計算的電子總量隨時間的變化更接近電離層的實際情況;提高了求解電子總量的精度,計算出的vtec值更能反映耀斑引起的電子總量的增加情況。
  8. The g2 adjustment is a service or factory level adjustment, normally only done at the factory or at installation, which adjusts the bias current for each tube individually so that they all come on at the same time

    每一隻投影管都需要一定量的偏置電流才能夠正常工作,然而,每隻管及其相應的電路參數都會有些差異,因此所需的偏置電流也不太一樣。
  9. The thesis analyses the problems on the noise of apd photoelectric receiving system. author designs apd laser signal receiving system circuits, front amplify circuit, controlling time - series logic circuits, dc / dc transform circuits. and takes apd bias voltage fuzzy control

    分析了apd光電接收系統的噪聲問題,並對apd激光信號接收系統電路、前置放大電路、控制時序邏輯電路、 dc / dc變換電路進行了設計,採取了apd偏壓模糊控制。
  10. Base on two - stage approach, we adjust experimental parameter to develop a new method ( three - stage approach ) to prepare c - bn thin films. the study proves that it is favorable to prepare bn thin films of high cubic phase content. depositing time and substrate bias voltage in the first stage are 5 min and - 180v respectively

    根據si片上bn薄膜的反射光譜r ( )和熔融石英片上bn薄膜的反射光譜r ( )和透射光譜t ( )各自獨立的計算了bn薄膜的光學帶隙,利用兩種方法分別計算立方相含量均約為55 %的bn薄膜的禁帶寬度為5 . 38ev和5 . 4ev ,其結果均和由經驗公式計算得到的結果非常接近。
  11. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍存在的並聯庫群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模式的變量_ i的通用目標函數,為防洪會商決策,提供了有效的人工干預介面,根據實時性要求提出動態分配防洪庫容的庫容分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步迭代求解技術,能最大限度體現決策者的偏好,保障解的合理性和可操作性。
  12. The study on low temperature pvd deposited sic film was carried out - m - employing bias assisted magnetron sputtering. furthermore, pvd deposited sic film mainly containing cubic phase was achieved at room temperature for. the first time

    採用偏壓輔助rf濺射法,對低溫物理氣相沉積sic薄膜進行了研究,並首次在室溫下制備出含有? sic構相併以其為主的sic薄膜。
  13. He pointed out that, starting in the 1990s, home bias began to decline discernibly, as a consequence of a dismantling of restrictions on capital flows and the advance of information and communication technologies that has effectively shrunk the time and distance that separate markets around the world

    他指出自九十年代開始,本土偏好的投資心態明顯減退,原因是對資金流動的限制陸續撤銷,以及資訊科技長足發展,大大拉近了世界各地不同的投資市場在時空上的距離。
  14. 3 ) < wp = 12 > using perturbation analysis, the space - correlation loss and the bearing - estimated error for finite - bandwidth incoherently distributed sources are evaluated analytically, respectively. it is disclosed that bandwidth - induced bearing bias increases monotonously with the signal ' s relative bandwidth. when the relative bandwidth is not small enough to be negligible, the spatially - only processing cannot lead to accurate bearing estimate, that is, the joint space and time processing is necessary for high - precision bearing estimation

    3 )利用擾動分析方法,解析評價了有限帶寬引起的非相干分佈源的空間損耗及其對波達方向估計的影響;分析表明,帶寬擾動引起的方向估計偏差隨信號相對帶寬單調增加;當相對帶寬無法忽略時,為了得到高精度的波達方向估計,需要進行聯合空時處理。
  15. This difference of foundation, however, is not completely from the difference of factors between two parts of china. it rather origins from the difference of " external environment " which formed in a long time, i. e. the middle and west china ' s lag i s mainly resulted from the plan - economy - system, the policy bias to the east china from 1978 and the weakness of its own " soft " environment

    但是,形成這一基礎的根源並非完全是資源稟賦上的差異,其真正的原因在於長期以來「外部環境」上的差別,即中西部地區各方面的落後不僅主要來自建國后的計劃經濟體制的影響,而且與改革開放后對東部的政策傾斜以及其自身在「軟」環境上的弱勢有關。
  16. Cubic nitride boron ( c - bn ) films have been prepared at room temperature ( 25 ) by radio frequency plasma enhanced pulsed laser deposition ( rf - pepld ), assisted with substrate negative bias. in this paper, we primarily studied the effect of laser energy density, radio frequency power, substrate bias and depositing time on the growth of c - bn films, and analyzed the formation process and mechanism of c - bn films deposited by rf - pepld method at room temperature

    本文採用偏壓輔助射頻等離子體增強脈沖激光沉積( rf - pepld )方法在常溫下( 25 )制備立方氮化硼( c - bn )薄膜,初步研究了薄膜沉積參數:激光能量密度、射頻功率、基底負偏壓和鍍膜時間對立方氮化硼薄膜生長的影響,並分析了常溫下用rf - pepld方法沉積立方氮化硼薄膜的形成過程和機理。
  17. Negtive bias voltage and deposition time were changed to examine their role on the property of adhension between kapton film and oxide coating of al or si

    本文利用al - si合金和純al作為靶材,通過多弧離子鍍的方法在kapton膜上制備防護膜層。
  18. Based on the study of r - 2r resistor network, a new precision resistor network is also presented. and the high - speed current switch, reference ampler, bias circuit are described in terms of their design principles and circuit structures. this architecture implements the 8bit d / a converter and the settle time achieves 110ns

    針對高速的要求,在研究r - 2r電阻網路基礎上設計了一種新型精密電阻網路;同時著重闡述了包括八個匹配的共射極電位不變的電流開關、基準放大器、偏置電路等在內的基本單元電路的設計原理和結構。
  19. The best parameters are : negtive bias voltage 200v ; deposition time 10min

    Ao對kapton薄膜有較嚴重的侵蝕作用。
  20. The results that increasing of bias current and shunted resistance and lowing critical current and connected inductance can decrease the transmission time are shown ; ( 4 ) a new type of circuit, ladder shape multiplayer jtl. structure is provided by author, thus output signal of rsfq circuits can be amplified before transfer to room temperature electronics system. it has highly gain of amplify relatively and the double peak structure are avoided through decreasing parasitic capacitance

    ( 4 )針對目前超導與室溫介面電路的電壓放大器存在的「雙峰」和放大增益效率較低的不足,提出了一種全新的階梯式多層jtl電壓放大電路結構,較好的解決了以上的問題,通過初步的模擬分析證實,該電路的構思極負有創新性。
分享友人