time displacement curve 中文意思是什麼

time displacement curve 解釋
時間位移曲線
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  • curve : n 1 曲線;彎曲;彎曲物。2 曲線規 (=French curve);【機械工程】曲線板;【棒球】曲線球;【統計學...
  1. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究錨桿在不同荷載作用下,錨桿的工作狀態從彈性到彈塑性發展的整個過程,本文進行了錨桿受力的模型實驗研究,根據實驗結果提出了剪應力與位移的彈塑性本構關系表達式,並根據錨桿受力的基本方程,求解得出了錨桿在不同工作狀態下從彈性到彈塑性滑移的全過程中錨桿的內力分佈。
  2. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  3. According to the frndamental and the steps of this method, we cans use the linear regress filter method to make the simulation of the wind load and then we can educe the curve of the time - process wind velocity. after that step, we can get the chart of the dynamic wind load which we can deliver the crosswind into the particle wind load and put them on the corresponding cell nodes. then we can do the analysis of the dynamical wind load through the time - process analysis to get the max value of the displacement

    根據線性回歸濾波器法的基本原理和步驟,藉助相關軟體進行風荷載的人工模擬並得出風速時程曲線,進而轉化為風動力譜,由此將橫風向風力表達成節點風荷載作用於相應的單元節點上,按時程分析法對該空間桁架體系進行風荷載的動力分析,求出結構在進行風動力荷載分析時,結構相應節點對應的最值位移值。
  4. The development of shear band was researched by analyzing the confining pressure - time history, volumetric curve and displacement field of pfc model

    通過分析圍壓時步曲線、體變曲線和不同階段的顆粒位移場的變化規律,研究了剪切帶的形成與發展規律。
  5. Layout input pole length ' s locus when the mechanism follows kadang movement in two ways. one is multinomial curve locus and the other is linearity intermixed by parabola curve locus. we study the displacement > velocity and acceleration curve consulting time under variety velocity characters, and get the best curve and the best velocity character, which will have a very important significance for kadang movement ' s input control of this mechanism

    對卡當運動輸入桿件的伸長進行了軌跡規劃,採用了多項式與混有拋物線的線性函數作為規劃軌跡,研究了不同速度參數條件下的位移、速度、加速度的時間變化曲線,給出了最優曲線和最優速度,這對于機構卡當運動輸入控制的實現和優化具有重要意義。
  6. The corresponding variation of olltput voltage due to the change of total laser intensity is measured by a photo detector. a displacement - time curve can be obtained by calibrating the re1ationship between block position and output voltage of the photo detector. through the use of simple mathematical operation, the bird - shell velocity and acceleration histories can be determined, and therefore the bird - shell instantaneous velocity at any points within the measurement range can be obtained

    該系統發射的一片狀激光受運動鳥彈的依次阻擋后,相應的光強度變化將被測出並轉換為位移時間曲線,經過簡單的數學運算,該系統能用來確定鳥彈速度和加速度的時間歷程,因而可確定鳥彈在被測區域內任一點的瞬時速度。
  7. Based on the improved codog power plant experiment rig of harbin engineering university, the thesis has set up the displacement measurement system of the middle slippage of the synchronous self shifting ( s. s. s. ) clutch at the first time, and obtained the curve which follows the time variability of the axial displacement when engaging or disengaging and reflects the dynamic change of the s. s. s. clutch for the main engine changeover of codog power plant experiment rig

    本文的研究是建立在對我校原有codog物理模擬實驗臺改進的基礎上進行的,首次建立了三s離合器中間滑移件位移測量系統,獲得了三s離合器中間滑移件在嚙合及脫開過程中的軸向位移隨時間的動態變化曲線,該曲線從一個側面反映了切換過程中三s離合器的動態變化。
分享友人